TT-6239 SIEMENS SGT 600 TURBINE, DLE, YEAR 2011, 25 MW, 10.5 KV, 50 Hz
MAINTENANCE RECORD:
A-THE MAINTENANCE MAINLY INVOLVES PASSING HOT AIR FROM THE DRYER TO THE COMBUSTION CHAMBER. WE HAVE PREVIOUSLY TRIED TURNING THE DRYER. DESICCANT IS PLACED INSIDE THE STEAM DRUM OF THE WASTE HEAT BOILER.
B-THE LAST RUN WAS IN DECEMBER 2017, AND IT WAS STARTED EVERY THREE MONTHS FOR ABOUT A YEAR. FINALLY, WE COMMUNICATED WITH SIEMENS TO ADOPT A LONG-TERM MAINTENANCE METHOD, SO WE DID NOT ATTEMPT TO IGNITE AGAIN.
IMMEDIATE DELIVERY
Learn More
TT-5544 SOLAR MARS100 TURBINE FOR COMPRESSING, 10 HOURS, YEAR 2021, VERSION: 16000SA CS/MD
SOLAR MARS100 TURBINE FOR COMPRESSING
YEAR: 2021
HOURS: 10
TYPE: MECHANICAL DRIVE PACKAGE.
NOT INSTALL THEM AT PRESENT
STILL HAVE BEEN PARKED IN BOXES
QUANTITY: 2
Learn More
TT-8656 SIEMENS SGT5 4000 F GAS TURBINE & GENERATOR – NEW, 54 MW, YEAR 2016, 50/60 Hz
1. NEW AND UNUSED SIEMENS GAS TURBINE & GENERATOR
2. HEAVY DUTY, SINGLE CASING, AXIAL FLOW DESIGN AND DUAL FUEL GAS TURBINE.
3. MODEL: SGT54000F
4. BRAND: SIEMENS AG
5. 54 MW
6. YEAR OF MANUFACTURE: 2016
7. FREQUENCY: 50 Hz
8. FUEL: NATURAL GAS (NG) AND DIESEL OIL (DO)
9. GUARANTEED PERFORMANCE:
10. GROSS POWER OUTPUT [MW]: 298,2 (NG) – 301 (DO).
11. GROSS HEAT RATE [KJ/KWH]: 8979,3 (NG) – 9538,5 (DO).
12. GENERATOR: SGEN51200 A.
13. INCLUDES: BYPASS STACK AND DIVERTER DAMPER.
14. DELIVERY: IMMEDIATELY. BUYER IS RESPONSIBLE FOR LOADING, FREIGHT AND LOGISTICS FROM ACTUAL LOCATION TO FINAL DESTINATION.
15. DETAILED DESCRIPTION: GAS TURBINE (GT)
16. IT WORKS ON 50 Hz BUT COULD BE CONVERTED, WITH ADDITIONAL EQUIPMENT FOR 60 Hz (EXTRA COSTS).
QUANTITY: 1
Learn More
YY-2991 SIEMENS SGT-A05 GAS TURBINE MOBILE GENERATORS, 12 UNITS
MULTIPLE UNITS AVAILABLE
LOW HOUR AERO-DERIVATIVE GAS TURBINE PACKAGES
TOTAL QUANTITY: 12
Learn More
YY-2894 NEW SIEMENS SGT 400, YEAR 2018
SIEMENS SGT 400 (12.9 MW) GAS TURBINE
· 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE
· GAS FUEL SYSTEM
· DLE COMBUSTION SYSTEM
· HOT-END DRIVE
· 2-SHAFT ENGINE
· LEFT-HAND EXHAUST
· MAIN LUBRICATION PUMP
· EQUIVALENT OPERATING HOURS : 0H
· TOTAL STARTS : 0
· NEW, NEVER INSTALLED OR COMMISSIONED
QUANTITY: 1
Learn More
YY-2985 COMPLETE AND UNUSED SGT-400 50Hz GAS TURBINE DRIVEN GENERATOR PACKAGES
THE SIEMENS SGT-400 FAST POWER GAS TURBINE GENERATOR SET IS A SYSTEM DESIGNED FOR RAPID DEPLOYMENT.
QUANTITY: 5 Learn More