YY-2894 NEW SIEMENS SGT 400, YEAR 2018
SIEMENS SGT 400 (12.9 MW) GAS TURBINE
· 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE
· GAS FUEL SYSTEM
· DLE COMBUSTION SYSTEM
· HOT-END DRIVE
· 2-SHAFT ENGINE
· LEFT-HAND EXHAUST
· MAIN LUBRICATION PUMP
· EQUIVALENT OPERATING HOURS : 0H
· TOTAL STARTS : 0
· NEW, NEVER INSTALLED OR COMMISSIONED
QUANTITY: 1
Learn More
TT-4735 SOLAR TURBINE TAURUS 60 – NEW, 5.67MW, YEAR 2019
BRAND: SOLAR
MODEL TAURUS 60
TYPE GAS TURBINES
CONDITION NEW
YEAR 2019
PACKAGE: BY SOLAR
HOURS OF OPERATION: 0
FUEL CAPABILITY: NATURAL GAS/LIQUID
COMBUSTION STANDARD: STANDARD
BRAND KATO
MODEL TAURUS 60
FREQUENCY 50Hz
Learn More
TT-1767 TAURUS T60 TURBINES, 50-60Hz, YEAR 2012
TAURUS T60 TURBINES
TYPE: STANDARD
BRAND: SOLAR
CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS
SUBCATEGORY: TURBINE
TYPE: NEW SURPLUS
CONDITION: EXCELLENT
50Hz NATURAL GAS (CAN CONVERT TO DUAL DIESEL/NG WITH ADDITIONAL CHARGES)
YEAR: 2012
Learn More
TT-6239 SIEMENS SGT 600 TURBINE, DLE, YEAR 2011, 25 MW, 10.5 KV, 50 Hz
MAINTENANCE RECORD:
A-THE MAINTENANCE MAINLY INVOLVES PASSING HOT AIR FROM THE DRYER TO THE COMBUSTION CHAMBER. WE HAVE PREVIOUSLY TRIED TURNING THE DRYER. DESICCANT IS PLACED INSIDE THE STEAM DRUM OF THE WASTE HEAT BOILER.
B-THE LAST RUN WAS IN DECEMBER 2017, AND IT WAS STARTED EVERY THREE MONTHS FOR ABOUT A YEAR. FINALLY, WE COMMUNICATED WITH SIEMENS TO ADOPT A LONG-TERM MAINTENANCE METHOD, SO WE DID NOT ATTEMPT TO IGNITE AGAIN.
IMMEDIATE DELIVERY
Learn More
TT-5544 SOLAR MARS100 TURBINE FOR COMPRESSING, 10 HOURS, YEAR 2021, VERSION: 16000SA CS/MD
SOLAR MARS100 TURBINE FOR COMPRESSING
YEAR: 2021
HOURS: 10
TYPE: MECHANICAL DRIVE PACKAGE.
NOT INSTALL THEM AT PRESENT
STILL HAVE BEEN PARKED IN BOXES
QUANTITY: 2
Learn More