Search results for: 'and+ma''
- Related search terms
- and+ma''
-
K-3429 FOSTER AND WHEELER STEAM BOILERS A 100 T/ H AND 46.4 BAR YEAR 2005K-3429 FOSTER AND WHEELER STEAM BOILERS A 100 T/ H AND 46.4 BAR YEAR 2005
MAKE: FOSTER AND WHEELER
YEAR 2005
2 X 100 TONS/H, 39 BAR WORKING PRESSURE AT 385C. DESIGNED PRESSURE IS 46.5 BAR
EMPTY WEIGHT 97 TONS
FURNACE VOLUME 104M3
HEATING FURNACE AREA 1125M2
ALL ACCESORIES INCLUDED
87% EFFICIENCY, FUEL OIL AND NATURAL GAS FIREDQUANTITY: 2
Learn More -
TT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 HzTT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 Hz 1. POWER GENERATION 498 MW TOTAL 2. GAS FIRED 3. FREQUENCY (60 Hz) 4. MODEL: SIEMENS SGT5/6-2000E (VERSION 94.2) 5. OUTPUT: 166 MW PER UNIT (BASE LOAD) 6. CONFIGURATION: SIMPLE CYCLE; CONVERTIBLE TO COMBINED CYCLE OR CHP 7. FUEL: NATURAL GAS (OTHER FUELS POSSIBLE WITH MODIFICATION) 8. CONDITION: BRAND NEW, NEVER USED, ZERO HOURS 9. SERVICEABILITY: FULL SIEMENS OEM SUPPORT, GLOBAL SPARES AVAILABILITY, ROBUST INSTALLED BASE (SEPARATELY QUOTED SERVICE) QUANTITY: 3 Learn More -
K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
MAKE: SIEMENS
2 UNITS V 64.3 SIEMENS GAS TURBINES AND STEAM TURBINE
2 BOILERS AND AUXILIARIES
NATURAL GAS AND LFO
50 HZQUANTITY: 1
Learn More -
K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
MANUFACTURER: ESCHER WYSS
TYPE: 135-200
POWER ELECTRICAL: 3.0 MW
PRESSURE/TEMP.: 60 BAR/400°C
BACK PRESSURE: 11 BAR
YEAR OF MANUFACTURER: 1964
CONDITION: GOOD
VOLTAGE: 11 KV/50 HZ
SCOPE OF SUPPLY:
TURBINE AND GENERATOR,PIPING AND ELECTR. BOXESQUANTITY: 1
Learn More -
SEMICONDUCTOR AND SOLAR PANEL PRODUCTION EQUIPMENTREFERENCE NUMBER: T-6947 SEMICONDUCTOR AND SOLAR PANEL PRODUCTION EQUIPMENT IN ADDITION THERE ARE SOME MORE SEMICONDUCTOR AND SOLAR PANEL PRODUCTION EQUIPMENT AVAILABLE, SUCH AS: SINGULUS SINGULAR ICP-PECVD COATING SYSTEM FOR CRYSTALLINE SOLAR CELLS LEYBOLD H3200 INLINE SPUTTER FOR THIN FILM (CIS/CIGS) SOLAR MODULES LEYBOLD H1700 INLINE SPUTTER FOR THIN FILM (CIS/CIGS) SOLAR MODULES AMAT ATON 1600 SPUTTER DR. SCHENK SOLARINSPECT QUALITY MEASUREMENT SYSTEM INNOLAS IMPALA MULTIBEAM LASER STRUCTURIZER ENVIRON FALK 15 M3/H ULTRAPURE WATER PLANT MEIER VACUUMLAMINATOR ICOLAM 42/24 SYNRAD CO2 LASER MARKING SYSTEM MUEGGE MAGNETRON HEAD 3KW MH 3000 4 JET EDGE DECOATING SYSTEMS Learn More -
K-8185 GE JENBACHER TYPE JMS 620 GS YEAR 2000K-8185 GE JENBACHER TYPE JMS 620 GS YEAR 2000
MANUFACTURER: GE JENBACHER
TYPE: JMS 620 GS E OS
WITH STAMFORD LVSI 814 HS
400V
50HZ
COS 0.8
YEAR: 2000
NATURAL GAS: 3.041KW EL
HOURS SINCE NEW: 41,000 INCLUDE THE LAST OVERHAUL AT 32,000 HOURS NEW LINERS AND PISTONS AND NEW DIANE CONTROL SYSTEM
INCLUDING:
ENGINE
GENERATOR
ELECTRONIC BOXES
DOCUMENTATION
CABEL
PLC
PIPINGQUANTITY: 1 UNIT
Learn More -
K-2919 MAN-BHKW COMPLETE MODULES 500KW YEAR 2009K-2919 MAN-BHKW COMPLETE MODULES 500KW YEAR 2009
ELECTRICAL POWER 500 KW
THERM. POWER 400 KW
FUEL: BIO OIL AND DIESEL
YEAR2009
ONLY BETWEEN 6000 AND 9000 HOURS
INCLUDING ELECTRICAL BOXES
HEAT EXCHANGER
CATALYSATORS
11 KV / 50 HZQUANTITY: 8
Learn More -
K-2541 SIEMENS WESTINGHOUSE AND MITSUBISHI COMBINED CYCLE PLANT 73MW YEAR 1999K-2541 SIEMENS WESTINGHOUSE AND MITSUBISHI COMBINED CYCLE PLANT 73MW YEAR 1999
MAKE: SIEMENS WESTINGHOUSE AND MITSUBISHI
NATURAL GAS
73 MW
YEAR 1999
50 HZQUANTITY: 1
Learn More -
ALSTOM GAS POWER PLANT, 252 MWREFERENCE NUMBER: T-6937 ALSTOM GAS POWER PLANT, 252 MW ALSTOM GAS POWER PLANT 252 MW WITH SIEMENS TECHNOLOGY STILL INSTALLED, USED ONLY TEST AND MAINTENANCE OPERATION 500 HOURS QUANTITY: 1 Learn More -
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More