Search results for: '1/2/'
-
L-5951 WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995REFERENCE NUMBER: L-5951
WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995
GAS TURBINES
MAKE: WESTINGHOUSE
YEAR: 1995 (STOPPED IN JUNE 2013)
100 MW EACH X 6 = 600 MW TOTAL
QUANTITY: 5
Learn More -
R-9392 ROLLS-ROYCE/ABB DIESEL GENERATORS – NEW, 27.7 MW, FUEL MDO (MARINE DIESEL OIL), YEAR 2015 – 60HzREFERENCE NUMBER: R-9392
ROLLS-ROYCE/ABB DIESEL GENERATORS – NEW, 27.7 MW, FUEL MDO (MARINE DIESEL OIL), YEAR 2015 – 60Hz
(5587 KW X 2 + 4190 KW X 4 = 27.934 KW ROLLS-ROYCE)
Learn More -
C-4000 VOLVO PENTA 505KW GENERATOR SET, WIDTH 66, YEAR 2010 - NEWC-4000 VOLVO PENTA 505KW GENERATOR SET, WIDTH 66, YEAR 2010 - NEW
VOLVO PENTA 505KW GENERATOR SET
ENGINE:
BRAND: VOLVO PENTA
MODEL: TWD1643GE
YEAR: 2010GENERATOR:
BRAND: MECC ALTE
KW: 505
KVA: 631.25
RATING: PRIME
VOLTS: 230/400
AMPS: 911PACKAGE:
0 HOURS SINCE NEW
GENERATOR SET TYPE: PRIME POWER
BRAND: OTHER
MODEL: PRAMAC GSW705V
DIMENSIONS:
LENGTH: 186
WIDTH: 66
HEIGHT: 96
WEIGHT: 12000 POUNDSQUANTITY: 1
Learn More -
TT-7549 JENBACHER J620 POWER GENERATOR - NEW, 3300 KW, YEAR 2023, 60 HzTT-7549 JENBACHER J620 POWER GENERATOR - NEW, 3300 KW, YEAR 2023, 60 Hz 1. JENBACHER J620 POWER GENERATOR 2. CONDITION: NEW 3. YEAR: 2023 4. HOURS: 0 QUANTITY: 1 Learn More -
M-5321 JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998REFERENCE NUMBER: M-5321 (22011DGFAB1RXL) L JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998 COMPLETE JENBACHER NATURAL GAS POWERPLANT OF 21.6 MW YEAR OF MANUFACTURE END OF 1998 COMMISSIONING: 5 UNITS IN 2000, 1 UNIT IN 2009, 1 UNIT IN 2010, AND 1 UNIT IN 2011 8 UNITS JENBACHER JMS 620 G OF 2.7 MWE-TOTAL EFFECTIVE ELECTRIC OUTPUT 21.7 MW RUNNING HOURS: 5 UNITS BETWEEN 38,000 AND 40,000 HOURS, 2 UNITS 6,200 HOURS AND 1 UNIT 7,200 HOURS JENBACHER MAINTENANCE FULL MAINTENANCE HISTORY QUANTITY AVAILABLE: 1 Learn More -
TT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 HzTT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 Hz 1. POWER GENERATION 498 MW TOTAL 2. GAS FIRED 3. FREQUENCY (60 Hz) 4. MODEL: SIEMENS SGT5/6-2000E (VERSION 94.2) 5. OUTPUT: 166 MW PER UNIT (BASE LOAD) 6. CONFIGURATION: SIMPLE CYCLE; CONVERTIBLE TO COMBINED CYCLE OR CHP 7. FUEL: NATURAL GAS (OTHER FUELS POSSIBLE WITH MODIFICATION) 8. CONDITION: BRAND NEW, NEVER USED, ZERO HOURS 9. SERVICEABILITY: FULL SIEMENS OEM SUPPORT, GLOBAL SPARES AVAILABILITY, ROBUST INSTALLED BASE (SEPARATELY QUOTED SERVICE) QUANTITY: 3 Learn More -
TT-7913 SIEMENS SST-300 COMPLETE STEAM POWER GENERATOR, 20.29 MW, YEAR 2021, 50HzTT-7913 SIEMENS SST-300 COMPLETE STEAM POWER GENERATOR, 20.29 MW, YEAR 2021, 50Hz 1. UNPACKED - STILL BOXED AND CRATED - COMPLETE PLANT 2. NEW UNUSED 3. MODEL: SIEMENS SST-300 4. YEAR OF MANUFACTURE: 2021 Learn More -
MTU CONTAINERIZED DIESEL GENERATOR PLANT, 30.5 MW, YEAR 2017 AND 2018REFERENCE NUMBER: T-6933 MTU CONTAINERIZED DIESEL GENERATOR PLANT, 30.5 MW, YEAR 2017 AND 2018 MTU CONTAINERIZED DIESEL GENERATOR PLANT 30.5 MW FIFTEEN (15) MTU16V4000G63 EXHAUST EMISSION OPTIMIZED DIESEL ENGINES COUPLED TO HIGH PERFORMANCE MECC ALTE ECO46 2L/4A ALTERNATORS, RATED AT 2546 KVA/2033 KW STANDBY POWER AND 2303 KVA / 1842 KW PRIME POWER, 1500 RPM, 400 VOLT, 50 Hz, YEAR OF MANUFACTURE: 2017 AND 2018, ONLY 150 TO 200 HOURS SINCE NEW. EACH GENERATOR IS HOUSED IN A 40 FT SOUND ATTENUATED CONTAINER. SKID MOUNTED RADIATOR DESIGNED FOR HIGH END TEMPERATURES, 40 FT HI CUBE CONTAINER WITH SWITCH GEAR ROOM AND CONTROL ROOM, EQUIPMENT INCLUDES: CONTROL PANELS, CONTROL SYSTEM, BREAKER PANELS, HEATERS, BATTERY CHARGER, SWITCH GEAR, TRANSFORMERS, FUEL TANK SYSTEM AND ETC. COMPLETE POWER PLANT IN MODULE DESIGN THAT CAN BE EASILY TRANSPORTED AND SET UP WITHIN DAYS TO GENERATOR STEADY STREAM OF ELECTRICAL POWER. (15) ALL PURPOSE 40 FT SOUND ATTENUATED CONTAINERS WITH MTU16V4000G63 GENERATORS SETS. RATING: 2546 KVA/2033 KW STANDBY POWER AND 2303 KVA / 1842 KW PRIME POWER RADIATOR: SKID MOUNTED RADIATOR DESIGNED FOR HIGH END TEMPERATURES RADIATOR DESIGN: TECNO GROUP TG00094AA 30M/S REDUCED AIRFLOW RADIATOR WITH ELECTRIC POWERED COOLING FAN POWER BOX: CP6 MODEL: HMW‐2200‐T5 STD 2200KVA V400 / 50 Hz AS20 YEAR: 2017 AND 2018 HOURS: 150 TO 200 HOURS ONLY VOLTAGE: 400V, 3PH, 50 Hz ENGINE: MTU 16V4000G63 EXHAUST EMISSION OPTIMIZED ENGINE ENGINE SPEED: 1500 RPM STARTING SYSTEM: 24V ELECTRIC WITH OPTIMA YELLOW TOP BATTERIES AND BATTERY ISOLATOR ENGINE GOVERNOR: ADEC ALTERNATOR: MECC ALTE ECO46 2L/4A WITH MAUX EXCITATION, OIL PRIMER AND CENTRIFUGE FITTED AS CONFIRMED BY MTU, SET MOUNTED 4000A 4P MOTORIZED BREAKERS. CONTROL PANEL: AS5 WITH FREE ISSUE COMAP IG‐NTC‐BB + INTELIVISION 5 COMPONENTS AIR CIRCUIT BREAKER PANEL: 4 POLE: 4000A SCHNEIDER NW04 MOTORIZED H2 100KA BREAKING CAPACITY WITH MICROLOGIC 6.0A TRIP UNIT HEATER: THERMOSTATICALLY CONTROLLED 9KW 400V 3 PHASE WATER JACKET HEATER WITH CIRCULATION PUMP BATTERY CHARGER: DEEPSEA DSE9470 10A INTELLIGENT MAINS BATTERY CHARGER INCLUDING: AUTOMATIC ELECTRIC PRE‐LUBE PUMP; SET MOUNTED 2000A NEUTRAL EARTHLING CONTACTOR WITH CT; FUEL RETURN COOLER; CENTRIFUGAL OIL FILTER (MTU) & PRIMARY WATER SEPARATOR FILTER. INCLUDING: AUTOMATIC ELECTRIC PRE‐LUBE PUMP; SET MOUNTED 2000A NEUTRAL EARTHING CONTACTOR WITH CT; FUEL RETURN COOLER; CENTRIFUGAL OIL FILTER (MTU) & PRIMARY WATER SEPARATOR FILTER. TRANSFORMERS QUANTITY 4: 4MVA GBE OIL IMMERSED, FREE BREATHING STEP UP POWER TRANSFORMERS WITH OIL CONSERVATOR AND COPPER WINDINGS; 3 PHASE, 400‐33 KV; 50 Hz QUANTITY 1: 2MVA GBE OIL IMMERSED, FREE BREATHING STEP UP POWER TRANSFORMERS WITH OIL CONSERVATOR AND COPPER WINDINGS; 3 PHASE, 400‐33 KV; 50 Hz HV SWITCHGEAR CONTAINER PURPOSE BUILT 40 FT HI CUBE CONTAINER WITH HEATING LIGHTING AND POWER INSTALLED. LINED WITH ROCK WOOL INSULATED PANELS INCLUDES HIGH LEVEL LOUVER WITH FAN AND LOW‐LEVEL LOUVER FOR NATURAL AIR FLOW. SPLIT INTO TWO SECTIONS/ROOMS WITH A CONTROL ROOM ON ONE SIDE AND SWITCH GEAR IN THE OTHER ROOM WITH 33 KV ABB RING SAFE SWITCHGEAR CONTROL SYSTEM REMOTE COMMUNICATION AND LOAD SUMMATION CONTROL PANEL (RCLSP) 1 X COMAP IM‐NTC BB BASE BOX CONTROLLER (SITE LOAD VALUE MONITORING & INTEGRATION) 1 X COMAP IBNT INTERNET BRIDGE (BROADBAND INTERFACE) 1 X COMAP ILB+ LOCAL BRIDGE (LOCAL & PC REMOTE INTERFACE) 1 X 230/240V DC PSU 1 SET OF CONTROL MINIATURE CIRCUIT BREAKERS 1 SET OF CAN BUS INTERFACE TERMINALS BELDON 3106A CANBUS COMMUNICATION CABLING & CAT 5E ETHERNET COMMUNICATION CABLES COMAP MAINSPRO G59‐3 PROTECTION RELAY (OVER/UNDER VOLTS, Hz & VECTOR SHIFT) FUEL TANK SYSTEM QUANTITY 4 X 40,000L FUEL TANKS; DOUBLE SKINNED; DD50 FUEL POLISHING SYSTEM; BUND ALARM; OVERFILL ALARM AND CONTENTS GAUGE WITH ADJUSTABLE VOLT FREE LEVEL ALARM. QUANTITY 1 X 20,000L FUEL TANKS; DOUBLE SKINNED; DD50 FUEL POLISHING SYSTEM; BUND ALARM; OVERFILL ALARM AND CONTENTS GAUGE WITH ADJUSTABLE VOLT FREE LEVEL ALARM. Learn More -
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More -
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More