Search results for: 'mill'
- Related search terms
- milling
- Miller
- Miller.
- Milling machine
- millimeters to inches
-
TT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 HzTT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 Hz 1. POWER GENERATION 498 MW TOTAL 2. GAS FIRED 3. FREQUENCY (60 Hz) 4. MODEL: SIEMENS SGT5/6-2000E (VERSION 94.2) 5. OUTPUT: 166 MW PER UNIT (BASE LOAD) 6. CONFIGURATION: SIMPLE CYCLE; CONVERTIBLE TO COMBINED CYCLE OR CHP 7. FUEL: NATURAL GAS (OTHER FUELS POSSIBLE WITH MODIFICATION) 8. CONDITION: BRAND NEW, NEVER USED, ZERO HOURS 9. SERVICEABILITY: FULL SIEMENS OEM SUPPORT, GLOBAL SPARES AVAILABILITY, ROBUST INSTALLED BASE (SEPARATELY QUOTED SERVICE) QUANTITY: 3 Learn More -
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More -
K-8157 COAL FIRED POWER PLANT (2 X 50MW)K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More -
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More -
K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
WAS BUILT TO SUPPLY THE PAPER MILL WITH STEAM AND ELECTRICITY
MAKE: SIEMENS
MODEL: CFR5 G6a
2.5MW
65 BAR
480 ˚ C
REVOLUTION NUMBER: 23000 U PER MINUTE
EVAPORATION PRESSURE: 1-10 BAR
YEAR 2002
THE STEAM TUBINE AND THE GENERATOR WERE CHANGES AND ARE NEW
HOURS: LESS THAN 30,000
BOILER SYSTEM WAS COMPLETELY RECONDITIONED
THE WATER TREATMENT PLANT WAS RECONDITIONED
EXHAUST CLEANING SYSTEM WAS RECONDITIONED
ASH AND COAL TRANSPORTATION SYSTEMS WERE RECONDITIONEDQUANTITY: 1
Learn More -
M-5321 JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998REFERENCE NUMBER: M-5321 (22011DGFAB1RXL) L JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998 COMPLETE JENBACHER NATURAL GAS POWERPLANT OF 21.6 MW YEAR OF MANUFACTURE END OF 1998 COMMISSIONING: 5 UNITS IN 2000, 1 UNIT IN 2009, 1 UNIT IN 2010, AND 1 UNIT IN 2011 8 UNITS JENBACHER JMS 620 G OF 2.7 MWE-TOTAL EFFECTIVE ELECTRIC OUTPUT 21.7 MW RUNNING HOURS: 5 UNITS BETWEEN 38,000 AND 40,000 HOURS, 2 UNITS 6,200 HOURS AND 1 UNIT 7,200 HOURS JENBACHER MAINTENANCE FULL MAINTENANCE HISTORY QUANTITY AVAILABLE: 1 Learn More