Search results for: 'Complete par'
- Related search terms
- Complete
- Complete+ca
- par'A=0
- par'A=0''
- complete a
-
M-4747 INDUSTRIAL BREWERY WITH BREWHOUSE 20 HLREFERENCE NUMBER: M-4747 (1111NBRTHH10) L INDUSTRIAL BREWERY WITH BREWHOUSE 20 HL INDUSTRIAL BREWERY WITH CAPACITY OF 20 HL PER BREW YEAR PRODUCTIVITY OF 6,000 TO 7,000 HL, 3 SORTS OF BEER BREWERY IS NOT LOCATED AT A SEISMIC AREA EQUIPMENT DESIGNED ACCORDING TO EUROPEAN STANDARD STEAM HEATED 2-VESSEL BREW HOUSE OF 20 HECTOLITRES IN STAINLESS STEEL SCOPE OF SUPPLY: MALT MILL 1 X 2-ROLL MILL WITH CAPACITY OF 400 TO 800 KG/H WITH INLET FROM THE TOP FOR MALT SACKS BREW HOUSE 20HL STEAM HEATED STAINLESS STEEL 1.1 MASH/WORTH – KETTLE DOUBLE WALLED INNER SHELL OF STAINLESS STEEL, MATERIAL 1.4301 LLC, WELDS GROUND WITH GRAIN SIZE 220 OUTER SHEATH MADE OF STAINLESS STEEL 2 STEAM HEATING ZONES (BOTTOM AND CYLINDRICAL PART) AGITATOR AND SHAFT IN STAINLESS STEEL, MATERIAL 1.4301. INSTALLATION OF BOTTOM CENTER. DRIVE VIA GEAR MOTOR, SPEED CONTROLLABLE BY FREQUENCY CONVERTER 1 SPRAY BALL 1 MAN HOLE WITH GLASS 1 PRESSURE RELIEF VALVE – SAFETY VALVE 1 LEVELMEASUREMENT DESIGNED FOR NON PRESSURE OPERATION 1.2 LAUTER TUN DOUBLE WALLED INNER SHELL OF STAINLESS STEEL, MATERIAL 1.4301 IIIC, WELDS GROUND WITH GRAIN SIZE 220 OUTER SHEATH MADE OF STAINLESS STEEL ISOLATION OF THE CYLINDRICAL PART AND THE BOTTOM - 100 MM HALOGEN-FREE MINERAL WOOL. BOTTOM OF THE LAUTER TUN WITH OUTLET VALVES, BACK WASH VALVES AND A DRAIN VALVE MULTIPART SIEVE PLATE 1.4301 REMOVABLE THROUGH MANHOLE. HOEING 1.4301 TWO-ARMED WITH KNIVES AND TREBERN SWORD. INSTALLATION OF BOTTOM CENTER. 1 LAUTER STATION WITH CIP SPRAY BALL 1 MANHOLE WITH GLASS 1 SPRAY BALL 1 TREBERN FLAP AT THE CYLINDRICAL PART DESIGNED FOR NON PRESSURE OPERATION THE PACKAGE INCLUDES ALL VALVES, CHECK VALVES, BUTTERFLY VALVES, 2 PUMPS AND TEMPERATURE PROBES LANDING AND STAIRS MADE OF STAINLESS STEEL SQUARE ROOF BARS, COVERED WITH CORRUGATED SHEET METAL, HEIGHT ADJUSTABLE FEET WITH DOMES. THE PAN DUST WILL BE COLD DOWN WITH COLD WATER AND THE CONDENSATE WILL BE TRANSFERRED TO THE DRAIN WHIRLPOOL 20HL VESSEL MADE OF STAINLESS STEEL, MATERIAL 1.4301 IIIC, WELDS GROUND WITH GRAIN SIZE 220. NON INSULATED. 1 WHIRLPOOL PUMP 2 LATERAL OUTLETS WITH HAND VALVES 1 FLOOR DRAIN WITH HAND VALVE 1 TANGENTIAL INLET PORT WITH THREADED CONNECTOR 1 SAFETY VALVE 1 MANHOLE 1 SPRAY BALL DESIGNED FOR NON PRESSURE OPERATION WORTHCOOLING + WORTH AERATION VESSEL MADE OF STAINLESS STEEL, MATERIAL 1.4301 IIIC, WELDS GROUND WITH GRAIN SIZE 220. NON INSULATED. 1 WHIRLPOOL PUMP 2 LATERAL OUTLETS WITH HAND VALVES 1 FLOOR DRAIN WITH HAND VALVE 1 TANGENTIAL INLET PORT WITH THREADED CONNECTOR 1 SAFETY VALVE 1 MANHOLE 1 SPRAY BALL DESIGNED FOR NON PRESSURE OPERATION 1. SECTION: 20 HL WORTH IS COOLED WITH COLD WATER FROM 98°C TO 17°C IN 60 MINUTES (COLD WATER FROM CLIENT SIDE MUST BE MAX. 15°C OR LOWER) 2. SECTION: WITH ICE WATER OR GLYCOL THE WORTH IS COOLED TO 5°C CONTROL SYSTEM EACH PNEUMATIC CONTROLLED VALVE WILL HAVE A SWITCH BUTTON ON A CONTROL PANEL IN THE MIDDLE OF THE BREW HOUSE. ALSO THE TEMPERATURE CONTROL OF THE MASH KEETEL AND WORTH KETTLE WILL BE IMPLEMENTED AT THE CONTROL PANEL WITH A HARD WARE CONTROLLER. HOT WATER TANK 30 HL VERTICAL DESIGN, MATERIAL 1.4301 DOUBLE WALLED INNER SHELL OF STAINLESS STEEL, MATERIAL 1.4301 IIIC, WELDS GROUND WITH GRAIN SIZE 220 OUTER SHEATH MADE OF MATERIAL 1.4301 WITH GRAIN 220 1 HOT WATER PUMP 1 CIRCULATION PUMP 1 PT 100 AN CONTROLLER 1 STEAM VALVE AND CONDENSATE VALVE 1 LEVEL INDICATION 10 X CYLINDER CONICAL TANKS 40/48 HL VERTICAL DESIGN WITH DISHED BOTTOM AND 60° CONE. CONE AND CYLINDRICAL PART IS INSULTED AND THE FULL TANK IS EQUIPPED WITH WELDED STAINLESS STEEL EXTERIOR FINISH. TANK HEIGHT APPROX.: 4.050MM TANK EQUIPPED WITH COOLING JACKET (1 ZONE) AND CONE COOLING (2 ZONE), BY TEMP- PLATE, SUITABLE FOR ICE WATER / GLYCOL. SEPARATE CONNECTIONS FOR COOLING FOR CASING AND CONE : NIPPLE ¾ " EXTERNAL THREAD TANK WITH MANHOLE 500 X 400 MM, WITH MANHOLE COVER AND DUAL HINGE. 2 OUTLET DN 32 INSTALLED IN A DN 125 - THREAD , PULLED FORWARD AND ENDED BUTTERFLY VALVE DN 32 G / S , WITH BLANKING CAP. UPPER FLOOR PROVIDED WITH 2 THREADED CONNECTION DN 32 FOR CONNECTION OF AN RLV - FITTING. ONE OF THE TERMINALS INSTALLED IN A FITTING DN 100 AND DN 25 PROVIDED WITH REMOVABLE SPRAY BALL CLEANING PIPE DN25, TOP PROVIDED WITH CONNECTION CONE / NUT DN 32FOR CONNECTION TO THE RLV COMBINATION, PULLED DOWN AND ENDING ON OPERATING HEIGHT IN THREADED CONNECTION DN 50, INCLUDING BLANKING CAP. IN THE CLEANING DUCT 2 CONNECTOR WITH THREADED CONNECTION DN 20 FOR SPUND APPARATUS AND WITH BALL VALVE FOR THE GAS SUPPORT 1 CONNECTOR FOR SAMPLE VALVE: THREADED CONNECTION DN 20 2 CONNECTION FOR PT -100: IMMERSION SLEEVE 260 MM LONG, WITH SLEEVE ½ " . 2 SOLENOID VALVE FOR THE COOLING DUCT 4 MANUAL VALVES IN THE COOLANT INLET AND COOLANT OUTLET LINE 4 THE HEIGHT ADJUSTABLE TUBE FEET , INCLUDING FOOTPLATE. MATERIAL: 1.4301. FINISH: - INSIDE: - 2B (IIIC-SHEET), DISHED BOTTOM GROUND. - WELDS - ROUND & LONG SEAMS SANDED. - REST STAINED / BRUSHED. - OUTSIDE: - 2B (IIIC-SHEET). - WELDS - ROUND & LONGITUDINAL SEAMS SANDED. - REST STAINED / BRUSHED TANK SUITABLE FOR 3 BAR G. (20 ° C), DECREASE ACCORDING TO PED 97/23/EC. FILTRATION 20 HL/H KISELGUR- FILTER WITH HORIZONTAL SLICES AND CAPACITY OF 20HL / HOUR 3 X PRESSURE DISPENDING TANKS 40/46 HL VERTICAL DESIGN WITH DISHED BOTTOM LOWER + UPPER BOTTOM AND CYLINDRICAL PART IS INSULTED AND THE FULL TANK IS EQUIPPED WITH WELDED STAINLESS STEEL EXTERIOR FINISH. TANK HEIGHT APPROX.: 3.350MM TANK EQUIPPED WITH COOLING JACKET (1 ZONE) BY TEMP- PLATE, SUITABLE FOR ICE WATER / GLYCOL. CONNECTION FOR COOLING: NIPPLE ¾ " EXTERNAL THREAD TANK WITH MANHOLE 500 X 400 MM, WITH MANHOLE COVER AND DUAL HINGE. 1OUTLET DN 32 PULLED FORWARD AND ENDED BUTTERFLY VALVE DN 32 G / S , WITH BLANKING CAP. UPPER FLOOR PROVIDED WITH 2 THREADED CONNECTION DN 32 FOR CONNECTION OF AN RLV - FITTING. ONE OF THE TERMINALS INSTALLED IN A FITTING DN 100 AND DN 25 PROVIDED WITH REMOVABLE SPRAY BALL CLEANING PIPE DN 25, TOP PROVIDED WITH CONNECTION CONE / NUT DN 32 FOR CONNECTION TO THE RLV COMBINATION, PULLED DOWN AND ENDING ON OPERATING HEIGHT IN THREADED CONNECTION DN 32, INCLUDING BLANKING CAP. IN THE CLEANING DUCT 2 CONNECTOR WITH THREADED CONNECTION DN 20 FOR SPUND APPARATUS AND WITH BALL VALVE FOR THE GAS SUPPORT 1 CONNECTOR FOR SAMPLE VALVE: THREADED CONNECTION DN 20 1 CONNECTION FOR PT -100: IMMERSION SLEEVE 260 MM LONG, WITH SLEEVE ½ " . 1 SOLENOID VALVE FOR THE COOLING DUCT 2 MANUAL VALVES IN THE COOLANT INLET AND COOLANT OUTLET LINE 4 THE HEIGHT ADJUSTABLE TUBE FEET , INCLUDING FOOTPLATE. MATERIAL: 1.4301. FINISH: - INSIDE: - 2B (IIIC-SHEET), DISHED BOTTOM GROUND. - WELDS - ROUND & LONG SEAMS SANDED. - REST STAINED / BRUSHED. - OUTSIDE: - 2B (IIIC-SHEET). - WELDS - ROUND & LONGITUDINAL SEAMS SANDED. - REST STAINED / BRUSHED TANK SUITABLE FOR 3 BAR G. (20 ° C), DECREASE ACCORDING TO PED 97/23/EC. COOLING UNIT COOLING UNIT FOR THE OFFERT TANKS AND FOR THE WORTH COOLING. DESIGNED FOR OPERATION WITH GLYCOL COMPRESSOR OIL FREE FULLY AUTOMATIC, OIL-FREE AIR COMPRESSOR STATION WITH STAGE, MOUNTED ON A PRESSURE VESSEL, EQUIPPED WITH PRESSURE SWITCH, OUTLET VALVE, SAFETY VALVE, PRESSURE GAUGE AND MICRO FILTER. STEAM GENERATOR OIL OPERATED OIL OPERATED STEAM GENERATOR WITH A CAPACITY OF 200 KG/H INCLUDING FEED WATER TREATMENT AND FEED WATER CONTROL MOBILE BEER PUMP BEER PUMP WITH FREQUENCY CONVERTER, SINGLE MECHANICAL SEAL, ON STAINLESS STEEL FRAME (WITH CEE PLUG, MOTOR PROTECTION AND 10 M CABLE) FOR PUMPING FROM THE FERMENTATION TANKS TO THE PRESSURIZED TANK 4 PCS. BEER HOSES SET KEG-CLEANER WITH KEG-HANDFILLER CLEANER: CAPACITY: 10 – 15 KEGS / HOUR SEMI AUTOMATICALLY CLEANING PROCESS FOR ALL STANDARD KEGS KEG-HAND FILLER: COMPLETE MADE OF STAINLESS STEEL TUBES 2M LONG FOR ALL STANDARD KEGS PACKAGING WOODEN BOX AND FOILING FOR TRANSPORT IN A CONTAINER (SEA WAY), THE WOODEN BOX ALONE IS NOT ENOUGH FOR THE SEA WAY DOCUMENTATION IN ENGLISH (DEVICE DOCUMENTATION) IN ELECTRONIC FORM MOUNTING MATERIAL FOR MECHANICAL AND ELECTRICAL WORK UPON RECEIPT OF THE LAYOUT DRAWING, SPECIFICATIONS OR INTERFACES AND CLARIFYING THE SCOPE OF DELIVERY WE CAN MAKE A DETAILED QUOTE FOR DELIVERY, INSTALLATION, AND COMMISSIONING MOUNTING AND COMMISSIONING FOR MECHANIC WORK AND ELECTRIC WORK (LIFTING DEVICES- CRANE, ENERGY, RAW MATERIAL, CLEANING SOLUTION, HOTEL, FLIGHT TICKET, LABOURER FOR MOUNTING SUPPORT) UPON RECEIPT OF THE LAYOUT DRAWING, SPECIFICATIONS OR INTERFACES AND CLARIFYING THE SCOPE OF DELIVERY WE CAN MAKE A DETAILED QUOTE FOR DELIVERY, INSTALLATION, AND COMMISSIONING 4 TEST BREWS (ENERGY, RAW MATERIAL, CLEANING SOLUTION, HOTEL, FLIGHT TICKET) AND TRAINING OF THE OPERATOR STAFF UPON RECEIPT OF THE LAYOUT DRAWING, SPECIFICATIONS OR INTERFACES AND CLARIFYING THE SCOPE OF DELIVERY WE CAN MAKE A DETAILED QUOTE FOR DELIVERY, INSTALLATION, AND COMMISSIONING LABORATORY CIVIL WORK CO2 – SUPPLY PERMITS AND LICENSES FROM LOCAL AUTHORITIES TRANSPORT WATER TREATMENT AND COLD WATER TANK (IF REQUIRED) YEAST MANIPULATION (IF REQUIRED) Attached 3 photos from similar equipment. F1: brewhouse F2: CCT (cylindroconicalk tanks) and BBT (bright beer tanks = dispensing tanks) F3: PHE(plate heat exchanger = wort cooling, whirlpool, hot water tank) QUANTITY AVAILABLE: 1 Learn More -
V-0025 COTTON PAD, BALL, SWAB MACHINESREFERENCE NUMBER: V-0025 COTTON PAD, BALL, SWAB MACHINES M-5138 SQUARE COTTON PAD PRODUCTION MACHINE M-5139 COTTON GAUZE PAD PRODUCTION MACHINE M-5140 MACHINE TO PRODUCE VARIOUS TYPES OF COTTON PADS M-5141 COTTON PAD PRODUCTION MACHINE M-5142 MAKEUP REMOVING COTTON PAD PRODUCTION MACHINE M-5143 ROUND COTTON PAD MAKING MACHINE M-5144 SQUARE ABSORBENT COTTON PAD PRODUCTION MACHINE M-5145 ROUND ABSORBENT COTTON PAD PRODUCTION MACHINE M-5146 ROUND COTTON PADS MAKING MACHINE M-5147 COTTON PAD MAKING MACHINE M-5148 COTTON PAD MAKING MACHINE M-5168 COTTON PADS MAKING MACHINE M-5169 COTTON Q-TIP MAKING MACHINE (100PCS/BAG) M-5170 COTTON BALL MAKING MACHINE (NEW) M-5171 COSMETIC COTTON PAD (GLOVE SHAPE) MAKING MACHINE M-5172 COSMETIC COTTON PAD MAKING MACHINE (ROUND PAD) M-5101 MEDICAL COTTON BALL MAKING MACHINE 20KG/HOUR QUANTITY AVAILABLE: 17 Learn More -
TT-5592 BEFAMA AC 40 TEXTILE SHREDDERTT-5592 BEFAMA AC 40 TEXTILE SHREDDER RECYCLING MACHINE BEFAMA AC 40 TEXTILE RIPPER BEFAMA AC 40 / 2-DRUM RIPPER Learn More -
TT-8253 MWM 2032V16, 4.2 MW EACH, NATURAL GAS, YEAR 2009, 50HzTT-8253 MWM 2032V16, 4.2 MW EACH, NATURAL GAS, YEAR 2009, 50Hz 1. BRAND: MWM 2. MODEL: 2032V16 3. FUEL: NATURAL GAS 4. YEAR OF CONSTRUCTION: 2009 5. OPERATING HOURS: 41,600 (AVERAGE) 6. MAJOR OVERHAUL E60: 2015 (AT AVERAGE 33.600 HOURS) 7. MOTHBALLED: 2019 8. ALTERNATOR: AVK 9. FREQUENCY: 50Hz 10. VOLTAGE: 11 KV QUANTITY: 14 Learn More -
TT-6264 SIDEL SBO 18, KHS, ZALKIN, MEYPACK, LOGOPAK LINE FOR NON-RETURNABLE PET BOTTLES, YEAR 1999TT-6264 SIDEL SBO 18, KHS, ZALKIN, MEYPACK, LOGOPAK LINE FOR NON-RETURNABLE PET BOTTLES, YEAR 1999 1. SIDEL SBO 18, KHS, ZALKIN, MEYPACK, LOGOPAK LINE 2. FOR NON-RETURNABLE PET BOTTLES 3. YEAR: 1999 4. CATEGORY: COMPLETE FILLING LINES 5. BRAND: SIDEL SBO 18, KHS, 6. MODEL: ZALKIN, MEYPACK, LOGOPAK QUANTITY: 1 Learn More -
YY-3265 COMPLETE LINE TO BLOW, FILL, BUNDLE, AND PALLETIZE BEVERAGES IN PET BOTTLESYY-3265 COMPLETE LINE TO BLOW, FILL, BUNDLE, AND PALLETIZE BEVERAGES IN PET BOTTLES COMPLETE LINE TO BLOW, FILL, BUNDLE, AND PALLETIZE BEVERAGES IN PET BOTTLES BLOW MOLDING LABELING HIGH PRESSURE AIR COMPRESSOR DESCON AIRVEYOR- APPROXIMATELY 400′ CROWN FILLING MACHINE AND CAPPING MACHINE ACMI BOTTLE AND CASE CONVEYOR, SHRINK WRAPPER, PALLETIZER, STRETCH WRAPPING MACHINE WATER PROCESSING EQUIPMENT QUANTITY: 1 Learn More -
COGENERATION PLANT 1.2 MEGAWATTSREFERENCE NUMBER: T-6985 COGENERATION PLANT 1.2 MEGAWATTS NEAR NEW COGENERATION SYSTEM WITH MODULAR DESIGN THAT HAS NEVER BEEN RUN IN PRODUCTION: THIS SYSTEM IS A 1.2-MEGAWATT POWER PLANT AND CAN BURN BARK, SAWDUST, AGRICULTURAL WASTES SUCH AS PEANUT SHELLS, RICE HULLS, STRAW, ANIMAL RESIDUE, WET WOOD, ETC. THIS SYSTEM WILL CONVERT SUCH WASTE PRODUCTS INTO USEABLE THERMAL AND ELECTRICAL ENERGY. THIS SOLID WASTE STREAM CAN BE CONVERTED INTO PARTICLE FORM BY THE USE OF A COMMERCIAL SHREDDER, CONVEYED TO A SILO FOR STORAGE, AND THEN FED AUTOMATICALLY INTO THE MULTI-ZONE BURNER. STEAM IS GENERATED THROUGH A LOW PRESSURE 275 DEGREE (DE-RATED FROM 300 DEGREE) STAINLESS STEEL BOILER WITH A HEAT EXCHANGER. INLET STEAM IS 475 PSIG AT 700 DEGREES FTT WITH A MAXIMUM OF 22,000 LBS/HOUR BUT COULD BE INCREASED TO 24,000 LBS/HOUR. EXHAUST STEAM PRESSURE IS 3" HGA AT 5449 RPM BUT DESIGNED TO RUN AT 4" ABSOLUTE VACUUM. STEAM IS TRANSFERRED TO THE 3-STAGE BACK PRESSURE TURBINE RATED AT 1654HP DETUNED TO 1200HP TO MATCH THE GENERATOR. THIS SYSTEM COMES COMPLETE WITH GENERATOR CONTROL CENTER, BOILER CONTROL CENTER, COMBUSTION CONTROL CENTER, CONTROL ROOM SWITCHBOARD, TURBINE OIL SYSTEM, DUST DELIVERY CONTROL SYSTEM, SWITCHGEAR AND PLC CONTROLS. THIS PLANT WAS NEW IN 2005/2006 WHEN INSTALLED AND HAS NEVER BEEN RUN EXCEPT FOR PERMITTING FUNCTION. THE TURBINE GEARBOX AND GENERATOR WERE OEM REBUILT. THE COMPANY PURCHASED THIS SYSTEM WITH A GUARANTEE THE BURNER COULD MEET NOX STANDARDS. AFTER INSTALLATION, THE BURNER COULD NOT EFFICIENTLY BURN FIBER WITH HIGH FORMALDEHYDE CONTENT. CONSEQUENTLY, THE BURNER COULD NOT MEET THOSE NOX STANDARDS THAT ARE ONE OF THE MOST STRINGENT SET OF STANDARDS IN NORTH AMERICA. THESE MULTI-STAGE BURNERS ARE USED THROUGHOUT NORTH AMERICA AND MEET OR EXCEED NOX CONTROL STANDARDS IN OTHER AREAS WITHOUT PROBLEMS. THIS COGEN SYSTEM CAN BE PROFESSIONALLY DISMANTLED, ALL EQUIPMENT TAGGED FOR REINSTALLATION AND SHIPPED TO YOUR FACILITY, REASSEMBLED, AND CONNECTED TO YOUR PRESENT ELECTRICAL GRID SYSTEM. IT WOULD TAKE APPROXIMATELY 10 WEEKS TO DISMANTLE THE PLANT AND 15 TRUCKS TO SHIP THE EQUIPMENT TO YOUR PLANT SITE, AND APPROXIMATELY 16 WEEKS TO REASSEMBLE. THIS PLANT WOULD INCLUDE EVERYTHING NEEDED EXCEPT FUEL PROCESSING (GRINDING), STORAGE AND A TRANSFORMER TO SUPPLY POWER TO YOUR FACILITY. SHIPMENT OF THE PLANT WOULD BE BROKEN DOWN AS FOLLOWS: FIVE 53' TRAILER VANS TO LEGAL WEIGHT TEN 53' FLATBED TRAILERS TOTAL WEIGHT OF COGEN PLANT EQUIPMENT = 581,000 LBS. TIE-DOWN GEAR, CHAINS, BLOCKS AND CHOKES = 6,000 LBS. GROSS CUBIC SETTING OF CARGO = 67,840 CUBIC FEET MACHINERY PROPOSAL USED 1.2-MEGAWATT POWER PLANT CONSISTING OF THE FOLLOWING: DESCRIPTION OF EQUIPMENT 3-STAGE BURNER BOILER EGR FAN ID FAN SUPPLY WATER TANK SERVICE WATER PUMP WATER SOFTNER AND FILTER BOILER WATER PUMP SYSTEM DUAL CYCLONE SEPARATOR ELECTROSTATIC PRECIPITATOR ESP TRANSFORMER ESP PUMP SYSTEM CONDENSER PUMP SYSTEM STEAM TURBINE SENTINEL GENERATOR GENERATOR CONTROL CENTER BOILER CONTROL CENTER COMBUSTION CONTOL CENTER PLANT #2 SWITCHGEAR CONTROL ROOM SWITCHBOARD TURBINE OIL SYSTEM DUST DELIVERY CONTROL SYSTEM CONDENSER CONTROL PANEL ESP CONTROL PANEL TURBINE OIL CONTROL PLANT #1 POWER SWITCHGEAR COGENERATION PROJECT LOADING ANALYSIS BOILER FEEDWATER TANK LOADPOINT: LP4 FOOTING LENGTH 9.00 FT WIDTH 9.00 FT DEPTH 0.67 FT COUNT 1 EA CUBIC FT 54.03 CUFT TOTAL CU FT 54.03 CUFT LOAD CENT. HT. 4.00 FT MACHINE FOOT: LENGTH 6.00 FT WIDTH 6.00 FT COUNT 1.00 EA TYPE 1 MACHINE WT. 16,000 LBS FOOTING WT. 8,104 LBS FOOTING LOAD 197.53 LBS/SQFT SOIL LOADING 297.58 LBS/SQFT *TANK ASSEMBLY IS BOLTED DOWN 1=EVENLY DISTRIBUTED ACROSS BASE 2=CONCENTRATED FOOTPRINT APPROX. PSF WHICH IS DISTRIBUTED OVER ENTIRE SLAB COGENERATION PROJECT LOADING ANALYSIS STEAM UNIT LOADPOINT: LP3 - FOOTING LENGTH 25.00 FT - 13.00 FT WIDTH 14.00 FT - 3.00 FT DEPTH 1.00 FT - 2.00 FT COUNT 1 EA - 3 EA CUBIC FT 350.00 CUFT - 234.00 CUFT TOTAL CU FT 584.00 CUFT LOAD CENT. HT. 8.00 FT MACHINE FOOT: LENGTH 10.30 FT WIDTH 1.00 FT COUNT 3.00 EA TYPE 2 MACHINE WT. 53,000 LBS FOOTING WT. 52,500 LBS FOOTING LOAD 151.43 LBS/SQFT SOIL LOADING 301.43 LBS/SQFT *BOILER ASSEMBLY IS BOLTED DOWN 1=EVENLY DISTRIBUTED ACROSS BASE 2=CONCENTRATED FOOTPRINT APPROX. 1,715.21 PSF WHICH IS DISTRIBUTED OVER ENTIRE SLAB COGENERATION PROJECT LOADING ANALYSIS CONDENSOR UNIT LOADPOINT: LP2 FOOTING LENGTH 23.00 FT WIDTH 3.00 FT DEPTH 3.00 FT COUNT 6 EA CUBIC FT 1,242.00 CUFT TOTAL CU FT LOAD CENT. HT. NA* FT MACHINE FOOT: LENGTH 2.00 FT WIDTH 2.00 FT COUNT 6.00 EA TYPE 2 MACHINE WT. 40,000 LBS FOOTING WT. 186,300 LBS FOOTING LOAD 1,666.67 LBS/SQFT SOIL LOADING 546.62 LBS/SQFT *CONDENSOR ASSEMBLY IS WELDED DOWN 1=EVENLY DISTRIBUTED ACROSS BASE 2=BASE PAD LOADING IS CONDCENTATED COGENERATION PROJECT LOADING ANALYSIS TURBINE-GENERATOR SET LOADPOINT: LP6 FOOTING LENGTH 21.00 FT WIDTH 9.00 FT DEPTH 1.00 FT COUNT 1 EA CUBIC FT 189.00 CUFT TOTAL CU FT 189.00 CUFT LOAD CENT. HT. 3.50 FT MACHINE FOOT: LENGTH 6.00 FT WIDTH 6.00 FT COUNT 1.00 EA TYPE 1 MACHINE WT. 38,000 LBS FOOTING WT. 28,350 LBS FOOTING LOAD 201.06 LBS/SQFT SOIL LOADING 351.06 LBS/SQFT * ASSEMBLY IS BOLTED DOWN 1=EVENLY DISTRIBUTED ACROSS BASE 2=CONCENTRATED FOOTPRINT APPROX. NA PSF WHICH IS DISTRIBUTED OVER ENTIRE SLAB COGENERATION PROJECT LOADING ANALYSIS COMBUSTION UNIT LOADPOINT: LP1 LENGTH 24.75 FT WIDTH 8.50 FT DEPTH 1.00 FT COUNT 1 EA CUBIC FT 210.38 CUFT TOTAL CU FT LOAD CENT. HT. 6.50 FT MACHINE FOOT: LENGTH 24.58 FT WIDTH 7.60 FT COUNT 1.00 EA TYPE 1 MACHINE WT. 80,000 LBS FOOTING WT. 31,556 LBS FOOTING LOAD 428.25 LBS/SQFT SOIL LOADING 597.17 LBS/SQFT *BURNER ASSEMBLY IS BOLTED DOWN 1=EVENLY DISTRIBUTED ACROSS BASE COGENERATION PROJECT LOADING ANALYSIS WET ESP UNIT LOADPOINT: LP5 FOOTING LENGTH 9.00 FT WIDTH 9.00 FT DEPTH 0.67 FT COUNT 1 EA CUBIC FT 54.03 CUFT TOTAL CU FT 54.03 CUFT LOAD CENT. HT. 9.00 FT MACHINE FOOT: LENGTH 6.00 FT WIDTH 6.00 FT COUNT 1.00 EA TYPE 1 MACHINE WT. 38,000 LBS FOOTING WT. 8,104 LBS FOOTING LOAD 469.14 LBS/SQFT SOIL LOADING 569.19 LBS/SQFT * ASSEMBLY IS BOLTED DOWN 1=EVENLY DISTRIBUTED ACROSS BASE 2=CONCENTRATED FOOTPRINT APPROX. NA PSF WHICH IS DISTRIBUTED OVER ENTIRE SLAB COGENERATION CONCRETE FOOTING LOADING ANALYSIS LIVE + LOAD DEAD FOOT WIND THICKNESS YDS WIEGHT POINT DESCRIPTION WEIGHT LENGTH WIDTH QTY PSF LOAD LBS INCHES LBS 1 COMBUSTION UNIT 80,000 25 8 1 400 12 7.41 2 CONDENSER STRUCTURE 80,000 3 3 6 1,481 36 6.00 3 STEAM GENERATOR 105,500 3 12 3 977 12 4.00 4 BOILER FEED WATER TANK 16,000 9 9 1 198 4 1.00 5 WESP UNIT 38,000 8 8 1 594 12 2.37 6 TURBINE GEN SET 32,000 6 23 1 232 12 5.11 7 SILO* 230,000 21 21 1 345,000 36 49.00 330,750 PAVE UNDER STEAM UNIT 12 28 1 4 4.15 MISC. STEEL FOOTINGS 1.5 1.5 15 12 1.25 MISC AREA PAVEMENT 72 5 1 4 4.44 84.73 8.47 FACTOR ESTIMATED CONCRETE USAGE 93.20 YARDS * SPECIFICATION MIGHT CHANGE WHEN ENGINEERING DRAWINGS COME FROM MANUFACTURER FUEL METERING BIN FUEL IS TRANSFERRED FROM A STORAGE BIN TO THE METERING BIN. THE METERING BIN IS PROVIDED TO PLACE A SUPPLY OF FUEL IN CLOSE PROXIMITY TO THE COMBUSTION SYSTEM AND ASSURE A CONSTANT SUPPLY OF FUEL TO THE COMBUSTION SYSTEM. THIS IS USUALLY A SMALL BIN PROVIDING UP TO TWO HOURS OF FUEL STORAGE CLOSE TO THE COMBUSTION SYSTEM. BIN IS SUPPLIED WITH A HATCH AND A SIGHT GLASS FOR EASILY DETERMINING THE QUANTITY OF FUEL PRESENT. THE METERING BIN IS EQUIPPED WITH A LIVE BOTTOM AUGER SYSTEM TO ASSURE A CONSTANT FLOW OF FUEL TO THE COMBUSTION SYSTEM. THE FUEL FLOWS INTO A SCREW CONVEYOR THAT TRANSPORTS THE FUEL TO THE COMBUSTION SYSTEM. THIS BIN IS EQUIPPED WITH HIGH- AND LOW-LEVEL SENSORS. FAILURE OF THE FUEL TRANSFER CONVEYORS OR A PROBLEM WITH THE PRIMARY FUEL STORAGE DEVICES IS SIGNALED WHEN THE METERING BIN LEVEL IS LOW FOR AN ADJUSTABLE PERIOD OF TIME. THE DRIVE MOTOR AND LEVEL SWITCHES ARE WIRED TO A JUNCTION BOX ON THE METERING BIN. METERING BIN SIZES WILL VARY ACCORDING TO THE FUEL NEEDS OF THE COMBUSTION SYSTEM. THESE BINS ARE SUPPLIED WITH OPEN TOPS WHEN THE CUSTOMER IS RESPONSIBLE FOR DELIVERY OF FUEL TO THE METERING BIN. THESE BINS WILL USUALLY BE ELEVATED ABOVE THE COMBUSTION UNIT FEED SCREW CONVEYOR. LEGS CAN BE PROVIDED WITH THESE UNITS TO SUPPORT THE METERING BINS FROM THE FLOOR OR THE CUSTOMER CAN PROVIDE SUPPORTS AS APPROPRIATE. THE UNITS ARE SUPPORTED FROM BELOW AT THE FOUR CORNERS OF THE BIN. COMBUSTION SYSTEM THE COMBUSTION SYSTEM CONSISTS OF SEVERAL COMPONENTS AS FOLLOWS: 1. FUEL FEED ROTARY AIR LOCK 2. FUEL FEED TRANSITION HOPPER AND HIGH/LOW LEVEL SENSORS 3. FUEL FEED SCREW CONVEYOR, EQUIPPED WITH VARIABLE FREQUENCY DRIVE 4. PRIMARY COMBUSTION CHAMBER, CONTAINING: A. CERAMIC WALL AND ARCH SYSTEM B. THREE LEVEL COMBUSTION AIR INLETS WITH INDIVIDUAL ADJUSTMENTS AND COMBUSTION AIR FANS. COMBUSTION AIR FANS ARE EQUIPPED WITH VARIABLE FREQUENCY DRIVES C. STATIONARY GRATE SYSTEM FOR INTRODUCTION OF PRIMARY AND SECONDARY COMBUSTION AIR D. ASH AUGER SCREWS FABRICATED OF HIGH TEMPERATURE STAINLESS STEEL FOR ASSURING PROPER DISTRIBUTION OF THE FIRE WITHIN THE FIRE BOX AND AUTOMATIC REMOVAL OF THE ASH REMAINING FROM THE COMBUSTION OF THE FUEL MATERIAL. 1. SECONDARY COMBUSTION CHAMBER A. CERAMIC WALL AND ARCH SYSTEM B. PROVIDES FOR AN EXTENDED DWELL TIME TO ASSURE COMPLETE COMBUSTION OF THE COMBUSTION BYPRODUCT GASES PRIOR TO LEAVING THE COMBUSTION SYSTEM. 1. HOT GAS TRANSITION FOR COMBUSTION UNIT TO HEAT EXCHANGER UNIT 2. HOT GAS DUCT WORK FROM HEAT EXCHANGER TO THE DUST COLLECTION EQUIPMENT 3. DUST COLLECTION EQUIPMENT, DESIGN DEPENDING ON FUEL AND SYSTEM SIZE 4. DUCT WORK FROM DUST COLLECTION EQUIPMENT TO INDUCED DRAFT FAN 5. INDUCED DRAFT FAN, EQUIPPED WITH VARIABLE FREQUENCY DRIVE OR AUTOMATICALLY ADJUSTABLE DAMPER, DEPENDING ON SYSTEM DESIGN AND APPLICATION. 6. EXHAUST GAS STACK, DIAMETER AND HEIGHT DEPENDING ON SYSTEM DESIGN AND APPLICATION. THE COMBUSTION SYSTEM IS PREFABRICATED TO THE EXTENT THAT IS ALLOWABLE FOR NECESSARY SHIPPING RESTRICTIONS. IN GENERAL, THE PRIMARY COMBUSTION CHAMBER IS COMPLETELY PREFABRICATED IN THE SHOP. COMBUSTION AIR FANS AND MANIFOLDS ARE INSTALLED ON THE JOB SITE. THE SIZES OF THE COMBUSTION SYSTEMS FOR THE 600 SERIES ARE APPROXIMATELY 8 FEET WIDE. THE LENGTH OF THE UNITS IS APPROXIMATELY 25 FEET. THE OVERALL HEIGHT OF THE UNIT IS APPROXIMATELY 8 FEET. THE PRIMARY COMBUSTION CHAMBERS ARE SHIPPED COMPLETE. THE EXTENDED COMBUSTION CHAMBERS ARE SHIPPED AS COMPONENTS. STEAM BOILER SYSTEMS THE STEAM BOILER SYSTEM CONSIST OF THE NEEDED EQUIPMENT ITEMS TO PRODUCE STEAM ENERGY FROM THE HOT GASES PRODUCED BY THE CHALLENGER COMBUSTION SYSTEMS. THE BOILER IS A 300PSIG, 18,819 LBS. PER HOUR. THIS SYSTEM IS MADE UP OF THE FOLLOWING COMPONENTS: HEAT RECOVERY STEAM GENERATOR (HRSG) BOILER FEEDWATER PUMP SKID BOILER FEEDWATER STORAGE VESSEL FEEDWATER TREATMENT SKID THE HRSG UNITS ARE SIZED TO RECOVER APPROXIMATELY 75 80% OF THE THERMAL ENERGY ENTERING THE DEVICE. THE STEAM ENERGY OUTPUT IS DETERMINED BY ESTABLISHING THE THERMAL ENERGY RELEASED BY THE COMBUSTION SYSTEM TO THE HOT GASES THAT WILL BE ENTERING THE HRSG. THE STEAM FLOW OUTPUT IS DETERMINED BY ESTABLISHING THE DESIRED STEAM PRESSURE AND THE HEAT INPUT. STEAM PRODUCTION WILL VARY ACCORDING TO THE QUANTITY AND TEMPERATURE OF THE HOT GASES PRODUCED IN THE COMBUSTION SYSTEM AND THE TEMPERATURE OF THE BOILER FEEDWATER AS WELL AS THE STEAM PRESSURE DESIRED. SYSTEM INCLUDES: ECONOMIZER - INSTALLED IN OUTLET OF HRSG CONDENSATE HEATER - STEAM OPERATED - INSTALLED IN THE BOILER FEEDWATER STORAGE VESSEL SOOT BLOWER - INSTALLED IN THE HRSG TO MINIMIZE THE EFFECTS OF ASH CARRY DEAERATOR - INSTALLED IN THE BOILER FEEDWATER STORAGE VESSEL THIS HEAT RECOVERY STEAM GENERATOR UNIT WAS DESIGNED AS A FIRE TUBE BOILER FOR A SINGLE PASS OF THE HOT GASES THROUGH THE UNIT WITH STEAM PRESSURES UP TO 300 PSIG. THE UNIT WAS DESIGNED WITH AMPLE STEAMING VOLUME TO ASSURE A GOOD QUALITY OF STEAM GENERATION. STEAM IS OF A QUALITY SUFFICIENT TO ENTER INTO A STEAM TURBINE GENERATOR UNIT. BOILER FEEDWATER PUMP PACKAGE IN ADDITION TO THE BOILER, A BOILER FEED WATER PUMP PACKAGE IS INCLUDED. THIS PACKAGE CONSISTS OF A PREFABRICATED SKID CONTAINING TWO BOILER FEEDWATER PUMPS AND NECESSARY PIPING AND VALVES. ONE PUMP IS THE DESIGNATED “RUN” PUMP AND THE OTHER IS A DESIGNATED “SPARE” PUMP. A FLOW METER, PRESSURE GAUGES AND TEMPERATURE GAUGE ARE PROVIDED FOR MONITORING THE PERFORMANCE OF THE PACKAGE. PUMPS ARE SIZED FOR 125% OF DESIGN CAPACITY AND ARE INTENDED TO RUN CONTINUOUSLY TO MAINTAIN DESIRED BOILER DRUM LEVEL. PUMP PACKAGES ARE SIZED TO MATCH THE HEAT RECOVERY STEAM GENERATOR UNITS. BOILER FEEDWATER STORAGE TANK THE SYSTEM ALSO INCLUDES A BOILER FEED WATER STORAGE TANK. THIS PACKAGE CONSISTS OF AN INSULATED TANK FOR STORAGE OF CONDENSATE AND BOILER FEEDWATER FOR THE BOILER SYSTEM. THE TANK IS CONSTRUCTED TO A 15 PSIG RATING AND CAN BE OPERATED AT A PRESSURE OF 5 PSIG IF NECESSARY. STANDARD DESIGNS CALL FOR VENTED TANKS. A FLOW METER FOR CONDENSATE RETURN AND A FLOW METER FOR MAKEUP WATER ARE PROVIDED. A PRESSURE GAUGE, LEVEL GAUGE AND TEMPERATURE GAUGE ARE PROVIDED FOR MONITORING THE CONDITION OF THE CONDENSATE WITHIN THE TANK. THE TANK IS PROVIDED WITH A STAND TO ELEVATE THE TANK ABOVE THE SUCTION OF THE BOILER FEEDWATER PUMPS. IN SOME CASES, IT WILL BE DESIRABLE TO LOCATE THE TANK ABOVE THE INLET TO THE BOILER. THE STANDS FOR THESE APPLICATIONS ARE TO BE PROVIDED BY THE CUSTOMER. THE TANK IS SIZED TO PROVIDE FOR OPERATION OF THE BOILER AT FULL OUTPUT FOR A PERIOD OF UP TO 20 MINUTES. THE TANK IS ALSO EQUIPPED WITH INSTRUMENTATION TO TIE THE UNIT INTO THE OVERALL COMBUSTION/BOILER CONTROL SYSTEM. THE FOLLOWING DEVICES/INPUTS ARE PROVIDED: TEMPERATURE SENSOR, PRESSURE SENSOR, LEVEL SENSOR, AND FIVE POINT LEVEL SWITCH FOR ALARMS AND SHUTDOWN LOGIC. THE PACKAGE IS ALSO EQUIPPED WITH AN AUTOMATIC WATER VALVE TO PROVIDE MAKEUP WATER IN THE EVENT THE WATER LEVEL REACHES THE LOW-LEVEL ALARM POSITION. THIS IS PROVIDED THROUGH A FLOAT OPERATED VALVE. THE TANK AND CONTROL DEVICES ARE PRE-PACKAGED WITH ALL CONTROL DEVICES WIRED TO A JUNCTION BOX MOUNTED ON THE UNIT. THE OPERATING VOLTAGE FOR THE CONTROL DEVICES IS 24VDC. THE TANK IS ALSO INSULATED TO REDUCE HEAT LOSS TO THE ATMOSPHERE. DEAERATORS A DEAERATOR HAS BEEN PROVIDED TO REMOVE UNWANTED OXYGEN AND OTHER NON-CONDENSABLE GASES FROM THE BOILER FEEDWATER. THE DEAERATOR IS PROVIDED FOR THIS PURPOSE. THIS IS GENERALLY A REQUIRED ITEM ON 150 AND 300 PSIG STEAM SYSTEMS. THIS IS A REQUIRED DEVICE ON ALL STEAM SYSTEMS PROVIDING STEAM FOR STEAM TURBINE GENERATOR APPLICATIONS. FEEDWATER TREATMENT PACKAGES BOILER FEED WATER MUST BE OF HIGH QUALITY, ALL CONTAMINANTS THAT WOULD DAMAGE THE BOILER OR STEAM TURBINES MUST BE REMOVED FROM THE FEED WATER STREAM. THERE ARE GENERALLY THREE AREAS OF CONCERN. FIRST, THE WATER MUST BE FREE FROM SOLIDS SUCH AS SAND OR OTHER CONTAMINANTS. SECOND, DISSOLVED MINERALS SUCH SODIUM AND POTASSIUM MUST BE REMOVED. THIRD, NON-CONDENSABLE GASES SUCH AS OXYGEN AND CARBON DIOXIDE MUST BE REMOVED. THE REMOVAL OF THESE CONTAMINANTS REQUIRES A THREE STAGE REMOVAL PLAN. FIRST, ALL WATER ENTERING THE BOILER SYSTEM SHOULD BE FILTERED. SECOND, THE WATER SHOULD PASS THROUGH A WATER SOFTENER UNIT OF SOME TYPE AND THIRD, CHEMICALS WILL BE ADDED TO THE WATER TO ASSIST IN THE REMOVAL OF THE NON-CONDENSABLE GASES AND OTHER CONTAMINANTS. THE FEED WATER TREATMENT PACKAGE WILL INCLUDE THE FOLLOWING EQUIPMENT: 1. WATER FILTER - DUAL UNIT 2. WATER SOFTENER - DUAL UNIT 3. CHEMICAL FEED PUMPS (3) - SEPARATE ASSEMBLY THIS EQUIPMENT IS PREPACKAGED ON A SKID. THE CONTROLS AND PUMP MOTORS ARE PRE-WIRED TO A JUNCTION BOX ON THE PACKAGE. THE CHEMICAL ADDITIVES PUMPS ARE PACKAGED INTO A PUMP STAND. THE STAND IS DESIGNED TO BE LOCATED IN A POSITION AGAINST A WALL WHERE THE CONTAINERS FOR THE VARIOUS BOILER FEEDWATER CHEMICALS CAN BE PLACED. STEAM TURBINE GENERATOR SYSTEMS AN ELLIOT MODEL 2DYR3-MULTISTAGE TURBINE WILL BE USED FOR THE SYSTEM. IT CONSISTS OF THE FOLLOWING: 5449 RPM, INLET STEAM PRESSURE 475 PSIG, INLET STEAM TEMPERATURE 700’HGA, EXHAUST STEAM PRESSURE 3” HGA, MAXIMUM INLET STEAM TEMPERATURE 750 FTT, RATED POWER 1654 HP WITH ALL HAND VALVES OPEN. IT INCLUDES: 1. GEAR REDUCER 2. ELECTRIC GENERATOR A. INDUCTION B. SYNCHRONOUS 1. LUBRICATION SYSTEM 2. INSTRUMENTATION / CONTROLS 3. GENERATOR BREAKER THE BASIC COMPONENTS WERE ASSEMBLED INTO A SKID PACKAGE. THE PACKAGE WAS PREASSEMBLED AND SHIPPED AS A COMPLETED ASSEMBLY. THE CONTROLS AND GENERATOR BREAKER ARE PRE-ASSEMBLED AND TESTED PRIOR TO BEING SHIPPED TO THE CUSTOMER. STEAM CONDENSER SYSTEMS THE PURPOSE OF A STEAM CONDENSER SYSTEM IS TO TAKE THE STEAM THAT EXITS THE STEAM TURBINE GENERATOR UNIT AND CONDENSE IT TO WATER SO THAT IT MAY BE RETURNED TO THE BOILER FEEDWATER SYSTEM. THIS ALLOWS FOR THE CONSERVATION OF THERMAL ENERGY, WATER AND THE ASSOCIATED BOILER FEEDWATER TREATMENT CHEMICALS. A WATER-COOLED DESIGN CONDENSER HAS BEEN INCLUDED. AIR COOLED CONDENSER SYSTEMS THE AIR COOLED CONDENSER SYSTEM IS MADE UP OF FRAMES THAT CONTAIN MULTIPLE ROWS OF CARBON STEEL TUBES THAT ARE WRAPPED WITH AN ALUMINUM FIN. THIS FINNED ARRANGEMENT ALLOWS THE CARBON STEEL TUBE TO CONDUCT THERMAL ENERGY INTO THE AIR SURROUNDING THE UNIT. IN ORDER TO MAXIMIZE THE HEAT DISSIPATION, THE UNITS ARE SUPPLIED WITH FANS TO MOVE THE COOLER AMBIENT AIR PAST THE FINNED TUBES. AIR POLLUTION CONTROL EQUIPMENT A COMPLETE AIR POLLUTION CONTROL SYSTEM WITH EQUIPMENT REQUIRED FOR THIS PROJECT HAS BEEN INCLUDED, BASED ON LOCAL REQUIREMENTS. THE EQUIPMENT AVAILABLE CONSISTS OF THE FOLLOWING: 1. MULTICLONE - THESE UNITS ARE DESIGNED TO REMOVE PARTICULATE MATTER THAT IS AS SMALL AS 10 MICRONS IN SIZE. SINCE AIR EMISSIONS ARE GENERALLY BASED ON A QUANTITY OF EMISSIONS ON AN ANNUAL BASIS, THOSE QUANTITIES MUST BE ESTIMATED AND QUANTIFIED. WHERE THE EMISSIONS FROM THE MULTICLONE UNIT EXCEED THOSE QUANTITIES, THEN ADDITIONAL EQUIPMENT MUST BE USED. 2. BAG HOUSES - THESE UNITS CONSIST OF MULTIPLE HIGH TEMPERATURE RATED DUST COLLECTION BAGS. THESE BAGS CAN BE PROVIDED IN DIFFERENT TYPES AND CONFIGURATIONS AS WELL AS COATED AND UNCOATED TO ACHIEVE DIFFERING COLLECTION EFFICIENCIES. THE DESIGN OF THE BAG HOUSE SYSTEMS WILL VARY ACCORDING TO LOCAL REQUIREMENTS. 3. SCRUBBERS - THESE SYSTEMS CONSIST OF A SPRAY TOWER, WATER COLLECTION BASIN, A CIRCULATING WATER PUMP SYSTEM AND A MIST ELIMINATOR SECTION. THESE UNITS INTRODUCE A FINE SPRAY OF WATER INTO THE EXHAUST GASES. THIS FINE MIST OF WATER DROPLETS ATTRACT THE DUST PARTICLES AND THE DUST PARTICLES ARE COLLECTED ON THE FINE WATER DROPLETS. THESE WATER DROPLETS THEN FALL INTO THE COLLECTION BASIN. SOME AMOUNT OF THE SPRAY IS CARRIED UP THE TOWER, THIS WATER IS COLLECTED IN A MIST ELIMINATOR SECTION OF THE TOWER AND THE COLLECTED WATER IS CHANNELED TO THE COLLECTION BASIN. A SMALL AMOUNT OF WATER IS CONTINUOUSLY BLED FROM THE COLLECTION BASIN TO REMOVE THE COLLECTED PARTICULATE MATERIAL. THIS IS GENERALLY INTRODUCED INTO THE COMBUSTION UNIT AND REMOVED BY THE ASH COLLECTION SYSTEM THAT IS A PART OF THE COMBUSTION SYSTEM. SOME SMALL AMOUNT OF WATER IS EVAPORATED AS THE COMBUSTION GASES ARE COOLED TO APPROXIMATELY 150F. A CONTINUOUS MAKE UP WATER SUPPLY IS REQUIRED. 4. WET ELECTROSTATIC PRECIPITATORS - IN SYSTEMS REQUIRING AN ADDITIONAL LEVEL OF PARTICULATE CONTROL AN ELECTROSTATIC COLLECTION UNIT IS ADDED TO THE TOP OF THE SCRUBBER SYSTEM. THIS ELECTROSTATIC UNIT REPLACES THE MIST ELIMINATOR THAT IS PROVIDED AS A PART OF THE SCRUBBER DESCRIBED ABOVE. THIS UNIT REMOVES A HIGHER PERCENTAGE OF THE DUST/WATER PARTICLES FROM THE EXHAUST GAS STREAM. CONTROL AND POWER DISTRIBUTION CONTROLS THIS COGEN PLANT HAS FULLY INTEGRATED ALL ASPECTS OF THE COGENERATIONS FACILITIES EQUIPMENT PACKAGE INTO A SINGLE CONTROL SYSTEM. THIS IS ACCOMPLISHED USING PROGRAMMABLE LOGIC CONTROLLERS AND TOUCH SCREEN OPERATOR INTERFACE DEVICES TO CREATE A WINDOW ON THE ENTIRE SYSTEM. THIS SYSTEM WAS DESIGNED FOR A MINIMUM OF OPERATOR ATTENTION. SOFTWARE IS CONFIGURED TO PRESENT CLEAR WINDOWS INTO THE FACILITIES OPERATIONS. THIS COGENERATION SYSTEM WAS SET UP WITH DUAL OPERATOR INTERFACES TO ASSURE A VIEW OF MULTIPLE OPERATING COMPONENTS AT ALL TIMES. POWER DISTRIBUTION THE POWER DISTRIBUTION EQUIPMENT IS PROVIDED AS FOLLOWS. BUT, IN GENERAL THE FOLLOWING DESCRIPTION WILL APPLY. EACH COGENERATION SYSTEM WILL BE PROVIDED WITH A FACILITY MAIN BREAKER. THIS MAIN BREAKER WILL BE PROVIDED AT THE PRIMARY VOLTAGE OF THE GENERATOR PORTION OF THE PROJECT. IN MOST CASES THIS WILL BE 480 V, 3 PH AND 60 Hz OR 400 V, 3 PH AND 50 Hz. CUSTOMERS WILL SPECIFY THE INTERCONNECTION VOLTAGE REQUIREMENTS FOR A GIVEN APPLICATION. THIS DISCUSSION IS PRESENTED BASED ON THE NOMINAL 480 VAC SYSTEM. THIS EQUIPMENT PACKAGE IS SHIPPED IN TWO PIECES; ONE INCLUDES THE MAIN BREAKER AND THE GENERATOR BREAKER AND THE OTHER INCLUDES THE VARIOUS FACILITY BRANCH BREAKERS FOR PROVIDING POWER TO THE VARIOUS SYSTEM PANELS. THE TWO PIECES ARE JOINED TOGETHER WITH A BUS SPLICE KIT ONCE INSTALLED AT THE CUSTOMER’S FACILITY. THE POWER DISTRIBUTION SYSTEM IS DESIGNED AS A MOTOR CONTROL CENTER TO FACILITATE EASY EQUIPMENT ADDITIONS IN THE FUTURE. Learn More -
T-9927 COMPLETE PLANT FOR ACRYLIC FIBER PRODUCTION, YEAR 1982 TO 2011T-9927 COMPLETE PLANT FOR ACRYLIC FIBER PRODUCTION, YEAR 1982 TO 2011 THE PLANT IS FOR THE TRANSFORMATION OF THE TOW ON TOPS FOR ACRYLIC DOES NOT PRODUCE YARNS EQUIPMENT IS STILL RUNNING THE PLANT PRODUCE 15600 KGS HOURLY PRODUCTION PER MONTH IS 468 TONS Learn More -
M-4009 FORMALDEHYDE PLANT & SYSTEMS -90,000 TON PER YEARREFERENCE NUMBER: M-4009
FORMALDEHYDE PLANT & SYSTEMS -90,000 TON PER YEAR
90,000 TON/YEAR
(200 MILLION LBS/YR @ 37% CONCENTRATION)SHUT DOWN: SPRING 2010
PLANT PRODUCES A 37% AND A 50% FORMALDEHYDE SOLUTION BY PARTIAL OXIDATION AND DEHYDROGENATION OF METHANOL.
RAW MATERIALS:
METHANOL
SILVER CATALYST
ORIGINAL PLANT EQUIPPED WITH:
MONSANTO PROCESS
(2) CONVERTERS AND ASSOCIATED EQUIPMENT, ABSORBER AND DISTILLATION COLUMN
MODIFICATIONS:
ADDED 3RD CONVERTER FOR CAPACITY IMPROVEMENTS
METHANOL VENTS SCRUBBER ADDED
WASTE HEAT BOILER ADDED
INSTALLED A DCS ON THE REACTOR SECTION (2006)
PRODUCT SPECIFICATIONS:
CLEAR AQUEOUS SOLUTIONS OF:
50U: 50.0 - 50.45% FA, <1.05% MEOH, <0.055% FORMIC ACID
37U: 37.0 - 37.3% FA, <1.05% MEOH, <0.035% FORMIC ACID
37M: 37.0 - 37.5% FA, 9 - 13% MEOH
OTHER CONCENTRATIONS AS REQUIRED UP TO 50% BOTH INHIBITED AND UNINHIBITED
CONTACT IPP FOR A COMPLETE PROCESS DESCRIPTION AND FLOW DIAGRAM
COMPLETE DOCUMENTATION AVAILABLE
FORMALDEHYDE PROCESS UNITS FOR SALE
(MAJOR UNITS ONLY. CONTACT IPP FOR A COMPLETE LIST)2.9 - 20 MM BTU/HR JOHN ZINK THERMAL OXIDIZER SYSTEM
DESIGNED TO INCINERATE TWO SOLVENT LADEN GAS STREAMS USING A SMALL AMOUNT OF NATURAL GAS.
ONE SMALL SOLVENT GAS STREAM WITH A FLOW OF 120 - 320 SCFM, THE OTHER LARGER OFF GAS STREAM OF 8,200 - 17,500 LBS/HR.
GAS BURNER IS RATED FOR 2.9 - 20 MM BTU/HR (INSTALLED NEW IN 2006)
THE WASTE HEAT BOILER PORTION GENERATES STEAM AT 25,000 LBS/HR WITH A PRESSURE OF 75 PSIG (NORMAL) UP TO 125 PSIG (DESIGN).
THE UNIT USES STAGED BURNER TECHNOLOGY TO REDUCE OR ELIMINATE NOX.
CONTACT IPP FOR A MAJOR LIST OF COMPONENTS
DISTILLATION COLUMN SYSTEM
13,000 LBS/HR LIGHT ALDEHYDES AND LIGHT ALCOHOL DISTILLATION
COMPLETE SYSTEM INCLUDES:
72" DIA. X 75' 316LSS BUEHLER-MORRIS DISTILLATION TRAY COLUMN
(2) SS SHELL AND TUBE HEAT EXCHANGERS
2,889 SQ. FT. 304SS, 1,090 SQ. FT. 316SS
(2) 316SS PLATE AND FRAME HEAT EXCHANGERS
478.35 SQ. FT., 73.2 SQ. FT.
(3) PUMPS
241 LBS/HR TO 13,000 LBS/HR
BEPEX BRIQUETTER SYSTEM
MODEL 300 MS28
SKID MOUNTED
2.5" DIA.
3,000 PSI MAX. OPERATING PRESSURE
22 RPM ROLL SPEED
INCLUDES 300 HP SIEMENS AC MOTOR, FOOTE JONES GEARBOX AND FEED HOPPER
316SS 3-EFFECT BUFLOVAK-BLAW KNOX EVAPORATION SYSTEM
36,900 LBS/HR (16,000 KG/HR)
FIRST EFFECT: 1,480 SQ. FT.
SECOND AND THIRD EFFECT: 2,950 SQ. FT.
INCLUDES (3) VAPOR BODIES WITH 1,900 GALLON CAPACITY, (3) STEAM CHESTS AND (2) OVERHEAD CONDENSERS (1,728 SQ. FT AND 1,605 SQ. FT.)
304SS STRUTHERS WELLS "KRYSTAL" CRYSTALLIZER SYSTEM
7' DIA. X 60" WITH 9' CONE BOTTOM
THIS UNIT WILL EVAPORATE APPROXIMATELY 4,400 LBS/HR OF H2O (5 LBS PER SQ. FT. SURFACE AREA OF HEATER)
INCLUDES COMPLETE ACCESSORY PACKAGE: VAPORIZER AND SUSPENSION CONTAINER, STEAM CHEST HEATER, 4,000 GALLON 347SS TANK, LIGHTNIN RIGHT ANGLE MIXER, ELBOW PUMP, OVERHEADS CONDENSER AND HYPULSE FILTER
25,400 CFM 321SS FULLER FLUIDIZED BED DRYER
12' DIA. CHAMBER
1,555 CU. FT. DRYING CHAMBER CAPACITY
DESIGNED TO DRY 8,560 LBS/HR OF PELLETS (@ 15% MOISTURE) WITH A DENSITY OF 40 LBS/CU. FT.
114,240 LBS/HR AIR FLOW
1,325,000 BTU/HR HEAT TRANSFER
INCLUDES (3) HEATING COILS (40 PSI STEAM) FOR UNDER BED HEATING
Learn More -
V-2042 WATER RECIRCULATION SYSTEM FOR WATERJETSV-2042 WATER RECIRCULATION SYSTEM FOR WATERJETS 6 LITERS PER MINUTE MAXIMUM JET HEAD USES 1 TO 2 LITERS PER MINUTE FILTRATION: FROM 5 TO 10 MICRONS Learn More