Search results for: 'electric steam boiler'
- Related search terms
- steam machi
- steam elec
- steam+elect
- steam+electr
- steam 2
-
M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More -
TT-7787 WARTSILA POWER PLANT, 169 MW, 60Hz, YEAR 2010TT-7787 WARTSILA POWER PLANT, 169 MW, 60Hz, YEAR 2010 1. WARTSILA POWER PLANT 2. COMMERCIAL OPERATION START: JANUARY 2010 3. CONTRACT STATUS: OPERATED UNDER STANDBY MODE UNTIL DECEMBER 2024 4. 20 X WARTSILA 20V32 5. 8.45MW EACH, 60Hz 6. HFO, BUT CONVERTIBLE TO DIESEL OR BIODIESEL. GREEN. VERY GOOD CONDITION Learn More -
TT-7745 BIOMASS POWER PLANT, 5 MW, YEAR 2008 TO 2010TT-7745 BIOMASS POWER PLANT, 5 MW, YEAR 2008 TO 2010 1. BRAND: BIOMASS POWER PLANT 2. 5 MW 3. CONDITION: USED QUANTITY: 1 Learn More -
G-8230 HIGH-TEMPERATURE AND HIGH-PRESSURE YARN DYEING MACHINE 40KGREFERENCE NUMBER: G-8230
HIGH-TEMPERETURE AND HIGH-PRESSURE YARN DYEING MACHINE 40KG
DESIGNED FOR DYEING, BOILING OFF, BLEACHING, AND WATER WASHING, ETC. SUITABLE FOR HANK YARN, BOBBIN OR RAW STOCK FIBER
MACHINE TYPE: VERTICAL CYLINDER
VAT DIAMETER: Ф600mm
CONE QUANTITY: 7 X 7 = 49 CONES
WORKING TEMPERATURE: 130C
MAX WORKING PRESSURE: 0.4MPA
BOTH RATIO: 1:7 TO 9
WITH COMPUTERIZED CONTROL SYSTEM
HEAT EXCHANGING: COIL TYPE HEAT EXCHANGER, WHICH CAN BE USED FOR EITHER HEATING OR COOLING.
HEAT EXCHANGING SPEED: WHEN THE HEATED STEAM PRESSURE IS 0.4MPA, 40MINUTES WILL BE REQUIRED FOR THE LIQUID INSIDE THE DYEING BARREL RAISING FROM 20OC TO 130OC. WHEN THE COOLING WATER PRESSURE IS 0. 3MPA AND THE WATER TEMPERATURE IS 20 OC, 40 MINUTES WILL BE REQUIRED FOR THE LIQUID INSIDE THE DYEING BECK TO LOWER FROM 130OC TO 80OC.
RECYCLING OF DYEING LIQUID: THE POSITIVE AND NEGATIVE RECYCLING OF DYEING LIQUID WILL BE ADJUSTED BY THE CYLINDER THROUGH THE SWITCHING DEVICE INSIDE THE CENTRIFUGAL PUMP.
SEALING OF BOILER: RUBBER ADHESIVE
THE WORKING PRESSURE INSIDE THE TANK WILL MAKE THE RUBBER SEAL CLOSELY TO ATTACH THE FLANGE. THE CONICAL SURFACE OF THE TANK MOUTH IS TO ENHANCE THE SEALING.
OPENING OF TANK COVER: FIRST OPEN THE AIR VALVE TO RELEASE THE PRESSURE INSIDE THE BOILER. WAIT UNTIL NO EXHAUSTED AIR GOING THRU THE EXHAUST VALVE AND THE READING OF PRESSURE GAUGE IS ZERO, WITHDRAW THE WRENCH HANDLE, OPEN THE CLAMPING HOOP TO REMOVE THE FLANGE; AND THEN OPEN THE COVER WITH DRAG WEIGHT. THE COVER WILL BE CLOSED.
CONFIGURATION:
1. ELECTRICAL CABINET: STAINLESS STEEL CABINET, PLASTIC COATING
2. ELECTRICAL COMPONENTS: SIEMENS, OMRON
3. COMPUTER: HG COMPUTER (MADE IN CHINA)
4. ELECTROMAGNETIC VALVE: TAIWAN YADEKE
5. PUMP: CENTRIFUGAL PUMP
6. MOTOR: WANNAN MOTOR
7. TEMPERATURE CONTROL: COMPUTER CONTROL, WITH HEATING, COOLING, KEEPING WARM, ETC. FUNCTION.
8. HEAT EXCHANGER: INTERNAL COIL HEATING
9. VALVE: STAINLESS ANGLE VALVES, PNEUMATIC BUTTERFLY VALVES
10. ONE CARRIER BASKET
11. MACHINE BODY MATERIAL: STAINLESS STEEL, 316 LITERS
12. ACCESSORIES: SEAL RING FOR DYE VAT, SEAL FOR MAIN PUMP, SEAL FOR REVERSING SHAFT
QUANTITY: 1
Learn More -
TT-5563 GENERAL ELECTRIC LM6000PA, 43MW, YEAR 1994 TO 1995, 50HzTT-5563 GENERAL ELECTRIC LM6000PA, 43MW, YEAR 1994 TO 1995, 50Hz GENERAL ELECTRIC LM6000PA YEAR: 1994 TO 1995 HOURS: 16000 TO 20000 FUEL: NATURAL GAS VOLTAGE: 11000 FREQUENCY: 50Hz SPEED: 3000RPM EACH UNIT POWER: 43MW WITH TWO BOILER WITH TWO STEAM TURBINE EACH UNIT POWER OF STEAM TURBINE: 12MW QUANTITY: 4 Learn More -
L-3867 PELLET MILL FOR CHICKEN FEEDREFERENCE NUMBER: L-3867CAPACITY: 3 TONS PER HOURPOWER: 37 KW + 0.75 KW + 1.5 KWVOLTAGE: 380 VOLTS, 50 Hz, 3 PHASEQUANTITY: 1Learn More -
V-2068 WRINKLE TYPE BANDAGE ROLLS PRODUCTION LINE INCLUDING PREFOLDING, BANDAGE DRYING, FOLDING, AND ROLLING MACHINERY (PRODUCT IS LIKE KENDALL “KERLIX”)V-2068 WRINKLE TYPE BANDAGE ROLLS PRODUCTION LINE INCLUDING PREFOLDING, BANDAGE DRYING, FOLDING, AND ROLLING MACHINERY (PRODUCT IS LIKE KENDALL “KERLIX”) THIS LINE INCLUDES PREFOLDING MACHINE, BANDAGE DRYING MACHINE, FOLDING MACHINE, AND WINDING MACHINE. FINAL PRODUCT IS 6 PLY USES 4 OUTPUT LINES, OUTPUT IS APPROXIMATELY 48 PIECES PER MINUTE FINAL WIDTH OF FABRIC: USUALLY CUSTOMERS USE 780mm WIDTH, MACHINE CAN BE MADE ACCORDING TO DIFFERENT REQUESTS MACHINE TOTAL LENGTH: 19 METERS (62.3 FEET) TOTAL QUANTITY: 1 COMPLETE PRODUCTION LINE Learn More -
TT-1676 SIEMENS SGT-100 TYPHOON GAS TURBINE, YEAR 1994, 4.4 MW AT 11,000 VOLTS, 50 HzTT-1676 SIEMENS SGT-100 TYPHOON GAS TURBINE, YEAR 1994, 4.4 MW AT 11,000 VOLTS, 50 Hz SIEMENS SGT-100 TYPHOON GAS TURBINE YEAR: 1994 MACHINE TYPE: GAS TURBINE PACKAGE BRAND: SIEMENS MODEL: SGT-100 TYPHOON GAS TURBINE 50 Hz CONDITION: GOOD CONDITION (USED) QUANTITY: 1 Learn More -
K-9326 BABCOCK WIDE TENTER FRAME 144" (3657mm)REFERENCE NUMBER: K-9326 BABCOCK WIDE TENTER FRAME 144" (3657mm) QUANTITY AVAILABLE: 1 Learn More -
M-1976 BABCOCK FRAME 144" WIDE-3600mmREFERENCE NUMBER: M-1976 (770395POK6RM) BABCOCK FRAME 144" WIDE-3600mm QUANTITY AVAILABLE: 1 Learn More