Shin Nihon Zoki, C5-R8-ER, 2018, 2000kW, 60Hz, 6600V, Condensing Type

Description

  1. Overview
    1. Steam turbine generator no. C5-R8-ER
    2. 1999 kW, 60 Hz, 6600 volt
    3. 190.1 A, power ratio 0.92 (later)
    4. RPM 8193/1800 rpm
  2. Specifications
    1. Main steam pressure: 4.0 MPa.g
    2. Main steam temperature: 450 deg. C
    3. Exhaust air pressure: 9.8 kPa.abs
    4. Max. first step extraction pressure outer control: 0.077 MPa.g
    5. Max. main steam flow volume: 11.54 t/h
    6. Max. first step extraction flow volume: 0 and 0.5 to 1.28 t/h
    7. Max. exhaust air flow volume: 11.19 t/h (at the time of 26.0 kPa abs)
  3. Condition
    1. Boiler can be included but it has a problem on the welding part
  4. Included Equipment
    1. Steam turbine generator
    2. Control unit
    3. Condenser unit
    4. Meter unit
    5. Cooling tower
    6. Any other equipment
    1. More information is available upon request