GE, PG 9351 FA, 2015, 810 MW Combined Cycle Power Plant, 50Hz, Natural Gas

Description

  1. Overview
    1. Ge 9fa ccgt package
    2. 810 mw total capacity
    3. 2 x 405 mw ccgt scope, each in 1+1+1 configuration
    4. Manufactured 2015
    5. Only 2,800 operating hours
  2. Gas Turbines
    1. Manufacturer: ge
    2. Model: pg 9351 fa with dln2.0+
    3. Quantity: 2
    4. Site rated capacity: 257,000 kw each
    5. Rated capacity: 314 mva each
    6. Fuel: natural gas
    7. Frequency: 50 hz
    8. Year of commission: 2015
    9. Total operating hours: 2,790 / 1,547 hours
  3. Heat Recovery Steam Generators
    1. Manufacturer: cmi
    2. Type: triple pressure
    3. Quantity: 2
  4. Steam Turbines
    1. Manufacturer: alstom
    2. Quantity: 2
    3. Site rated capacity: 144,000 kw each
    4. Rated capacity: 170 mva each
  5. Condition and Service History
    1. Brief operation under full ge ltsa
    2. Currently under ge preservation
    3. Equipment is sold as-is, installed at current
    4. Inspection arrangements welcome
  6. Included Scope
    1. 2 x 257 mw 9fa gas turbine
    2. 2 x cmi hrsg
    3. 2 x 144 mw alstom steam turbine
    4. Full ccgt site scope plus auxiliaries