Description Overview 18 mw 50 hz coal fired power plant Installed in 2005 and completed in 2006 Put into formal operation in 2006 Configuration: 2 x 75 t/h cfb boilers + 1 x 15 mw extraction condensing steam turbine + 1 x 18 mw generator Boilers Each boiler is equipped with 2 sets of water cooling rolling type slag coolers Boiler is equipped with fuel supply system (oil tank, oil pump and ignition device) Turbine and Generator Extraction condensing turbine unit, model C15-4.9/0.98 Rated output: 15 mw, maximum output: 18 mw Generator: 1 x 18 mw