Item 11: (2) Siemens V 64.3 gas turbines, Siemens steam turbine, 2 boilers and auxiliaries, complete plant, 180 MW, natural gas and LFO fuel, 50 Hz, built 2001, just overhauled, very good condition.
Item 12: (3) GE Frame PG9171E complete power plants, 128 MW, 15 kV, natural gas and light oil fuel, new.
Item 13: (2) Fiat Avio model TG 50 - D5 gas turbine packages, 127 MW, built 1998, dismantled, overhauled, upgraded from Siemens and dismantled.
Item 14: (2) ABB 50 WT 18H-66 gas turbine packages, complete plant, 125 MW, dual fuel, 50 Hz, built 1995, just overhauled, warranty possible.
Item 15: (1) GE Frame 6FA combined cycle power plant, 93 MW, natural gas fuel, built 1997, major inspection in 2009.
Item 16: (1) Siemens Westinghouse Mitsubishi combined cycle power plant, 73 MW, natural gas fuel, 50 Hz, built 1999, hours: 97,000.
Item 17: (2) Siemens SGT 600 gas turbines and ABB steam turbine combined cycle power plant, 58 MW, natural gas and light oil fuel, 50 Hz, built 1995, recently overhauled.
Item 18: (5) Siemens SGT 100 gas turbines including HRSG and steam turbine complete power plant, 47 MW, natural gas fuel, 50/60 Hz, built 2000, recently overhauled.
Item 19: (5) Siemens Typhoon and Alstom complete plant including 5 gas turbine packages, 1 steam turbine, boiler, and auxiliaries, 46 MW, natural gas and naphtha fuel, 50 Hz, built 2000, low hours, still in operation.
Item 20: (1) GE LM 6000PA combined cycle power plant, 42 MW, natural gas fuel, 50 Hz, built 1997, last hot end overhaul was at 86,080 hours in Aug 2010.
Item 21: (1) Thomassen PG-6541 gas turbine package with HRSG, 41 MW, 50 Hz, natural gas/fuel oil fuel, built 1995, last overhaul at 118,350 hours.
Item 22: (1) GE Frame 6 B dry low NOx combined cycle power plant, 40 MW, natural gas and light oil fuel, 50 Hz, built 1992, recently overhauled, still good for more than 24,000 running hours, ready to ship.
Item 23: (1) GE RLM 2500 PE and Alstom steam turbine combined cycle power plant, 27 MW, natural gas fuel, gas turbine built 1994, steam turbine built 1996.
Item 24: (1) Frame 5 PG-5371 PA gas turbine, 26.59 MW, gas fuel, built 1995, hours: 174,104.
Item 26: (2) Solar Centaur 50, 50T5701 and 50T5701-59-GW CHP plant electric, 9.2 MW, natural gas and light diesel fuel, built 2005 and 2008, hours: 89,190 and 81,583.
Item 27: (1) Solar Mars 90 combined cycle solar gas turbine power plant, 8.8 MW, 60 Hz, built 1989, last major overhaul in 2004, only 1,225 running hours.
Item 28: (1) Tornado dual fuel turbo-generator plant, 5.8 MW, 50 Hz, gas and oil fuel, built 1987, overhaul at 111,000 hours.
Item 29: (1) Solar Centaur 50 T6201 Solo NOx complete package, 4.5 MW, gas and oil fuel, 50 Hz, built 1995, overhauled and modified in 2006, only 7,000 hours after last major overhaul.
Item 30: (1) Solar Centaur 50 complete power plant, 4.4 MW, 10 kV, gas fuel, 50 Hz, built 2008, hours: 34,000.
Item 31: (1) Solar Centaur 50 complete power plant, 3.8 MW, 6.3 kV, gas and oil fuel, 50 Hz, built 1990, last overhaul 2009.
Item 32: (1) Solar Saturn 20 complete power plant, 1.2 MW, 10 kV, gas and oil fuel, 50 Hz, built 1995, hours: 37,500.
Diesel And Gas Engines
Item 33: (1) Wartsila 16 V 46 B HFO fuel complete power plant including HRB, 12.9 MW, 50 Hz, built 1996, overhauled 2009, 4,150 hours.
Item 34: (4) Wartsila W 20V 34 SG natural gas fuel complete power plant, 8.8 MW each, 11 kV, including 4 steam boilers with 13 bar and 4.7 t/h, coolers, transformers, 50 Hz, built 2005, 50,000 hours, good condition.
Item 35: (1) Wartsila 12V32LN HFO diesel power plant, 5.77 MW, 50 Hz, oil fuel, built 1993, 75,870 hours.
Item 36: (2) Mitsubishi 18KU30 diesel engine generators HFO fuel complete power plant, 5.25 MW, 11 kV, 3 phase, 50 Hz, 750 rpm, built 1988, 91,000 and 92,000 hours, running.
Item 37: (1) Halberstadt 12 VDG 48/42 gas and diesel fuel complete power plant, 5.2 MW, 10.5 kV/50 Hz, built 1994, 20,000 hours.
Item 38: (4) Caterpillar G3616 natural gas fuel packages, 3.88 MW, 50 Hz, built 2008, new, never installed, stored in warehouse.
Item 39: (9) MWM - Deutz TCG 2032 V 16 natural gas fuel complete power plant, 3.88 MW, 11 kV/50 Hz, built 2008 and 2009, new.
Item 40: (1) Deutz/TBG632 V16 natural gas complete power plant, 3,620 kW, 400 V, 50 Hz, built 2003, 15,821 hours, last maintenance 2009 at 14,000 hours.
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.