Description Overview Gas turbine generator set: 100 MW x 5 Frequency: 60 Hz Fuel: LNG Year: 1995 Stopped operation: middle of 2013 Gas Turbines Manufacturer: Westinghouse Model name: W501D5 Type: Axial flow Power output: 100,000 kW (100 MW) Stages: 4 stages Inlet temperature: 1093 °C Exhaust temperature: 530 °C Exhaust flow: 1,313,272 kg/h TAC temperature: 15 °C Speed governor: DEHC Starter System Type: Electric motor Capacity: 1530 kW Quantity: 1 each Combustor Type: Can-annular Quantity: 14 each Compressor Type: Axial flow Air mass flow: 358 Nm³/min Inlet temperature: 15 °C Pressure ratio: 14:01 Outlet pressure: 14.462 kg/cm² Stages: 19 stage Outlet temperature: 389 °C Generators Manufacturer: Westinghouse (Siemens) Type: OAC (open-air-cooled) Rated power: 129 (143) MW (MVA) Power factor / short-circuit ratio: 90% / 0.695 Frequency: 60 Hz / 2 pole Speed: 3600 rpm Rated voltage / current: 13.8 kV / 5731 A Insulation class: F Exciter Speed: 3600 rpm Exciter type: PMG Rated voltage / current: 325 V / 1006 A Protection devices: 87G, 59GN, 40, 32, 46, 51V, 60, 25 Neutral grounding: NGR Bus bar: IPB (3 phases) Rotation direction: CW (viewed from exciter end) Operation Period Gas turbine #2: 37,013 hours (1996.1–2013.6) Gas turbine #3: 39,800 hours (1996.1–2013.6) Gas turbine #4: 41,541 hours (1996.7–2013.6) Gas turbine #5: 41,819 hours (1996.7–2013.6) Gas turbine #6: 40,524 hours (1996.7–2013.6) Operation Hours from Overhaul to Stop Gas turbine #2: 16,611 hours Gas turbine #3: 17,098 hours Gas turbine #4: 15,686 hours Gas turbine #5: 17,978 hours Gas turbine #6: 16,921 hours Supply List Gas turbine Generator Control panel (electric package) Breaker Mechanical room equipment L/C T.R Steam Turbine and Generator Manufacturer: Hitachi (Japan) Year: 1971 Overhaul year: 1997 Type: TCDF reheat condensing 23 Power output: 150,000 kW Rotor speed: 3600 rpm Number of stages: HP 6 / IP 7 / LP 5 Main steam pressure: 100.1 kg/ Main steam inlet temperature: 498.2 Reheat steam inlet pressure: 34.4 kg/ Reheat steam inlet temperature: 353.9 Reheat steam outlet pressure: 31.7 kg/ Reheat steam outlet temperature: 501.5 Exhaust pressure: 38 mmHg (A) Speed governor: Electro-hydraulic governor Generator Specification Manufacturer: Hitachi (Japan) Year: 1971 Type: TFLH Rated power: 150 MW (MVA) Power factor: 85% / 0.58 Frequency: 60 Hz / 2 pole Speed: 3600 rpm Rated voltage / current: 17 kV / 6521 A Insulation class: B Exciter Speed: 3600 rpm Exciter type: Rotary rectifier Rated voltage / current: 284 V / 1060 A Protection devices: 87G, 64G, 59F, 40F, 46F, 32, 21G Neutral grounding: Grounding transformer Bus bar: IPB (3 phase) Super Heater Max. operating pressure: 121 kg/44? Outlet pressure: 91.9 kg/29.5? Outlet temperature: 484.4? /303? Reheater Max. operating pressure: 44 kg/? Max. operating temperature: 523.9? Outlet pressure: 29.5 kg/? Reheat steam flow: 137.7 ton/h Operation Hours Steam turbine #1: 34,998 hours (1997.7–2013.6) Steam turbine #2: 37,723 hours (1997.7–2013.6)