Description Overview Power plant installation started in 2017 but was never commissioned. It is zero-hour and for sale immediately as a complete combined cycle power plant. Some guarantees are still valid by OEM. Specifications Power capacity: 77 MW combined cycle power plant. Gas turbine: Rolls Royce Trent 60 DLE, 63 MW, most advanced aero derivative gas turbine in its class. 42.5% simple cycle turbine efficiency. 53% combined cycle efficiency. Fast cold start under 10 minutes. Fuel: natural gas. Steam turbine: Siemens AG, 30 bara, 17.9 MW. HRSG: Nooter/Eriksen. Switchyard: produced and installed by Alstom Energy. 50 Hz. Condition Current status: all equipment is at site. Installation started in May 2017.