Description Overview Solar Taurus T-70 gas turbine package 7.1 MW 60 Hz Installed in 2001 Was in operation until December 2019 2500 hours since new and 825 starts Emission Solonox 25-ppm (dry low nox) Package delivered fully enclosed and suitable for outdoor installation Specifications Kato alternator, 13800 V Neutral grounding resistor Complete switchgear system, self-contained with HVAC Solar Turbotronics controller with remote interface Solar SCADA Fuel gas compressor Ariel built by Exterian Included Components Complete fire system with bottles Complete air filtration system (huff and puff self-cleaning) Exhaust silencer and stack All documentation, drawings, manuals, PFD, and P&ID Condition Was fully operational until December 1, 2019, at which time it was fully inspected by Solar Includes borescope reports Package was removed December 2, 2019 and laid up with all storage preparation, sealing the equipment for long term storage Available for immediate loading Equipment is available for immediate shipment at storage facility