Siemens, SGT-800, 2013, 205MW, 50Hz, Combined Cycle Power Plant

Description

  1. Overview
    1. Siemens (SGT-800) complete combined cycle power plant
    2. Installed capacity: 205 MW
    3. Energy generation capacity: 1640 GWh/year
    4. Configuration: 3 x SGT-800 GT + 1 x ST, 50 Hz
    5. Total gross efficiency / net efficiency: 55% / 53.6%
  2. Commissioning and Operation
    1. Commissioning date: 16.06.2013
    2. Commissioned as simple cycle in August 2012 and as combined cycle in June 2013
    3. Shutdown in January 2023 and currently under preservation
    4. Current running hours since new: 30,000 hours
  3. Major Components
    1. 3 gas turbines (Siemens SGT-800)
    2. 1 steam turbine (Siemens SST-900)
    3. 3 HRSG (Aalborg, Denmark)
    4. 1 ACC (SPX, Belgium)
    5. 1 RMS station
    6. HV switchyard and BOP equipment including transformers, spare parts, control system, water conditioning system, etc.
  4. Transmission
    1. Electricity transmitted to high voltage switchyard through 28 km 2x1272 MCM overhead transmission line