Lee C. Moore, Rig 8 National 1320 UE, 2007, 142 ft Mast, 1000000 lbs Capacity, 2000 HP Drawworks

Description

  1. Mast And Substructure
    1. Lee C. Moore, 142’ high cantilever type mast, with cantilever substructure, 36’w x 25’h x 75’l
    2. 1,000,000 lbs static hook load capacity with 12 lines
    3. Setback capacity 500,000 lbs and 800,000 lbs
    4. Complete with racking board platform
    5. Drillers and off-drillers side top dog, drillers’ lockers, storage boxes and knowledge box
    6. Catwalks with (8) 18” high pipe racks, (4) triangular pipe racks
    7. Caterpillar iii mast and substructure inspection - may, 2007
    8. Mast repaired and mp inspected - may, 2007
    9. Api category i inspection - february, 2013
    10. New mast raising lines - july, 2013
    11. Crown overhauled with new crown sheaves by api repair facility - may, 2014
    12. New hang-off line and winch blocks - may, 2014
  2. Drawworks
    1. National 1320 ue, 2,000 hp, 1-3/8” lebus grooved drum draw works with (2) ge 752, 1,000 hp dc traction motors
    2. Complete with national make-up and break-out catheads, over-running clutch, air drillers console and baylor elmagco model 7838 electric brake
    3. Baylor elmagco auxiliary brake overhauled - september, 2009
    4. Drawworks drum shaft and clutch assembly overhauled - march, 2008
    5. Elmagco brake - new brake controller, cabinet and transformer - november, 2013
  3. Rotary
    1. National c-275 27-1/2” rotary table with independent drive, with (1) ge 752, 1,000 hp dc traction motors
    2. Complete with emergency mechanical independent drive
  4. Traveling Block
    1. National, model 660g500 hook block, 500 ton capacity with (6) 60” sheaves, 1-3/8” line
    2. Travel block refurbished (api shop) - december, 2011
  5. Swivel
    1. National model p500, 500 ton swivel
    2. Swivel inspection, overhaul and certification (api shop) - july, 2012
  6. Triplex Mud Pumps
    1. (2) Gardner-denver pz-11, 1,600 hp triplex pumps, each with (2) ge 752, 1,000 hp dc traction motors, (1) hydril model k-20-5000 pulsation dampener and (1) 6x5 mission magnum 70 hp centrifugal charge pump
    2. Mud pump 1 - crosshead and crank shaft overhaul - january, 2012
    3. Mud pump 2 - wrist pins and bearing replaced - october, 2012
    4. Mud pump 2 - replace crank and pinion bearings - march, 2013
  7. Scr House
    1. Ross hill, model 1650 with (4) bays, 1800 amp capacity, 750 volts dc, with ac buss
    2. Including (1) general electric 770 line motor control center, model 434x162003, 480 volts, 3 phase, 60 hz., mounted in a 10’h x 10’w x 30’l temperature controlled house
  8. Fuel Tank
    1. (1) 330 bbl. 8’ dia. fuel tank with (2) 1-1/2”, 3 hp fuel transfer pumps
    2. (1) 300 bbl fuel tank
  9. Water Tanks
    1. (1) 570 bbl. open top tank and (1) 150 bbl. with 11’ skid extension with (2) 4 x 3 30 hp centrifugal pumps
  10. Shale Tank
    1. 600 bbl. flat bottom tank, internal plumbing, mud jets, (2) 10 hp agitators, covered porch with (2) 6 x 5, 60 hp centrifugal pumps
    2. New tank, pumps and agitators installed - january, 2014
  11. Mud Trip Tank
    1. 150 bbl. flat bottom trip tank with 7’l porch and (2) 4x3, 30 hp centrifugal pumps
  12. Intermediate Tank
    1. 500 bbl. flat bottom tank, (3) compartment tank, internal plumbing, mud jets, with (3) 10 hp mud agitators
    2. New tank installed - january, 2014
  13. Suction Tank
    1. 425 bbl. flat bottom, (1) compartment tank with (3) triplex pump suction outlets, internal plumbing, mud jets, (3) 10 hp mud agitators, with covered porch with (2) 6 x 5, 60 hp centrifugal pumps
    2. New tank, pumps and agitators installed - january, 2014
  14. Desilter / Desander / Shaker
    1. Dg-atm nov atmospheric degasser with 10 hp pump
    2. Brandt desilter with (16) 4” cones
    3. Brandt desander with (2) 12” cones
    4. (2) Brandt cobra shale shakers
    5. Brandt shaker #1 basket replacement - january, 2014
  15. Blow Out Prevention Equipment
    1. Closing unit: cameron, six (6) station, 120 gallon capacity
    2. Annular preventer: hydril type gk - 13-5/8” x 5,000 psi
    3. Currently undergoing api five (5) year inspection and certification - estimated completion march, 2015
    4. Ram preventer: cameron type u, 13-5/8” x 10,000 psi double ram preventer
    5. Currently undergoing api five (5) year inspection and certification - estimated completion march, 2015
    6. Cameron type u, 13-5/8” x 10,000 psi single ram preventer
    7. Drilling spool, 13-5/8”, 10,000 psi with (1) 4-1/16’ and (1) 2-1/16” flanged side outlets
    8. Valcon 10,000 psi choke manifold with 4-1/16” hydraulic gate valve, 2-1/16” and 4-1/16” outlets, (2) 2-1/16” gate valves, and (1) 4-1/16” gate valve
  16. Auxiliary Equipment
    1. (16) 8” slick drill collars
    2. (32) 6-1/2” o.d. x 2-13/16” i.d slick drill collars
    3. 550 joints 5” 19.50#, s-135 drill pipe with hard band and tk lined
    4. Compressor house with grasshopper
    5. Mud house
    6. Tool house
    7. Change house
    8. Parts house
    9. (2) Junk boxes
    10. (1) Sub box
    11. (2) Ingersoll-rand model k6u air hoists
    12. Inter-american model surveyor with 15,000’ wire line
    13. Kelly: 5-1/4” hex x 42’l
    14. Kelly drive bushing
    15. Kelly spinner
    16. Upper kelly valve
    17. Lower kelly valve, 5,000 psi
    18. National model d dead line anchor
    19. Martin decker, type e, 900,000 lb. capacity
    20. Opi pipe spinner
    21. Steel framed rig mats
    22. Wire suitcases
    23. Tool pusher quarters
    24. 12 person crew quarter
  17. Specifications
    1. Generators: (3) Caterpillar 3512C, 1,476 BHP