Westinghouse, CW251B12A, Gas Turbine Generator Co-Generation Power Plant, 150 MW, 3 Units

Description

  1. Overview
    1. Westinghouse CW251B12A turbines
    2. 46,690 kW rating
    3. 5,427 rpm
    4. Natural gas / No. 2 distillate fuel
  2. Site Conditions
    1. 45 degrees Fahrenheit ambient temperature
    2. 4.6 in H2O inlet pressure
    3. 19 in H2O
    4. 105 degrees Fahrenheit maximum turbine inlet temperature
    5. 1,050 degrees Fahrenheit
    6. 383 lb/sec air flow
  3. Unit Histories
    1. CT1: 7,367 ebh since last outage, 161 e starts since last outage, 88,679 lifetime ebh (hours), 36,331 hours since last major, 16,753 hours since last hgp
    2. CT2: 5,338 ebh since last outage, 57 e starts since last outage, 89,861 lifetime ebh (hours), 40,216 hours since last major, 15,147 hours since last hgp
    3. CT3: 9,301 ebh since last outage, 489 e starts since last outage, 74,960 lifetime ebh (hours), 26,777 hours since last major, hours since last hgp n/a
  4. Included Equipment
    1. Three (3) Nooter Ericson HRSG 800 psig
    2. All associated equipment
  5. Specifications
    1. Capacity: 150 MW