Description Overview Eight-unit GE Frame 7 gas turbine-generator fleet with approximately 600 mw combined total. Fleet consists of four ge frame 7ea units and four ge frame 7b/e units. Each unit supplied as a complete power generation package including gas turbine, generator, controls, and auxiliary systems. All eight units subject to a comprehensive overhaul and upgrade program by a third-party refurbishment contractor. Program intended to bring units to zero-hour maintenance condition with performance warranties on output and heat rate at iso conditions. Availability Four frame 7ea units available q4 2027. Four frame 7b/e units available q1 2028. Ge Frame 7ea Units – Individual Specifications Four ge frame 7ea gas turbine-generator packages included. 7ea turbine models: pg7121ea, pg7121ea, pg7121ea, pg7111ea. Year of manufacture: 2008, 2008, 2015, 1989. Refurbishment Package Summary Eight gas turbine-generator packages. Approximately 600 mw combined total. Full overhaul and upgrade program. Rebuilt to zero-hour maintenance condition.