Description
- Headline Configuration
- 2 x GE PG 9171E gas turbines
- 2 x vertical HRSG
- 1 x GE steam turbine (2+1 configuration)
- Dual fuel
- Extender-upgraded hot gas path
- >95% historical availability
- Section 01 – Asset Overview
- A complete 375 MW class natural gas fired combined cycle power plant is offered for sale.
- The plant is configured as a classic 2+1 block: two General Electric PG 9171E heavy-duty gas turbines, two vertical heat recovery steam generators, one General Electric steam turbine, and the full balance of plant, electrical and auxiliary systems.
- The unit was commissioned in 1997 and operated in continuous baseload service under a long-term power purchase arrangement throughout its life.
- Operation was uninterrupted and disciplined: the plant recorded in excess of 95% availability and suffered no significant or chronic failures.
- Because the machines ran baseload rather than in cycling duty, thermal and mechanical ageing of the hot gas path and rotors is correspondingly low for the accumulated fired hours.
- Both gas turbines have been extender-upgraded by the original equipment manufacturer and are at the most current configuration for this frame.
- Following the last major outages, approximately 24,000 operating hours remain before the next scheduled maintenance intervention is required.
- Complete detailed maintenance records and outage reports are available, together with a full set of operating and maintenance spare parts.
- Total net output: 375 MW
- Block configuration: 2 + 1
- Year commercial operation: 1997
- Historical availability: >95%
- To next outage: ~24,000 h
- Plant Data
- Plant type: natural gas fired combined cycle (CCPP)
- Configuration: 2 x gas turbine + 2 x HRSG + 1 x steam turbine (2+1)
- Gross output: approx. 375 MWe
- Year of start-up: 1997
- Fuel: natural gas and distillate oil (dual fuel)
- Frequency: 50 Hz
- Condenser cooling: sea water, titanium tubes
- Availability: complete plant, or major sub-packages by negotiation
- Ratings and operating hours throughout this document are rounded; exact nameplate figures and performance test data are released to qualified buyers under NDA.
- Accumulated Operating Hours
- Gas turbine 1: approx. 179,000 h
- Gas turbine 2: approx. 172,000 h
- Steam turbine: approx. 176,000 h
- Section 02 – Key Selling Points
- Proven, well-documented machine. No significant or chronic malfunctions across the operating life. Detailed maintenance and outage reports are available for review.
- Low effective ageing. Continuous baseload operation under a firm offtake arrangement, rather than cyclic start-stop duty, which is the primary driver of hot gas path and rotor life consumption.
- OEM extender upgrade already performed on both gas turbines – the machines sit at the latest available configuration for the frame, with the associated performance and interval benefits.
- Approximately 24,000 running hours to the next scheduled outage, giving a new owner immediate generating availability without a near-term major maintenance capital call.
- True dual-fuel capability – natural gas and light fuel oil – providing fuel security and the ability to serve markets where gas supply is seasonal or constrained.
- Complete package. Gas turbines, HRSGs, steam turbine, generators, step-up and auxiliary transformers, water treatment, cooling, compressed air and emergency power are all included.
- Full spare parts inventory for both operation and maintenance is available with the plant.
- Mainstream, well-supported technology. GE 9E-class frames and Mark V controls are among the most widely installed in the world, with a deep global service, parts and relocation ecosystem.
- Deployment options. The plant suits a buyer seeking grid-scale dispatchable capacity, an industrial group requiring large captive generation with steam export potential, or a developer in a market where new-build lead times and capital cost make a relocated CCPP the faster route to power. Sale of the complete plant or of major sub-packages will be discussed.
- Section 03 – Major Equipment: Gas Turbines
- The plant is equipped with two US-origin General Electric PG 9171E heavy-duty gas turbines.
- Each machine has fourteen combustion chambers and is arranged for dual-fuel firing on natural gas and distillate oil.
- Both units have been upgraded by the manufacturer to the current extender configuration.
- Number of units: 2
- Brand / model: GE / PG 9171E
- Capacity: approx. 120 MWe each (ISO conditions)
- Fuel: natural gas / distillate oil
- Efficiency: approx. 34%
- Compressor stages: 17
- Compression ratio: 1:12.4
- Turbine stages: 3
- Combustion chambers: 14
- Combustion chamber temp.: 1,100 – 1,200 °C (2,192°F)
- Exhaust gas flow: approx. 410 kg/s
- Exhaust gas temperature: 550 °C (1,022°F)
- Start-up: medium-voltage crank motor, 1,100 kW (1,475.1 hp)
- Oil & generator cooling: fan cooling + heat exchanger
- Fire protection: CO2, 7 t tank
- Compressor washing: online / offline water wash
- Control system: GE Mark V
- Gas Turbine Generators
- Number of units: 2
- Brand: Elin
- Capacity: 160 MVA
- Output voltage: 15,750 V
- Power factor: 0.85
- Cooling: air cooled
- Frequency: 50 Hz
- GT Step-Up Transformers
- Number of units: 2
- Capacity (ONAN/ONAF): 120 / 160 MVA
- Voltage LV / HV: 15.75 kV / high voltage (withheld)
- Brand: ABB
- Gas Turbine Inlet Air Cooler (Chiller)
- Number of units: 1 (GT1 only)
- Brand: Trane
- Model: CDHG 2150 X 2
- Section 04 – Major Equipment: Steam Cycle – Steam Turbine
- Number of unit: 1
- Brand / model: GE / 270 T338
- Capacity: 130 MW
- HP section: 510 °C (950°F), approx. 50 kg/s, 80 bar
- IP section: 300 °C (572°F), 9 kg/s, 8 bar
- LP section: 157 °C (315°F), 2 kg/s, 3.5 bar
- Control system: GE Mark V
- The steam turbine has accumulated approximately 176,000 operating hours; reports are in the data room.
- Heat Recovery Steam Generators
- Number of units: 2
- Brand: Belleli (NEM design)
- Type: vertical
- Capacity: 2 x approx. 230 t/h
- HP section: approx. 50 kg/s, 80 bar
- IP section: 9 kg/s, 8 bar
- LP section: 2 kg/s, 3.5 bar
- Efficiency: approx. 80%
- Control system: Foxboro I/A Series
- The HRSGs are vertical three-pressure units of NEM design, fabricated by Belleli, and have run the same continuous baseload duty as the gas turbines.
- Condenser
- Cooling medium: sea water
- Number of tubes: approx. 10,800
- Cooling surface area: approx. 7,200 m2 (77,500.2 sq ft)
- Tube diameter: 19.5 mm (0.8 in)
- Tube material: titanium
- Vacuum pressure: 30 mmHg
- Tube cleaning: sponge ball (Taprogge)
- The condenser is titanium-tubed with a Taprogge sponge-ball on-load cleaning system, protecting tube condition throughout sea water service.
- Steam Turbine Generator
- Number of unit: 1
- Brand: Elin 9A3
- Capacity: approx. 155 MVA
- Output voltage: 15,750 V
- Power factor: 0.85
- Frequency: 50 Hz
- ST Step-Up Transformer
- Number of unit: 1
- Capacity (ONAN/ONAF): 120 / 160 MVA
- Voltage LV / HV: 15.75 kV / high voltage (withheld)
- Brand: ABB
- Section 05 – Balance of Plant & Electrical: Boiler Feed Water Pumps
- Number of units: 4
- Brand: Nuovo Pignone
- Capacity: 220 m3/h
- Power: approx. 810 kW (1,086.2 hp)
- Discharge pressure: approx. 105 kg/cm2
- Condensate Pumps / Bypass
- Condensate pumps: 2, Sulzer
- Capacity: approx. 720 m3/h
- Power: approx. 375 kW (502.9 hp)
- Discharge head: approx. 165 m (541.3 ft)
- Steam bypass: Fisher – Contek, CVS-132-L-FSH-M3
- Bypass capacity: 100%
- Auxiliary Transformers
- 15 MVA (ONAN/ONAF rating), generator voltage / MV windings, ONAN cooling, ABB, qty 1, year 2016
- 10 / 13 MVA (ONAN/ONAF rating), MV / MV windings, ONAN/ONAF cooling, ABB, qty 2, year 1999
- 750 kVA (ONAN/ONAF rating), LV / MV windings, AN cooling, AEG, qty 3, year 1995
- 750 kVA (ONAN/ONAF rating), LV / MV windings, AN cooling, AEG, qty 1, year 1995
- 8 / 10 MVA (ONAN/ONAF rating), MV / MV windings, ONAN/ONAF cooling, ABB, qty 1, year 1995
- High-voltage levels are withheld throughout this document; full nameplate data and the electrical single-line diagram are released under NDA.
- Emergency Diesel Generator
- Number of units: 1
- Type: diesel generating set
- Engine: Cummins KTA series
- Rating: approx. 500 kVA
- Output: low voltage, 3-phase
- Frequency: 50 Hz
- Year: 1996
- Air Compressors
- Number of units: 2
- Brand / type: Atlas Copco / ZR75W
- Discharge pressure: 10 bar
- Power: 75 kW (100.6 hp)
- Demineralised Water Plant
- Brand: AWE
- Capacity: 15 m3/h
- Carbon filters: 2
- Cation exchangers: 2
- Degasser tower: 1
- Anion exchangers: 2
- Mixed bed: 1
- Sea Water Pumps
- Number of units: 2
- Brand: Sulzer
- Motor power: approx. 1,900 kW (2,547.9 hp)
- Nominal voltage: medium voltage
- Speed: approx. 500 rpm
- Nominal capacity: approx. 22,800 m3/h
- Section 06 – Maintenance History
- Both gas turbines have been maintained on a disciplined combustion inspection / hot gas path / major inspection cycle since commercial operation.
- Outage type, year and the accumulated fired hours at each intervention are set out below.
- Full outage reports and inspection findings are available in the data room.
- CI – combustion inspection; HGP – hot gas path inspection; MI – major inspection; EXT – extender upgrade.
- Fired hours are rounded; exact hours, outage dates and full inspection reports are released under NDA.
- Gas Turbine 1 – Outage Record
- Commercial operation: 1994
- Outage 1: CI, 1996, 9,500 fired hours, interval –
- Outage 2: CI, 1997, 19,000 fired hours, interval 9,500 h
- Outage 3: HGP (EXT), 1998, 27,000 fired hours, interval 8,000 h
- Outage 4: MI (U/R), 2001, 51,500 fired hours, interval 24,500 h
- Outage 5: HGP, 2004, 75,500 fired hours, interval 24,000 h
- Outage 6: MI, 2007, 105,000 fired hours, interval 29,500 h
- Outage 7: HGP, 2010, 129,000 fired hours, interval 24,000 h
- Outage 8: MI, 2013, 154,500 fired hours, interval 25,500 h
- Outage 9: HGP, 2022, 179,000 fired hours, interval 24,500 h
- Gas Turbine 2 – Outage Record
- Commercial operation: 1996
- Outage 1: CI, 1997, 8,500 fired hours, interval –
- Outage 2: CI, 1998, 17,500 fired hours, interval 9,000 h
- Outage 3: HGP (EXT), 1999, 26,500 fired hours, interval 9,000 h
- Outage 4: MI, 2002, 52,500 fired hours, interval 26,000 h
- Outage 5: HGP, 2005, 76,000 fired hours, interval 23,500 h
- Outage 6: MI, 2008, 100,500 fired hours, interval 24,500 h
- Outage 7: HGP, 2011, 122,500 fired hours, interval 22,000 h
- Outage 8: MI, 2014, 144,500 fired hours, interval 22,000 h
- Outage 9: HGP, 2018, 170,000 fired hours, interval 25,500 h
- Remaining life to next intervention: following the last outages on each machine, approximately 24,000 operating hours remain before the next scheduled maintenance action is required.
- A purchaser acquiring the plant for relocation therefore takes delivery of machines with a substantial maintenance interval already paid for.
- Section 07 – Sale Process
- The plant is offered on an as-is, where-is basis.
- Offers will be considered for the complete plant as well as for major sub-packages, including the gas turbine trains, the steam turbine island and the heat recovery steam generators.
- Information Released Under NDA
- Site layout and access / logistics assessment.
- Nameplate data and OEM correspondence.
- Electrical single-line diagram and transformer nameplate data.
- Full outage and inspection reports, borescope findings and rotor life assessments.
- Spare parts inventory list with valuation.
- Performance test records and heat rate curves.
- Inspection arrangements.
- Indicative Process
- Expression of interest – buyer confirms interest, intended use (relocation or continued operation) and target destination market.
- NDA execution – mutual non-disclosure agreement signed; identifying information and the technical data room released.
- Technical review – buyer reviews maintenance history, spare parts list and performance records; technical Q&A with the engineers.
- Inspection – physical inspection of the plant, including borescope inspection of the gas turbines if required.
- Offer & negotiation – binding offer, agreement of commercial terms, dismantling and transport responsibilities.