Siemens, SGT5-2000E, Combined Cycle Power Plant, 245 MW, Natural Gas, 50 Hz, Zero Hours

Description

  1. Overview
    1. Siemens SGT5-2000E combined cycle power plant
    2. Approximately 245 MW per plant
    3. The equipment was supplied for a combined-cycle power plant project; however, installation was never completed and commissioning never took place.
    4. The gas turbine has zero firing hours.
    5. The equipment is currently stored in a dedicated storage facility, with some major components remaining in their original factory crates.
  2. Plant Configuration
    1. Gas turbine generator: Siemens SGT5-2000E (V94.2), approximately 165 MW
    2. Steam turbine generator: approximately 80 MW
    3. Total nominal gross capacity: approximately 245 MW per plant
    4. Fuel: natural gas
    5. Frequency: 50 Hz
    6. Gas turbine firing hours: zero
  3. Scope Of Supply
    1. The scope includes the major equipment and associated auxiliary systems required for the combined-cycle plant, including:
    2. Siemens SGT5-2000E gas turbine and generator
    3. Steam turbine and generator
    4. HRSG system
    5. Turbine auxiliary systems
    6. Cooling systems
    7. Lubrication systems
    8. Water treatment systems
    9. Transformers and electrical equipment
    10. Central control system
    11. High- and low-voltage cabinets
    12. MCC systems
    13. Fire-fighting systems
    14. HV auxiliary equipment
    15. Chimney/stack system
    16. Associated piping and auxiliary equipment
  4. Condition
    1. Gas turbine firing hours: zero
    2. Status: supplied / uninstalled / never commissioned
    3. Storage: dedicated storage facility
    4. Packaging: some major components remain in original factory crates
    5. Inspection: available for qualified and serious buyers
  5. Specifications
    1. Steam turbine generator: Approx. 80 MW