Description Overview Siemens SGT5-2000E combined cycle power plant Approximately 245 MW per plant The equipment was supplied for a combined-cycle power plant project; however, installation was never completed and commissioning never took place. The gas turbine has zero firing hours. The equipment is currently stored in a dedicated storage facility, with some major components remaining in their original factory crates. Plant Configuration Gas turbine generator: Siemens SGT5-2000E (V94.2), approximately 165 MW Steam turbine generator: approximately 80 MW Total nominal gross capacity: approximately 245 MW per plant Fuel: natural gas Frequency: 50 Hz Gas turbine firing hours: zero Scope Of Supply The scope includes the major equipment and associated auxiliary systems required for the combined-cycle plant, including: Siemens SGT5-2000E gas turbine and generator Steam turbine and generator HRSG system Turbine auxiliary systems Cooling systems Lubrication systems Water treatment systems Transformers and electrical equipment Central control system High- and low-voltage cabinets MCC systems Fire-fighting systems HV auxiliary equipment Chimney/stack system Associated piping and auxiliary equipment Condition Gas turbine firing hours: zero Status: supplied / uninstalled / never commissioned Storage: dedicated storage facility Packaging: some major components remain in original factory crates Inspection: available for qualified and serious buyers Specifications Steam turbine generator: Approx. 80 MW