NSC Schlumberger, GN5 and FM5, Semi-Worsted Preparation Line, 3 Gill Box Passages with Autoleveller, 12-Position Finisher

Description

  1. Overview
    1. NSC Schlumberger long-fiber semi-worsted preparation line: 3 GN5 gill box passages and 1 FM5 finisher
  2. 1st Passage: NSC Schlumberger GN5 with Autoleveller
    1. Feed in tops or bumps
    2. Automatic output in tops
    3. Continuous spinning oil spraying system
  3. 2nd Passage: NSC Schlumberger GN5
    1. Feed in tops
    2. Automatic rotating output in cans
  4. 3rd Passage: NSC Schlumberger GN5
    1. Feed in cans
    2. Output in 2 cans
  5. Finisher: NSC Schlumberger FM5
    1. 12 positions
    2. Infrared roving break sensors
    3. Optical rubbing break sensors
  6. Included
    1. Suction system integrated in all 3 gill box passages
    2. Ample number of cans for the 2nd and 3rd passages
    3. Gears and various spare parts
    4. Original technical manuals
  7. Also Available
    1. From the same complete semi-worsted spinning line: V-3332 Gaudino FPK/350.8C ring spinning frame and V-3331 Schlafhorst Autoconer 338 winder