Solar Turbines, Taurus 70, 2021, Gas Turbine Generator Set, 7.9 MW, 11 kV, 50 Hz, Dual Fuel, 59 Hours

Description

  1. Overview
    1. Solar Turbines Taurus 70 gas turbine generator package, manufactured 2021, commissioned 2022
    2. Listed as new, 59 running hours
    3. Dual fuel: pipeline natural gas and distillate diesel
    4. Available and ready for inspection
  2. Specifications
    1. Power output: 7.9 MW
    2. Voltage: 11 kV
    3. Frequency: 50 Hz
    4. Generator: Leroy-Somer LSA 56 BMDL145/4P, 3-phase
    5. Operating regime: continuous operation on natural gas with automatic diesel backup
    6. Fuel transfer: automatic transient transfer and manual bidirectional changeover
  3. Maintenance and Modifications
    1. Level B maintenance completed January 2026, including borescope inspection, filter checks and water wash
    2. Slow roll modification
    3. kg/hr fuel tracking
    4. Injector gasket replacement
  4. Documentation
    1. Technical pack, inspection records and shipping options available on request