General Electric, TM2500 Gen 8, 2016, Dual Fuel, Dual Frequency, Mobile Gas Turbine Generator Sets

Description

  1. Overview
    1. Four GE TM2500 Gen 8 dual fuel / dual frequency units
    2. Manufactured in 2016, commissioned in July 2019
    3. Borescope performed in 2025 on each unit; scope of supply available
  2. Specifications
    1. Model: TM2500
    2. Manufacturing year: 2016
    3. Date of operation: July 2019
    4. Current running hours: GT1: 27,241; GT2: 33,615; GT3: 22,777; GT4: 29,444
    5. HSE maintenance at running hours: GT1: 24,766; GT2: 31,000; GT3: 20,022; GT4: 26,875
    6. Hours since last HSE maintenance: GT1: 2,475; GT2: 2,615; GT3: 2,755; GT4: 2,569
    7. Capacity: approx 30 MW each
  3. Condition
    1. Used with approximately 28,000 hours average runtime
    2. Borescope completed in 2025 on each unit
  4. Included Equipment
    1. Four TM2500 Gen 8 units including auxiliaries and all general electric-supplied equipment
    2. Engineering drawings, manuals, maintenance records, and logbooks
    3. General electric and third-party spare parts, consumables, and tooling
    4. Steel stairs for access to the control room and trailers
  5. Preparation for Shipment
    1. Disassembly, removal of fluids, making ready for shipment, packing, and transport to export port