TT-6239 SIEMENS SGT 600 TURBINE, DLE, YEAR 2011, 25 MW, 10.5 KV, 50 Hz
MAINTENANCE RECORD:
A-THE MAINTENANCE MAINLY INVOLVES PASSING HOT AIR FROM THE DRYER TO THE COMBUSTION CHAMBER. WE HAVE PREVIOUSLY TRIED TURNING THE DRYER. DESICCANT IS PLACED INSIDE THE STEAM DRUM OF THE WASTE HEAT BOILER.
B-THE LAST RUN WAS IN DECEMBER 2017, AND IT WAS STARTED EVERY THREE MONTHS FOR ABOUT A YEAR. FINALLY, WE COMMUNICATED WITH SIEMENS TO ADOPT A LONG-TERM MAINTENANCE METHOD, SO WE DID NOT ATTEMPT TO IGNITE AGAIN.
IMMEDIATE DELIVERY
Learn More
YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2
ITEM 001
2500 HOURS AFTER ENGINE OVERHAUL
ITEM 002
6500 HOURS AFTER ENGINE OVERHAUL
Learn More