Search results for: 'tur'
- Related search terms
- turbine T
- turbin plant
- turbine generator plant
- Turbine solar
- TURBINE hy
-
TT-1030 DRESSER RAND KG2-3R GAS TURBINE, 1043 KW, YEAR 1999TT-1030 DRESSER RAND KG2-3R GAS TURBINE, 1043 KW, YEAR 1999 VOLTAGE: 6600 V POWERRATING: 2025 KVA FUEL: NATURAL GAS QUANTITY: 1 Learn More -
TT-7948 LM2500/1600/6000 GAS TURBINE PARTS: PROCESS EQUIPMENT AND PIPING, YEAR 2025TT-7948 LM2500/1600/6000 GAS TURBINE PARTS: PROCESS EQUIPMENT AND PIPING, YEAR 2025 CONDITION: NEW Learn More -
TT-7747 ROLLS ROYCE CENTRAX 501 KB7 GAS TURBINE, 5 MW, YEAR 2006TT-7747 ROLLS ROYCE CENTRAX 501 KB7 GAS TURBINE, 5 MW, YEAR 2006 CONDITION USED QUANTITY: 1 Learn More -
TT-7465 SOLAR TAURUS T-70 GAS TURBINE PACKAGE, 7.1MW, 60HzTT-7465 SOLAR TAURUS T-70 GAS TURBINE PACKAGE, 7.1MW, 60Hz QUANTITY: 1 Learn More -
TT-7464 SOLAR TAURUS T 65 GAS TURBINES, YEAR 2022, 50HzTT-7464 SOLAR TAURUS T 65 GAS TURBINES, YEAR 2022, 50Hz 1. BRAND SOLAR 2. MODEL TAURUS 3. TYPE GAS TURBINES 4. CONDITION USED QUANTITY: 1 Learn More -
YY-3509 SOLAR MARS 100 GAS TURBINE ENGINEYY-3509 SOLAR MARS 100 GAS TURBINE ENGINE THIS UNIT HAS BEEN COMPLETELY OVERHAULED TO ZERO HOURS, AND IT HAS BEEN CERTIFIED IN A DESIGNATED TESTING FACILITY. QUANTITY: 1 Learn More -
TT-6694 GE LM6000PA GAS TURBINE - COMPLETE PACKAGE, 43MW, 50 Hz, YEAR 1994TT-6694 GE LM6000PA GAS TURBINE - COMPLETE PACKAGE, 43MW, 50 Hz, YEAR 1994 1. GE LM6000PA GAS TURBINE 2. MODEL LM 6000 PA 3. YEAR: 1994 4. HOURS: 16004 QUANTITY: 1 Learn More -
TT-6471 SOLAR TAURUS 70 GAS TURBINES, 7200KW, YEAR 2003, 50Hz – SINGLE SHAFTTT-6471 SOLAR TAURUS 70 GAS TURBINES, 7200KW, YEAR 2003, 50Hz – SINGLE SHAFT 1. SOLAR TAURUS 70 GAS TURBINES 2. YEAR: 2003 QUANTITY: 1 Learn More -
TT-6412 SOLAR TITAN 130 GAS TURBINE GENERATOR SET, YEAR 2012, 50/60 HzTT-6412 SOLAR TITAN 130 GAS TURBINE GENERATOR SET, YEAR 2012, 50/60 Hz 1. SOLAR TITAN T-130 GAS TURBINE GENERATION PACKAGE 2. BRAND SOLAR 3. YEAR 2012 4. 60 Hz (CAN CONVERT TO 50 Hz) QUANTITY: 1 Learn More -
TT-6239 SIEMENS SGT 600 TURBINE, DLE, YEAR 2011, 25 MW, 10.5 KV, 50 HzTT-6239 SIEMENS SGT 600 TURBINE, DLE, YEAR 2011, 25 MW, 10.5 KV, 50 Hz MAINTENANCE RECORD: A-THE MAINTENANCE MAINLY INVOLVES PASSING HOT AIR FROM THE DRYER TO THE COMBUSTION CHAMBER. WE HAVE PREVIOUSLY TRIED TURNING THE DRYER. DESICCANT IS PLACED INSIDE THE STEAM DRUM OF THE WASTE HEAT BOILER. B-THE LAST RUN WAS IN DECEMBER 2017, AND IT WAS STARTED EVERY THREE MONTHS FOR ABOUT A YEAR. FINALLY, WE COMMUNICATED WITH SIEMENS TO ADOPT A LONG-TERM MAINTENANCE METHOD, SO WE DID NOT ATTEMPT TO IGNITE AGAIN. IMMEDIATE DELIVERY Learn More