Search results for: 'a-2'
- Related search terms
- a-2500
- A-250
- A-26
- A-2609
- a-2)','.)).)(
- K-2554 CATERPILLAR COMPLETE POWER PLANT 6.5MW YEAR 2005
K-2554 CATERPILLAR COMPLETE POWER PLANT 6.5MW YEAR 2005
6.5MW
11KV
INCLUDING STEAM BOILER WITH 12 BARS AND 2.9 T/H
NATURAL GAS FUEL
YEAR 2005
50 HZ
EXCELLENT CONDITIONQUANTITY: 2
Learn More - K-2544 COMPLETE POWER PLANT 46MW YEAR 2000
K-2544 COMPLETE POWER PLANT 46MW YEAR 2000
SIEMENS TYPHOON AND ALSTOM
5 GAS TURBINE PACKAGES
1 STEAM TURBINE
BOILER AND AUXILIARIES
NATURAL GAS AND NAPHTA
46 MW
YEAR 2000-LOW HOURS
50 HZQUANTITY: 1
Learn More - M-5238 HFO POWER PLANTS (6MW EACH, TOTAL 24MW) YEAR 2008 – NEW (NEVER USED)REFERENCE NUMBER: M-5238 (1313AJWNXX12U) L HFO POWER PLANTS (6MW EACH, TOTAL 24MW) YEAR 2008 – NEW (NEVER USED) HFO POWER PLANTS 6MW EACH TOTALLING 24MW YEAR 2008 WITH 50HZ NEW (NEVER USED) QUANTITY AVAILABLE: 4 Learn More
- K-8185 GE JENBACHER TYPE JMS 620 GS YEAR 2000
K-8185 GE JENBACHER TYPE JMS 620 GS YEAR 2000
MANUFACTURER: GE JENBACHER
TYPE: JMS 620 GS E OS
WITH STAMFORD LVSI 814 HS
400V
50HZ
COS 0.8
YEAR: 2000
NATURAL GAS: 3.041KW EL
HOURS SINCE NEW: 41,000 INCLUDE THE LAST OVERHAUL AT 32,000 HOURS NEW LINERS AND PISTONS AND NEW DIANE CONTROL SYSTEM
INCLUDING:
ENGINE
GENERATOR
ELECTRONIC BOXES
DOCUMENTATION
CABEL
PLC
PIPINGQUANTITY: 1 UNIT
Learn More - K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
MANUFACTURER: ESCHER WYSS
TYPE: 135-200
POWER ELECTRICAL: 3.0 MW
PRESSURE/TEMP.: 60 BAR/400°C
BACK PRESSURE: 11 BAR
YEAR OF MANUFACTURER: 1964
CONDITION: GOOD
VOLTAGE: 11 KV/50 HZ
SCOPE OF SUPPLY:
TURBINE AND GENERATOR,PIPING AND ELECTR. BOXESQUANTITY: 1
Learn More - K-2919 MAN-BHKW COMPLETE MODULES 500KW YEAR 2009
K-2919 MAN-BHKW COMPLETE MODULES 500KW YEAR 2009
ELECTRICAL POWER 500 KW
THERM. POWER 400 KW
FUEL: BIO OIL AND DIESEL
YEAR2009
ONLY BETWEEN 6000 AND 9000 HOURS
INCLUDING ELECTRICAL BOXES
HEAT EXCHANGER
CATALYSATORS
11 KV / 50 HZQUANTITY: 8
Learn More - K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
YEAR 1999
25 T/H
25 BAR
GERMAN RATES UNDER 150ppm NOX AND CO
SIEMENS CONTROL
ECO: 19 TO
BOILER BORE: 3.50M
BOILER LENGTH: 6.70M
WEIGHT: 60
INSUALATION: 200mm V2A III D
TURBINE EXHAUST GASES AND NATURAL GAS WITH EXTRA BURNERQUANTITY: 1
Learn More - SOLAR PANEL PRODUCTION PLANT, 80 MW, YEAR 2008REFERENCE NUMBER: T-6946 SOLAR PANEL PRODUCTION PLANT, 80 MW, YEAR 2008 SOLAR PANEL PRODUCTION PLANT 80 MW OUTPUT CAPACITY PER YEAR THIN FILM SOLAR PANELS AMAT PECVD SYSTEM MODEL "NEW ARISTO" (VERTICAL SPUTTER WITH 14 CHAMBERS) INCLUDING ROBOT HANDLING, CONVEYORS, ATON 1600, ETC. STILL INSTALLED, USED QUANTITY: 1 Learn More
- R-9389 GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGES
REFERENCE NUMBER: R-9389
GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGES
GE 7EA GAS TURBINE GENERATOR PACKAGES
85MW ISO EACH ON NATURAL GAS
THEY ARE IN STORAGE RIGHT NOW
OWNER HAD THEM SHIPPED BACK TO THE USA ABOUT A YEAR AGO.
THEY ARE UNUSED (NEVER FIRED) AND WERE BUILT IN 2008 BY GENERAL ELECTRIC
GE 7EA (PG7121) DUAL LIQUID FUEL TURBINES
HEAT RATE: 10,430 BTU/KWH
OUTPUT: 85MW ISO ON NATURAL GAS
CURRENTLY DUAL LIQUID FUEL- CRUDE (PRIMARY FUEL) AND DISTILLATE (BACK UP)
QUANTITY: 2
Learn More - K-8157 COAL FIRED POWER PLANT (2 X 50MW)
K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More