Search results for: 'combine'
- Related search terms
- combined+o
- combined cycle
- COMBINED+CYCLE+COMPLETE+POWER+PLANT
- Combine date
- Combines
-
TT-6646 MERCEDES COMBINED HEAT AND POWER PLANT (CHP), YEAR 2007TT-6646 MERCEDES COMBINED HEAT AND POWER PLANT (CHP), YEAR 2007 BRAND: MERCEDES CONDITION: USED QUANTITY: 1 Learn More -
TT-5601 JENBACHER 612 GS F01 COMBINED HEAT AND POWER PLANT, 2,000 KW, YEAR 2008, 50 HzTT-5601 JENBACHER 612 GS F01 COMBINED HEAT AND POWER PLANT, 2,000 KW, YEAR 2008, 50 Hz JENBACHER J612 GS F01 GAS GENERATORS YEAR OF CONSTRUCTION 2008 CONDITION USED MACHINE TYPE: COMBINED HEAT AND POWER PLANT BRAND: JENBACHER MODEL: 612 GS F01 CONDITION: READY FOR OPERATION (USED) QUANTITY: 1 Learn More -
TT-3043 GE LM 6000 PB DLE 53 MW COMBINED CYCLE, 40 MW GT AND 13 MW SIEMENS STG, 50 Hz, YEAR 1994, NATURAL GASTT-3043 GE LM 6000 PB DLE 53 MW COMBINED CYCLE, 40 MW GT AND 13 MW SIEMENS STG, 50 Hz, YEAR 1994, NATURAL GAS QUANTITY: 1 Learn More -
TT-3042 GE FRAME 6 FA COMBINED CYCLE PLANT, 225 MW, 50 Hz, NATURAL GAS FUEL, YEAR 2011TT-3042 GE FRAME 6 FA COMBINED CYCLE PLANT, 225 MW, 50 Hz, NATURAL GAS FUEL, YEAR 2011 QUANTITY: 1 Learn More -
YY-2180 TEMPERATURE HUMIDITY VIBRATION COMBINED CLIMATIC CHAMBER, TEMPERATURE RANGE -70°C ~ 150°CYY-2180 TEMPERATURE HUMIDITY VIBRATION COMBINED CLIMATIC CHAMBER, TEMPERATURE RANGE -70°C ~ 150°C DETAILS: THIS MACHINE COMPLIES WITH NATIONAL STANDARD, IS ABLE TO SATISFY TESTING REQUIREMENTS, AND IS WIDELY APPLIED FOR ELECTRONIC AND ELECTRIC PRODUCTS, AUTOMOTIVE PARTS, COMPONENTS AND MATERIALS BY HIGH LOW CONSTANT TEMPERATURE, TEMPERATURE CHANGES, SHOCKS, DAMP HEAT VIBRATION ETC. COMBINED ENVIRONMENT SIMULATION RELIABILITY TESTS. QUANTITY: 1 Learn More -
TT-8299 GE LM6000 PA COMBINE CYCLE POWER PLANT, 40 MW, NATURAL GAS, YEAR 1996, 50 HzTT-8299 GE LM6000 PA COMBINE CYCLE POWER PLANT, 40 MW, NATURAL GAS, YEAR 1996, 50 Hz 1. BRAND GE 2. MODEL LM6000 PA QUANTITY: 1 Learn More -
YY-2918 USED GE 388 MW (ISO) COMBINED CYCLE POWER PLANTYY-2918 USED GE 388 MW (ISO) COMBINED CYCLE POWER PLANT Learn More -
V-2157 SIEMENS SGT 400 COMBINED HEAT AND POWER (CHP) UNIT, YEAR 2017, PRODUCING 12.9 MW (ISO)V-2157 SIEMENS SGT 400 COMBINED HEAT AND POWER (CHP) UNIT, YEAR 2017, PRODUCING 12.9 MW (ISO), 11KV, 50HZ INSTALLED IN PLACE NOW (ONE TURBINE GENERATOR) WITH WASTE HEAT STEAM BOILER FIRE TUBE TYPE AND ECONOMIZER, OPTIMIZED FOR 16 TONS PER HOUR OF SATURATED STEAM PRODUCTION (PROCESS STEAM THAT CAN BE USED FOR DRYING PRODUCTS) INCLUDES SCADA SYSTEM AND VALMET SYSTEM DNA DCS Learn More -
K-8177 GAS TURBINES, COMBINED CYCLE POWER PLANTS, DIESEL & GAS ENGINESK-8177 GAS TURBINES, COMBINED CYCLE POWER PLANTS, DIESEL & GAS ENGINES
Learn More -
K-2543 COMBINED CYCLE POWER PLANT 40MW YEAR 1992K-2543 COMBINED CYCLE POWER PLANT 40MW YEAR 1992
GE FRAME 6B, DRY LOW NOX
NATURAL GAS AND LIGHT OIL
40 MW
YEAR 1992-RECENTLY RECONDITIONED
50 HZQUANTITY: 1
Learn More