Search results for: 'General'
- Related search terms
- GENERAL ELECTRIC LM2500G4
- general electric lm2500 gas turbine engines
- General electric 12.5
- General electric 12.5 MW
- General electric 12.5 MW 100
- TT-5958 GENERAL ELECTRIC LM6000PA 4TH, 43MW, 20000 HOURS, 50Hz, YEAR 1995TT-5958 GENERAL ELECTRIC LM6000PA 4TH, 43MW, 20000 HOURS, 50Hz, YEAR 1995 GENERAL ELECTRIC LM6000PA 4TH YEAR: 1995 HOURS: 20000 QUANTITY: 1 Learn More
- TT-5888 GENERAL ELECTRIC LM2500, 11KV, 35.5MW, 50Hz, 100 HOURS, YEAR 2013TT-5888 GENERAL ELECTRIC LM2500, 11KV, 35.5MW, 50Hz, 100 HOURS, YEAR 2013 QUANTITY: 1 Learn More
- TT-5886 GENERAL ELECTRIC LM2500, 31.5MW, 2000 HOURS, 50Hz, YEAR 2013TT-5886 GENERAL ELECTRIC LM2500, 31.5MW, 2000 HOURS, 50Hz, YEAR 2013 QUANTITY: 1 Learn More
- TT-5584 GENERAL ELECTRIC LM6000PA GAS TURBINE, 43 MW, 50 HzTT-5584 GENERAL ELECTRIC LM6000PA GAS TURBINE, 43 MW, 50 Hz QUANTITY: 3 Learn More
- TT-5563 GENERAL ELECTRIC LM6000PA, 43MW, YEAR 1994 TO 1995, 50HzTT-5563 GENERAL ELECTRIC LM6000PA, 43MW, YEAR 1994 TO 1995, 50Hz GENERAL ELECTRIC LM6000PA YEAR: 1994 TO 1995 HOURS: 16000 TO 20000 FUEL: NATURAL GAS VOLTAGE: 11000 FREQUENCY: 50Hz SPEED: 3000RPM EACH UNIT POWER: 43MW WITH TWO BOILER WITH TWO STEAM TURBINE EACH UNIT POWER OF STEAM TURBINE: 12MW QUANTITY: 4 Learn More
- TT-5533 GENERAL ELECTRIC GAS TURBINE, LM6000PA, 43MW, YEAR 1993 TO 1995, 50HzTT-5533 GENERAL ELECTRIC GAS TURBINE, LM6000PA, 43MW, YEAR 1993 TO 1995, 50Hz Learn More
- TT-4529 GENERAL ELECTRIC TURBINE GENERATOR – NEW, NATURAL GAS, 90MW, 60Hz, 7EA + HRSG COGENERATION PLANT, YEAR 2015TT-4529 GENERAL ELECTRIC TURBINE GENERATOR – NEW, NATURAL GAS, 90MW, 60Hz, 7EA + HRSG COGENERATION PLANT, YEAR 2015 EQUIPMENT OVERVIEW NEW / NEVER-USED SURPLUS MANUFACTURED IN 2015 GE 71 EA 91.95 MW NATURAL GAS TURBINE GE 7A6 121000 KVA 60 Hz 13000 V AIR-COOLED GENERATOR COMPLETE WITH ACCESSORY BASE AND ANCILLARY EQUIPMENT OPTIONALLY AVAILABLE HEAT RECOVERY STEAM GENERATOR (HRSG) AND ANCILLARY EQUIPMENT CRATED AND PRESERVED TO OEM SCHEDULE IN CLIMATE CONTROLLED WAREHOUSES Learn More
- V-2170 GENERAL ELECTRIC (GE) STEAM TURBINE 615MW FOR PRODUCING ELECTRICITY STEAM TURBINE ONLY IS BEING OFFERED FOR SALEV-2170 GENERAL ELECTRIC (GE) STEAM TURBINE 615MW FOR PRODUCING ELECTRICITY STEAM TURBINE ONLY IS BEING OFFERED FOR SALE UNIT DETAILS: TURBINE SERIAL NUMBER: 270T764 GENERATOR SERIAL NUMBER: 290T764 RPM: 3600 TURBINE: DESIGN CODE: G12 CONTROL SYSTEM: MARK VI STAGES: 22 LSB LENGTH: 30” INITIAL STEAM TEMPERATURE: 1050F INITIAL STEAM PRESSURE: 3,515 PSIA EXHAUST PRESSURE: 3.45 HGA GENERATOR: CODE: L2D RATING: 750,000 KVA VOLTAGE: 21,000 POWER FACTOR: .9 AMPS: 20,620 EXCITER RATING/VOLTS: 605 AMOUNT OF STEAM NEEDED: 4,200,000 TONS PER HOUR, 3500 PSI YEAR OF THE MACHINE: MANUFACTURED BETWEEN 2009 AND 2016 (IT TAKES 5 TO 6 YEARS TO PRODUCE IT) TYPE OF STEAM TURBINE: IS IT A BACK PRESSURE OR EXTRACTION STEAM TURBINE TO PRODUCE LOW PRESSURE AND MEDIUM PRESSURE STEAM? [ANSWER] LOW AND MEDIUM STEAM PRESSURES IN PSI: [ANSWER] AMOUNT OF STEAM AVAILABLE FROM EACH PRESSURE LEVEL (IN POUNDS OR TONS): [ANSWER] SHIPPING DIMENSIONS: IT WILL OCCUPY A BULK SPACE FOR APPROXIMATELY 2500 TONS WEIGHT. IN ESSENCE, 25,000 TON SHIP NEEDS TO BE ENGAGED AND MOVING. QUANTITY: 1 Learn More
- TT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50HzTT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50Hz WE OFFER TWO TURBINES AND GENERATOR ALONE OR THE TURBINE ALONE, GENERATION 2 QUANTITY: 2 Learn More
- TT-4060 GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT AND BOILER, 22MW, YEAR 2022, 5000 HOURSTT-4060 GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT AND BOILER, 22MW, YEAR 2022, 5000 HOURS LM2500 SINGLE SHANK 22MW QUANTITY: 1 Learn More