Search results for: 'steam b'
- Related search terms
- steam e
- steam electri
- steam electric
- steam machin
- steam 2
- K-3429 FOSTER AND WHEELER STEAM BOILERS A 100 T/ H AND 46.4 BAR YEAR 2005
K-3429 FOSTER AND WHEELER STEAM BOILERS A 100 T/ H AND 46.4 BAR YEAR 2005
MAKE: FOSTER AND WHEELER
YEAR 2005
2 X 100 TONS/H, 39 BAR WORKING PRESSURE AT 385C. DESIGNED PRESSURE IS 46.5 BAR
EMPTY WEIGHT 97 TONS
FURNACE VOLUME 104M3
HEATING FURNACE AREA 1125M2
ALL ACCESORIES INCLUDED
87% EFFICIENCY, FUEL OIL AND NATURAL GAS FIREDQUANTITY: 2
Learn More - R-1709 BIELLA CONTINIOUS STEAMING SHRINKING MACHINE, CYLINDER WIDTH 1900mm, YEAR 2002
R-1709 BIELLA CONTINIOUS STEAMING SHRINKING MACHINE, CYLINDER WIDTH 1900mm, YEAR 2002
BIELLA CONTINIOUS STEAMING SHRINKING MACHINE
TYPE: ECOVAP 95
YEAR: 2002
CYLINDER WIDTH: 1900mm
MACHINE WITH IGROFAST SYSTEM
AND CARBON BRUSH BUILDED IN
IGROFAST DRASTICALLY REDUCE USED STEAM QUANTITY
VIBRO SHRUNK WITH HUMIDIFIER ECOVAP KD
SUCTION AND FANS (VENTILATORS) INCLUDED
STATUS: WORKING, STOPPED ON MILL FLOOR
CONDITIONS: EXCELLENTQUANTITY: 1
Learn More - K-8157 COAL FIRED POWER PLANT (2 X 50MW)
K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More - TT-4593 VIESSMANN STEAM BOILER, CAPACITY 10 TON PER HOUR, YEAR 2014TT-4593 VIESSMANN STEAM BOILER, CAPACITY 10 TON PER HOUR, YEAR 2014 QUANTITY: 1 Learn More
- YY-2471 5.5 MW, TAURUS T-60 NATURAL GAS TURBINE GENERATOR SET INCLUDING HRSG (STEAM BOILER) AND WHRU (WASTE HEAT RECOVERY), OUTPUT VOLTAGES AVAILABLE 380/415/460/575 (CAN BE 50 OR 60 Hz)YY-2471 5.5 MW, TAURUS T-60 NATURAL GAS TURBINE GENERATOR SET INCLUDING HRSG (STEAM BOILER) AND WHRU (WASTE HEAT RECOVERY), OUTPUT VOLTAGES AVAILABLE 380/415/460/575 (CAN BE 50 OR 60 Hz) QUANTITY: 1 Learn More
- K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
MANUFACTURER: ESCHER WYSS
TYPE: 135-200
POWER ELECTRICAL: 3.0 MW
PRESSURE/TEMP.: 60 BAR/400°C
BACK PRESSURE: 11 BAR
YEAR OF MANUFACTURER: 1964
CONDITION: GOOD
VOLTAGE: 11 KV/50 HZ
SCOPE OF SUPPLY:
TURBINE AND GENERATOR,PIPING AND ELECTR. BOXESQUANTITY: 1
Learn More - K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
YEAR 1999
25 T/H
25 BAR
GERMAN RATES UNDER 150ppm NOX AND CO
SIEMENS CONTROL
ECO: 19 TO
BOILER BORE: 3.50M
BOILER LENGTH: 6.70M
WEIGHT: 60
INSUALATION: 200mm V2A III D
TURBINE EXHAUST GASES AND NATURAL GAS WITH EXTRA BURNERQUANTITY: 1
Learn More - K-2577 BBC CONDENSING AND EXTRACTION STEAM TURBINE POWER PLANT 8.5MW YEAR 1975
K-2577 BBC CONDENSING AND EXTRACTION STEAM TURBINE POWER PLANT 8.5MW YEAR 1975
8.5 MW
40 BAR
390 ˚ C
YEAR 1975QUANTITY: 1
Learn More - TT-7585 SIEMENS SST-300 STEAM TURBINE - NEW, YEAR 2021, 50 HzTT-7585 SIEMENS SST-300 STEAM TURBINE - NEW, YEAR 2021, 50 Hz 1. BRAND NEW STEAM TURBINE SIEMENS SST-300 - IN FACTORY 2. PACKING FROM THE YEAR 2021 3. THIS TURBINE HAS NEVER BEEN INSTALLED AND AVAILABLE 4. WITH ALL ITS EQUIPMENT AND ACCESSORIES 5. STORED IN WAREHOUSE SECURELY, IN GOOD ENVIRONMENT. Learn More