Search results for: 'steam+turb'
- Related search terms
- steam+turbin
- steam+turbin',(;))#-+--
- Steam+Turbine+generat
- steam+turbi
- Steam+Turbine+generator
-
TT-6338 COMPLETE PULP MILL SOLD IN SECTIONS-PARTS, CAPACITY 350,000 TPYTT-6338 COMPLETE PULP MILL SOLD IN SECTIONS-PARTS, CAPACITY 350,000 TPY 1. IN GOOD WORKING CONDITION 2. STOPPED 2023 3. EQUIPMENT NOT AVAILABLE FOR LONG 4. COMPLETE PULP MILL. Learn More -
M-4010 10 MW BIOGAS TO STEAM CONGENERATION PLANT – 10 MEGAWATTSREFERENCE NUMBER: M-4010
10 MW BIOGAS TO STEAM CONGENERATION PLANT – 10 MEGAWATTS
10 MW BIOGAS-FIRED COGENERATION PLANT
LATE MODEL, EXCELLENT CONDITION
INCLUDES BOILER, STEAM TURBINE, GENERATOR AND CONDENSER
CAPABLE OF CONVERTING METHANE, LANDFILL GAS, BIOGAS OR NATURAL GAS INTO ELECTRICITY
COMPLETE WITH ALL SUPPORT EQUIPMENT, INCLUDING PUMPS, WATER SYSTEMS, BLOWERS, ETC.
COMPLETE CONTROL ROOM AVAILABLE WITH OPERATIONAL CONTROL PANELS FEATURING CONTROLS BY PANALARM, FOXBORO, BENTLY NEVADA AND BASLER
STARTERS AND SWITCH GEAR BY SIEMENS
BOILER:
125,000 LBS/HR @ 725 PSI DELTAK FIRE TUBE STEAM BOILER
16,189 SQ. FT. HEATING SURFACE
STEAM TURBINE:
101,000 LBS/HR @ 600 PSI TERRY MULTI-STAGE CONDENSING STEAM TURBINE
INCLUDES WOODWARD GOVERNOR AND TACKE GEAR REDUCER
GENERATOR:
10,200 KW IDEAL ELECTRIC
1,800 RPM, 60 HZ
INCLUDES BRUSHLESS EXCITER
CONDENSER:
7,809 SQ. FT. GRAHAM SHELL AND TUBE HEAT EXCHANGER
CS AND ADMIRALTY BRASS CONSTRUCTION
88,100 LBS/HR EXHAUST
86 MM BTU/HR DUTY
Learn More -
TT-1676 SIEMENS SGT-100 TYPHOON GAS TURBINE, YEAR 1994, 4.4 MW AT 11,000 VOLTS, 50 HzTT-1676 SIEMENS SGT-100 TYPHOON GAS TURBINE, YEAR 1994, 4.4 MW AT 11,000 VOLTS, 50 Hz SIEMENS SGT-100 TYPHOON GAS TURBINE YEAR: 1994 MACHINE TYPE: GAS TURBINE PACKAGE BRAND: SIEMENS MODEL: SGT-100 TYPHOON GAS TURBINE 50 Hz CONDITION: GOOD CONDITION (USED) QUANTITY: 1 Learn More -
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More -
M-4798 POWER PLANT 35,000KW YEAR 2008REFERENCE NUMBER: M-4798 (1111BBTLXX10) L POWER PLANT 35,000KW YEAR 2008 POWER PLANT, 35,000KW INCLUDES GENERAL ELECTRIC CONDENSING STEAM TURBINE BRUSH SYNCHRONOUS GENERATOR AIR COOLED CONDENSER SWITCHGEAR TRANSFORMERS CRANE & BUILDING YEAR 2008, UNUSED, 1 LOT QUANTITY AVAILABLE: 1 Learn More -
J-5082 7 SIEMENS SGT 800 UNITS, TOTALING 400 MW, 60 Hz – PACKAGE DEAL ONLY TOTAL: 400 MEGAWATTSJ-5082 7 SIEMENS SGT 800 UNITS, TOTALING 400 MW, 60 Hz – PACKAGE DEAL ONLY TOTAL: 400 MEGAWATTS MAKE: SIEMENS MODEL: SGT 800 TOTALLING 400 MW @ 60 Hz 6 UNITS ARE HRSG UNITS 1 UNIT 64 MW @ 60 Hz EX STOCK THESE ARE BRAND NEW UNITS, WARRANTY TRANSFERRABLE MUST BE SOLD AS A PACKAGE ONLY, NOT AVAILABLE INDIVIDUALLY PACKAGE IS COMPLETE WITH CONTROL SYSTEMS, ETC. QUANTITY: 7 Learn More -
YY-2884 LM 6000 PB COMBINED CYCLE PLANTYY-2884 LM 6000 PB COMBINED CYCLE PLANT ASK FOR MORE DETAILS! Learn More -
TT-6648 NATURAL GAS COGENERATION PLANT, 40 MEGAWATTSTT-6648 NATURAL GAS COGENERATION PLANT, 40 MEGAWATTS Learn More -
TT-5150 ALSTOM GAS TURBINE WITH GENERATOR, 300MW, 50 HzTT-5150 ALSTOM GAS TURBINE WITH GENERATOR, 300MW, 50 Hz 300 MW GAS TURBINE 50 Hz GAS TURBINE WITH GENERATOR GEARBOX: GT13E2, DUAL FUEL, 5 ALSTOM STAGE, 148.85MW GENERATOR: 50WY21Z-078 WITH STATIC EXCITATION ALSTOM/ZUILEMAE RB FUEL GAS STARTING SYSTEM ALSTOM/ALLWEILER LUBRICATION SYSTEM GTEXHAUST ALSTOM DUCT+DAMPER ALSTOM STACK ALSTOM CO2 FLOODING: 56 CYLINDERS, 28 GINGEKERR SYSTEM: STANDBY Learn More -
J-5305 FINISHING PLANT FOR WORSTED AND WOOLENJ-5305 FINISHING PLANT FOR WORSTED AND WOOLEN SPLIT SALE POSSIBLE Learn More