Description Unit 1 - Gtg 1A Overview Plant: Unit 1 Name of the unit: GTG 1A Installed capacity: 42.3 MW Average production per year (last 3 years): 1,866,834,218 MWh Type: Gas turbine (GT) Number of groups: 1 Year of commissioning: 2005 Estimated total useful lifetime: 22 years Land In ownership: Yes Size total: 51,078 m² Size of production area: 9,333 m² Size of arable land / other area: 41,745 m² Buildings Number of buildings: 6 In ownership: Yes Size total: 10,353 m² Size of office area: 939 m² Size of workshop area: 81 m² Size of production area: 9,333 m² General condition: Good Power Plant Design Year of production: 2003 Manufacturer of the main unit: General Electric Contractor: General Electric Engineering department: General Electric Turnkey project: No Plant Occupancy Net plant output: 40 MW Equivalent operating hours 2012: 5,925 Equivalent operating hours 2011: 6,296 Equivalent operating hours 2010: 6,082 Equivalent operating hours 2009: 7,208 Equivalent operating hours 2008: 7,380 Equivalent operating hours 2007: 7,730 Equivalent operating hours 2006: 7,016 Total operating hours since commissioning: 47,637.00 h Number of starts 2012: 166 Number of starts 2011: 166 Number of starts 2010: 237 Number of starts 2009: 25 Number of starts 2008: 25 Number of starts 2007: 16 Number of starts 2006: 63 Total starts since commissioning: 698.00 Maintenance cycle by: Hours Small maintenance cycle: 12,000-CI Large maintenance cycle: 24,000-HGPI Overhaul cycle - major maintenance: 48,000-MI Electrical frequency: 50 Hz Actual condition of the unit: Good Storage of Combustible Size of storage: No Gas Turbine Year of construction: 2003 Manufacturer: GE Model: P G 6 5 9 1 C Type: Frame 6 C Production: 42.3 MWe Pressure ratio: 1/16.4 Flow rate: 110 lb./sec Turbine speed: 7,100 rpm Exhaust gas temperature: 600 °C Dry low NOx combustor: Yes Air quench cooler: No Specific consumption: 310 Sm³/MWh Water injected: No Dry: No Distillate fuel: Yes One axle / two axles: 2 Dual fuel combustion: Yes Fast start capacity: No Hrsg Year of construction: 2004 Manufacturer: NEM Model: HRSG Type: Horizontal Gas temperature entry: 598 °C Gas temperature exit: 102 °C Steam pressure: 58 - 5 kg/cm² Height of chimney or stack: 29 m Number of pressure levels: 2 Pressure in stages HP, MP, LP: HP: 58 bar, LP: 5 bar Production of steam: 65 t/h Actual condition: Good Generator Manufacturer: VATEC-ELIN Model: Outdoor Type: 2 poles, 3 phase, wye connection, 50 Hz Cooling system: Air Rating: 39 MW Voltage: 11.5 kV Power factor: 0.8 Output: 39 MVAr Year of construction: 2003 Year of last extensive inspection or reconstruction: 2008 Transformer Manufacturer: ABB Model: 1ZTR231900 Type / voltage level: 1ZTR231900 high/low Load: 54 MVA Year of construction: 2004 Transformation ratio: 154/11.5 Cooling System Fluid cooling: Yes Cooling tower: No Manufacturer: GEA Type: Fin fan cooler Height: 3,967 m Material: Steel Number of cooling cells: 8 Diameter of vents: 1.25 m Fan speed: 705 rpm Herbicide for biological pollution: No Year of construction: 2005 Year of last extensive inspection or reconstruction: 2008 Expected remaining useful lifetime: 18 years Actual condition: Good Unit 2 - Gtg 1B Overview Plant: Unit 2 Name of the unit: GTG 1B Installed capacity: 42.3 MW Average production per year (last 3 years): 1,904,159,963 MWh Type: Gas turbine (GT) Number of groups: 2 Year of commissioning: 2005 Estimated total useful lifetime: 22 years Power Plant Design Year of production: 2003 Manufacturer of the main unit: General Electric Contractor: General Electric Engineering department: General Electric Turnkey project: No Plant Occupancy Net plant output: 40 MW Equivalent operating hours 2012: 6,434.9 Equivalent operating hours 2011: 6,547.8 Equivalent operating hours 2010: 5,633 Equivalent operating hours 2009: 8,305 Equivalent operating hours 2008: 6,557 Equivalent operating hours 2007: 8,021 Equivalent operating hours 2006: 6,480 Total operating hours since commissioning: 47,978.70 h Number of starts 2012: 182 Number of starts 2011: 182 Number of starts 2010: 205 Number of starts 2009: 25 Number of starts 2008: 19 Number of starts 2007: 23 Number of starts 2006: 32 Total starts since commissioning: 668.00 Maintenance cycle by: Hours Small maintenance cycle: 12,000-CI Large maintenance cycle: 24,000-HGPI Overhaul cycle - major maintenance: 48,000-MI Electrical frequency: 50 Hz Actual condition of the unit: Good Storage of Combustible Size of storage: No Gas Turbine Year of construction: 2003 Manufacturer: GE Model: P G 6 5 9 1 C Type: Frame 6 C Production: 42.3 MWe Pressure ratio: 1/16.4 Flow rate: 110 lb./sec Turbine speed: 7,100 rpm Exhaust gas temperature: 600 °C Dry low NOx combustor: Yes Air quench cooler: No Specific consumption: 310 Sm³/MWh Water injected: No Dry: No Distillate fuel: Yes One axle / two axles: 2 Dual fuel combustion: Yes Fast start capacity: No Hrsg Year of construction: 2004 Manufacturer: NEM Model: HRSG Type: Horizontal <