ABB, GT10B, Combined Cycle Power Plant, 64 MW, 50 Hz, Natural Gas

Description

  1. Overview
    1. Abb combined cycle power plant
    2. Capacity: 32 mw
    3. 50 hz
    4. Natural gas
  2. Gas Turbines
    1. Two abb gt10b gas turbines, 11 mw each
    2. Abb stg (siemens gas turbine)
  3. Steam Turbine
    1. One steam turbine, 44 mw
  4. Operating Hours
    1. 76,000 hours
  5. Condition
    1. This machine is disassembled