Description Overview Inventory number: E-1261 Six Superba heat set machines available Machines can be separated with individual controls for an additional charge, for a total of six machines Superba I (Two Tunnels) Tunnel I: TVP 25-108/703-12G, year 1982, National Board No. 303 36-end creel Tunnel set up to run 24 ends Line entrance (common operator panel and entrance section with Tunnel II) coiler Superba pre-steamer with three circulating fans and control system Superba cooling fan Tunnel entrance section Three meter dead zone Two-meter entrance cooling section with two circulating fans Six-meter heat set section with CBS Two-meter exit cooling section with two circulating fans Tunnel exit Two Superba cooling fans Superba yarn takeoff system Superba MAT 2S accumulator, #596-10 Belmont 24 spindle autodoff winder, take up on carpet tubes SamsoMatic tunnel control system Superba I Tunnel II Tunnel II: TVP 25-108/703-12D, year 1982, National Board No. 304 24-end creel Line entrance (common operator panel and entrance section with Tunnel I) coiler Superba pre-steamer with three circulating fans and control system Superba cooling fan Tunnel entrance Two-meter entrance cooling section with two circulating fans Nine-meter heat set section with CBS Two meter exit-cooling section Tunnel exit Two Superba cooling fans Superba yarn takeoff system Superba B3 manual doff winder with take up on carpet tubes SamsoMatic tunnel control system Superba II (Two Tunnels) Tunnel I: TVP 30-504/852-12G, year 1985, National Board No. 415 24-end creel Line entrance (common operator panel and entrance section with Tunnel II) coiler Superba pre-steamer with three circulating fans and control system Superba cooling fan Tunnel entrance Three meter dead zone Two-meter entrance cooling section with one circulating fan Six-meter heat set section with CBS Two-meter exit cooling section with one circulating fan Tunnel exit Two Superba exit-cooling fans Superba yarn takeoff system Superba B3 manual doff winder with take up on carpet tubes Superba ARG tunnel control system #431-3 Superba II Tunnel II Tunnel II: TVP 30-504/852-12D, year 1985, National Board No. 414 24-end creel Line entrance (common operator panel and entrance section with Tunnel I) coiler Superba pre-steamer with three circulating fans and control system Superba entrance cooling fan Tunnel entrance Three meter dead zone Two-meter entrance cooling section with one circulating fan Six-meter heat set section with CBS Two-meter exit cooling section with one circulating fan Tunnel exit Two Superba cooling fans Superba yarn takeoff system Superba B3 manual doff winder with take up on carpet tubes SamsoMatic tunnel control system Superba III (Two Tunnels) Tunnel I: TVP 24-102/702-1G, year 1981, National Board No. 257 36-end creel Line set up for 36-end production Line entrance (common operator panel and entrance section with Tunnel II) coiler Superba pre-steamer with three circulating fans and control system Superba entrance cooling fan Tunnel entrance section Three meter dead zone Two-meter entrance cooling section with two circulating fans Six-meter heat set section with CBS Tunnel exit Two Superba exit-cooling fans Superb yarn take-up system No winder Superba ARG tunnel control system (no number) Superba III Tunnel II Tunnel II: TVP 24-102/702-1D, year 1982, National Board No. 258 36-end creel Line set up for 24-end production Line entrance (common operator panel and entrance section with Tunnel I) coiler Superba pre-steamer with three circulating fans and control system Superba entrance cooling fan Tunnel entrance section Three meter dead zone Two-meter entrance cooling section with two circulating fans Six-meter heat set section with CBS Two-meter exit cooling section with two circulating fans Tunnel exit Two Superba exit-cooling fans Superba yarn take-off system Superba B3 manual doff winder with take up on carpet tubes SamsoMatic tunnel control system