Description Overview Inventory number: E-4265 New inspection machine with batching unit Drawing number CG101 (drawing attached) Technical Specifications Roller width: 2000 mm Fabric width: 1800 mm Color: standard RAL 6011 Voltage: 460 V Frequency: 60 Hz Max speed: 50 m/min Execution: carbon steel, except for parts in contact with fabric which are stainless steel or anti-corrosive material Air pressure: 6 bar Reverse capability: 15 meters per minute Machine Components One axial unwinder with universal shaft connection to the A-frame, gearmotor driven, controlled by dancer roller with long stroke Inspection table with dragging roller in the inlet Inspection table consists of an upper light and a table in black plastic sheet Dancing roller for synchronisation between the inspection table and the rising batcher Operator platform Rising batcher with two individual gearmotor driven batching rollers controlled by potentiometer for the hardness of the batch Self aligning batcher with automatic sensor Complete with integrated switch cabinet Condition and Execution New machine Carbon steel construction, with stainless steel or anti-corrosive material for parts in contact with fabric Standard paint color: green (RAL 6011); special paint color available upon request Included Items Integrated switch cabinet Drawing number CG101 Location and Shipping Ex-works, Shipment approximately 90 days after receipt of purchase order and all technical specifications Purchase order placed with manufacturing plant in upon receipt of down payment Exclusions Any items expressly excluded above Foundations and any other structural or site preparatory work, including grouting Electrical wiring materials including installation Circuit breaker in main electrical supply line (if required by local regulations) Piping materials for compressed air, including installation Any federal or local surcharges or taxes Installation and start-up services Installation and Warranty Installation and start-up services not included in price Supervision of installation, start-up, and operator training available according to rates for service engineer Supervision of installation requires assistance of plant personnel and use of a forklift Any additional equipment, manpower, etc. required for installation is customer responsibility A technician or officially sanctioned representative must conduct installation to effect full warranty