Sulzer, 16ZAV40S, 1994, 11520 kW, 16 Cylinders, 50 Hz

Description

  1. Inventory Number
    1. E-5754
  2. Power Plants And Generator Sets For Sale
    1. Two (2) units of Siemens gas turbine plant
    2. 100 MW (ISO) each, 10.5 kV, 50 Hz
    3. Siemens V94.2 heavy-duty gas turbines with all relevant auxiliaries
  3. Technical Description / Specification
    1. Two (2) complete gas turbine power plants
    2. Each unit with a rated output of 100 MW at ISO conditions
    3. 10.5 kV, 50 Hz
    4. Each consisting of Siemens V94.2 heavy-duty gas turbines with all relevant auxiliaries in excellent condition
    5. Fully operable, ready for immediate delivery
    6. Fuel: currently on liquid fuel, but gas conversion equipment available
    7. Each GT unit is of single-shaft, single casing design, equipped with 2 silo-type combustion chambers, a 16-stage compressor and a 4-stage turbine
    8. An air-cooled generator, rated at 125 MVA and generating at 10.5 kV is driven from the cold (compressor) end of the GT unit
    9. GT1 and GT2 are currently installed with Siemens diffusion-type burners for operation on distillate-oil liquid fuel
  4. 108 MW Hfo Power Plant, 1991/1993
    1. Sulzer 16ZAV40S engines with Alsthom generator
    2. Ten (10) units making 108 MW at 500 rpm, 50 Hz, 10.5 kV
    3. (4) x 10.24 MW, 34000-36000 hours
    4. (6) x 11.2 MW, 23000-27000 hours
  5. 21 MW Co-Generation Power Plant, 1999/2002
    1. (2) x 10.9 MW, 11 kV, 50 Hz, 600 rpm
    2. MAN-Blackstone 16V 430MB engines
    3. Alsthom and Leroy Sommer generators
    4. Activated in September 2002
    5. Production technology
    6. Diesel engine characteristics: four (4) stroke cycle
    7. Turbocharged diesel driven generator
    8. Running with HFO #6
    9. 16 cylinders – V type
    10. Medium speed rates of 600 rpm
  6. 3 X 24.6 MW Alstom Gas Turbine Generator Sets, 50 Hz
    1. Commissioned in 1995
    2. Gas turbines in 0 hour condition
    3. Alstom turbines, PG 5361 (Frame 5)
    4. 24.6 MW at 5120 rpm
    5. Operating hours before overhaul 22500 ~ 24700
    6. HFO fired with heat rate 13084.5 kJ/kWh
    7. Alstom generators, T T 174-160
    8. 30862 kVA, 10.5 kV, 50 Hz
    9. Graffenstaden gear box, 27.000 kWmech, 5120 / 3000 rpm (input/output)
    10. Includes gas turbine overhaul, repairs to package
    11. Time delay from confirmed order to readiness of shipment at sea port is 4 months
    12. Conversion to other fuel systems, assistance for erection and commissioning are available as options and additional cost