12.5 MW complete biomass/coal power plant (dual fuel)
Technically, the boiler is a coal boiler
Manufacturer: Westinghouse turbine and generator (1953 vintage), Zurn boiler (original boiler at construction)
Year: Facility in 1983
Running hours: It ran at approximately 93% to 97% capacity from 1983 to 2002
60 Hz
Turbine-Generator Specifications
Classification: 1953 Westinghouse condensing, extraction, impulse turbine driving a two-pole AC generator at 3600 rpm
Unit rating: By design, the limitation of the turbine-generator unit is the limitation of the prime mover - the turbine. Thus, maximum output is 12,650 gross kW
Turbine rating - steam pressure: 600 psig
Steam temperature: 825 degrees Fahrenheit
Steam flow: 125,000 lb/hr
Exhaust pressure: 1.5 Hg
Kilowatts: 12,650 kW
Generator rating - voltage: 12,500 AC
Amperage: 625
Power factor: 0.85
Frequency: 60 hertz
KVA: 13,529
Exciter rating - voltage: 250 DC
Amperage: 260
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.