Including id fan, ductwork, cyclonic separator and bag house, 50-foot tall stack for each boiler
Electrical controls mounted in trailer included
Steam header to accept three boilers
Connecting steam and water piping
Electrical wiring and wire ways
Location: USA
English 600 Hp Waste Fired Boiler
Year: 1995
250 pst
Including 500 kw elliott turbine, upgrades 2005
Feed water system with pumps and tanks
Steam supply to 500kw / 60 hz elliott turbine generator
Included is 50-foot x 60-foot three story steel building with 50 by 10 electrical room on the front
Three abb k-line 2200 amp circuit breakers, cutler-hammer 5-section motor control center, allen bradley touch screen for all boiler and fuel systems, and woodward egcp digital controllers for steam turbine / generator
System also includes zurn air system; thermox flue gas monitoring system; and fly ash rejection system with two collectors
Location: USA
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.