Including id fan, ductwork, cyclonic separator and bag house, 50-foot tall stack for each boiler
Electrical controls mounted in trailer included
Steam header to accept three boilers
Connecting steam and water piping
Electrical wiring and wire ways
English 600 Hp Waste Fired Boiler
Year: 1995
250 pst
Including 500 kw elliott turbine, upgrades 2005
Feed water system with pumps and tanks
Steam supply to 500kw / 60 hz elliott turbine generator
Included is 50-foot x 60-foot three story steel building with 50 by 10 electrical room on the front
Three abb k-line 2200 amp circuit breakers, cutler-hammer 5-section motor control center, allen bradley touch screen for all boiler and fuel systems, and woodward egcp digital controllers for steam turbine / generator
System also includes zurn air system; thermox flue gas monitoring system; and fly ash rejection system with two collectors
Request a Quote
✓
Request sent
Thank you, our team will reply to you shortly.
Direct access to our team
Email American Plant & Equipment
Tell us what you want to buy, source, finance, or sell. A machinery specialist will follow up with you.
✓
Thank you. Your request is with the American Plant and Equipment team.
A machinery specialist will follow up with you.
Machinery updates
Subscribe to our email list
Tell us which industries you follow and we will send you the machines that match.
✓
You are on the list.
We will email you when machines that match your interests come in. Unsubscribe from any message.