NovaStar, FM178, Semi-Automatic KN95 Face Mask Line, Capacity 150 Masks per Minute, 4-Layer Material Feed (New)

Description

  1. Overview
    1. Feed material embossing, cutting, forming machine
    2. Produces masks with KN95 respirator film
    3. Capacity: 80 to 150 masks per minute
    4. Machine unwinds material (3 layers nonwoven fabric, 1 layer velvet fabric)
    5. Knurled cutting of mask body once formed
    6. Machine forms mask and feeds through knurled cutter
    7. Controlled by PLC
    8. Aluminum machine frame
    9. Photoelectric detection reduces errors and increases production efficiency
    10. The line is sturdy and has a small footprint
  2. Item 001: Feed Material Embossing, Cutting, Forming Machine
    1. Respirator film machine dimensions: 1350 x 800 x 2000 mm
    2. Weight: 200 kgs
    3. Material shelf (holds raw materials) dimensions: 2200 x 720 x 1800 mm
    4. Material shelf weight: 20 kgs
  3. Item 002: Manual Ear Strap Welding Machine
    1. Capacity: 5 to 10 pieces per minute, depending on operator speed
    2. Ultrasonically welds ear straps to mask body
    3. With adjustable strength
    4. Single-point manual welding device is controlled by foot pedal
    5. Air pressure: 2 to 4 kg per cm²
    6. Weight: 35 kg
    7. Power: 500 watts
    8. Dimensions: 1000 x 6000 x 1400 mm
  4. Item 003: Nose Bridge Welding Machine
    1. Presses the nose bridge into the mask form
    2. Welding time per piece: 0.4 seconds
    3. Delay time: 0.2 seconds
    4. Air pressure: 0.5 MPa
    5. Maximum production capacity: 1500 pieces per hour
    6. Dimensions: 370 x 250 x 175 mm
    7. Packed dimensions: 435 x 280 x 215 mm
    8. Net weight: 7 kgs
    9. Gross weight: 8.5 kgs
  5. Item 004: Face Mask Seal Welding Machine
    1. Presses the open edges together
    2. Uses ultrasonic welding to fasten edges
    3. Capacity: 15 to 30 pieces per minute
    4. Ultrasonic power: 2 kW
    5. Air pressure: 0.4 to 0.8 MPa
    6. Dimensions: 1200 x 600 x 900 mm
    7. Weight: 45 kgs
  6. Lead Time
    1. Lead time: 15 to 20 days from receipt of order plus shipping time