Description Composition of Lm 6000 Pa Gas Turbine Generator Set Skid mount of gas turbine generator: gas turbine and generator installed on same skid mount body and enclosed in box Fuel system of gas turbine: equipped with liquid fuel system and natural gas fuel system Generator Combustion and ventilation air filter Gearbox: reduces 3600 rpm of gas turbine output to 3000 rpm Exhaust device Auxiliary equipment skid mount Skid mounted oil tank of generator / gearbox Skid mount of liquid fuel booster pump Gas fuel booster mount Liquid fuel filtration and heater skid Fire skid mount Air compressor skid mount Air intake cooling and anti-ice device Control room box Contains fuel system, circulating water system, all equipment in good condition Operation History Year of starting generator: December 1995 Year of generators: December 1995 to December 2003 Single fuel: zero # diesel oil First stopping time: December 2003 Hours of first time period: 12,764.5 hours Starting times: 1,296 times Unit put into operation on December 25th, 1995 Currently in state of shutdown Operation hours over years: 1996: 2,100 hours; 1997: 1,209 hours; 1998: 242 hours; 1999: 214 hours; 2000: 168 hours; 2001: 167 hours; 2002: 1,020 hours; 2003: 1,628 hours; 2004: 2,886 hours; 2005: 1,207 hours; 2006: 480 hours; 2007: 861 hours; 2008: / Total running hours: 11,182 hours Total ignition number of starts: 1,940 Operation time of diesel engine: about 8,500 hours Operation time of natural gas: about 2,700 hours Overhaul Overhaul time period: January 2004 to April 2005 Overhaul manufacturer: GE Overhaul title: exchange single fuel system into dual fuel Dual fuel: natural gas and zero # diesel oil Overhaul content: replaced combustion chamber dual nozzle-HPT and LPT Current nozzle model: L47713P05 (dry operation) Hours of operation after overhaul: 3,235.5 hours Starting times after overhaul: 644 times Year of operation after overhaul: December 2005 to December 2007 Second stopping year: December 2007 Total hours of twice time period operation: 11,000 hours Total times of twice time period starting: 1,940 times Gas turbine unit transported to USA repair plant for overhaul in August 2004 New combustor, new high pressure turbine, and new low pressure turbine which can use natural gas and diesel oil were replaced All service and product bulletins issued by GE up to end of 2004 were implemented Unit equipment was in good condition before shutdown Technical Transformation and Major Maintenance Oil to gas transformation in 2004 to reduce fuel cost New dual fuel combustion chamber replaced Software and hardware of gas turbine control system updated Unit can use either liquid or gas fuel alone or both fuels for power generation at same time Complete set of natural gas supply pipeline added Separate natural gas booster skid equipped Natural gas pipeline system including natural gas metering valve and gas purging device equipped on gas turbine body After transformation, operation efficiency of whole unit improved, operation condition good About 3,200 hours of operation and power generation after transformation Equipment Maintenance In strict accordance with GE specifications, daily regular inspection and maintenance plan of gas turbine formulated Regularly carried out strict inspection on gas turbine units Carried out hole probe inspection on gas turbine in strict accordance with hole probe plan Currently, due to shutdown, regular unit barring implemented once a week High-pressure rotor speed: 2,500 rpm Low pressure rotor speed: 200 rpm No borescope but one can be arranged if buyer is present Plant available for inspection but only with a deposit SpecificationsVoltage: 10,500 VPackager: Stewart & StevensonGenerator make: Brush Co.Generator model: BDAX7-290ERJ