Coal Power Plant, 18 MW, 50 Hz, 3x 75 t/h CFB Boilers, 15 MW Extraction Condensing Turbine

Description

  1. Overview
    1. Equipment transfer condition of 3 x 75 t/h secondary hp cfb boiler (5.3 mpa, 485 °c)
    2. 15 mw extraction condensing turbine (4.96 mpa, 470 °c)
    3. Unit equipped with 18 mw power generation (6.3 kv, 50 hz) unit power plant
    4. Optional: turn key installation
  2. Installation History
    1. Installed in 2005
    2. Completed and put into operation in 2006