Description Overview Equipment transfer condition of 3 x 75 t/h secondary hp cfb boiler (5.3 mpa, 485 °c) 15 mw extraction condensing turbine (4.96 mpa, 470 °c) Unit equipped with 18 mw power generation (6.3 kv, 50 hz) unit power plant Optional: turn key installation Installation History Installed in 2005 Completed and put into operation in 2006