Description Overview Plant has very few operation hours Consists of one direct fired boiler installation, heavy fuel oil (HFO) and gas, and a steam turbine in combination with a gas turbine Boiler and steam turbine were commissioned in 1978 In 1988 the GT13E gas turbine has been taken into operation New EV burner unit installed in 1996 New and modern digital control system installed several years ago Gas Turbine Specifications Manufacturer: Alstom/ABB, model GT13E Capacity: 150,000 kW (150 MWe / 18.5 MVA, cos phi 0.8) Frequency: 50 Hz Year: 1988 Speed: 3000 rpm Fuel: Gas Last C-inspection: 2004 Trips: 296 Emission: NOx 75 mg/Nm3 Efficiency: 34.56% Additional Equipment Kawasaki ammonia de-oxidation method DLN combustor technology EV type burners Miscellaneous spare parts