Wuxi Huaguang, UG-75/5.3-M19, 2004, 18 MW, 50 Hz, Coal Fired Power Plant, 2x 75t/h CFB Boilers, 15MW Extraction Condensing Steam Turbine

Description

  1. Overview
    1. 18 mw 50 hz coal fired power plant
    2. Installed in 2005 and completed in 2006
    3. Put into formal operation in 2006
    4. Configuration: 2 x 75 t/h cfb boilers + 1 x 15 mw extraction condensing steam turbine + 1 x 18 mw generator
  2. Boilers
    1. Each boiler is equipped with 2 sets of water cooling rolling type slag coolers
    2. Boiler is equipped with fuel supply system (oil tank, oil pump and ignition device)
  3. Turbine and Generator
    1. Extraction condensing turbine unit, model C15-4.9/0.98
    2. Rated output: 15 mw, maximum output: 18 mw
    3. Generator: 1 x 18 mw