Description Overview Power plant is out of operation since December 2012 Precautions have been taken since that moment to ensure the equipment stays in perfect condition Plant consists of one direct fired boiler installation, heavy fuel oil (HFO) and gas, and a steam turbine in combination with a gas turbine The gas turbine, the boiler and steam turbine can be operated separately and/or in combination Total capacity: 650 MW Commissioning And Upgrades Boiler and steam turbine were commissioned in 1978 In 1988 the GT13E gas turbine was taken into operation New EV burner unit was installed in 1996 A new and modern digital control system was installed several years ago