Description Overview Hydrogen plant 14.4 mm scfd capacity Howe-Baker design 99.9% purity With PSA History Constructed in 1997 Only operated for 6 months at a steel plant in Trinidad Revamped and relocated to in 2005 Operated until 2010 when the refinery was shutdown