Description Overview Hydrogen generating plant engineered by Glitsch Technologies and installed by McAbee Construction in 1995 Design capacity is 1.3 mm scfd (55,000 scfh) Built to US standards and measurements Purity to 99.99% H2 Specifications Reformer holds 10 tubes – currently has 8 installed Voltage 575 V, 60 Hz Condition Plant is now shut down and proper shutdown procedures were followed Mothballed in 2006, boiler dry packed and plant under nitrogen Included Includes waste heat boiler for steam export