New two frame 9, 128 MW each, model 9171, dual fuel, 50 Hz, comes with warranty, gas fuel, complete
New three LM 6000 PD gas turbines, 60 Hz, 44.7 MW, gas fuel, immediate availability
Unused two solar Mars 100 gas turbines, 8.8 MW, 50 Hz, gas fuel, weatherproof enclosure
New two LM 6000 PD gas turbines, 50 Hz, 47 MW, gas fuel, immediate availability
New two Rolls Royce Trent 60 WLE gas turbines, dual fuel, 50 Hz, 60 MW, 3 month delivery
Used two Nuovo Pignone PGT-10 gas turbines, 13.8 kVA, 50 Hz, dual fuel, complete
Used three Westinghouse 251B12 gas turbines, 47 MW, 60 Hz, 5,000 hours since overhaul, 55,000 total
New two GE PGT LM 2500+ G4 gas compressor packages, 34 MW, Nuovo Pignone compressor, complete
Rebuilt two Siemens (701 DU) gas turbines, 50 Hz, 125 MW, dual fuel, with warranty, can operate on HFO
New three frame 7 EA gas turbines, 60 Hz, 80 MW, dual fuel, new units with 18 month warranty
Used 120 MW combined cycle power plant, 2 x Westinghouse B11 gas turbines, 35 MW steam turbine, 50 Hz, HFO fuel, 35,000 hours, 1996
Rebuilt two GE LM 2500 PE gas turbines, 60 Hz, 22.6 MW, gas fuel, rebuilt with warranty, 4 month delivery
New two frame 7 FA, 171 MW each, model 7241, gas fuel, 60 Hz, low NOx
Used GEC Alstom gas turbine, model PG 6541B, natural gas, 50 Hz but can be converted, 38 MW, 15,000 hours since O/H
Used 40 MW LM 6000 PD cogeneration plant, Kvaerner turbine, Mark V controls, 45,000 hours
Used 9.5 MW Mitsubishi diesel power plant, consisting of three 3.195 MW engines, 95 hours, 50 Hz
Used 48 MW power barge, Westinghouse W251B turbine, liquid fuel, can be converted to gas, 50 Hz, 30,000 hours
Used 9.2 MW CHP plant, two solar Centaur gas turbines, 3800 kW, 50 Hz, dual fuel, 1800 kW European steam turbine, complete
Rebuilt GE LM 2500 PE gas turbines, 50 Hz, 22.6 MW, gas fuel, rebuilt with warranty
Used 93 MW GE frame 6 FA gas turbine plant, 88,000 hours, 50 Hz, natural gas, combined cycle
New two solar Titan 130 gas turbines, 50 Hz, 15 MW, new units
New three Siemens SGT 800 gas turbines, 47 MW, 50 Hz, new with warranty, packed and ready to go
Used solar T70 gas turbine with HRSG, 50 Hz, 6600 V, 75200 kW, natural gas, 2003, 15,000 hours since turbine swap
New two GE LMS 100 gas turbines, 50 Hz, 100 MW, 7400 BTU/kWh heat rate, immediate availability
Unused 35 MW GE steam turbine and HRSG, unused, 60 Hz, switchgear and building, no boiler but this could be provided
Coal Plants And Other
Used 2.4 MW tandem steam turbine set, one steam turbine of 1640 kW and one of 700 kW, 50 Hz, 2002 and 1992, 85,000 and 140,000 hours respectively
Used 330 MW complete coal plant, designed for lignite but will operate on other coal, European turbine and boiler, 50 Hz, all auxiliaries, 80,000 hours
Used 5 million litre per year ethanol plant operating on corn, will operate on other grains, suitable for fuel or liquor, 2 x 1500 MAN engines operating on straight palm oil or other vegetable oil, equipment to make biodiesel for engines, complete plant, 50 Hz and can operate in 60 Hz
New two European manufacturer steam turbines, 25 MW, 50 or 60 Hz, 10 month delivery
Used 36 MW coal or biomass plant, Sulzer boiler, Siemens and Kanis steam turbines, 50 Hz, 1982 with substantial refurbishment
New 600 MW complete coal plant, never used, 60 Hz, GE steam turbine, Alstom steam generator
Used 7 MW biomass plant, 50 Hz, wood or any biomass, installed in 2001, complete plant
New 20 MW steam turbine, Hyundai generator, 50 or 60 Hz, 6 month delivery, warranty
Used 45 MW Ansaldo non condensing steam turbine, 60 Hz, overhauled, less than 50,000 hours
Gas And Distillate Fueled
Used two Wartsila 18V220SG natural gas generators, 50 Hz, 3200 kW, 2000, 41,000 hours, complete
Used four Wartsila W20V34SG natural gas generators, 50 Hz, 8.7 MW, 2005, 46,000 hours
Used solar Saturn 20 gas turbines, 50 Hz, 1100 kW, dual fuel, new engine
Used two Halberst gas/diesel engines, 5.2 MW, 50 Hz, can be converted to HFO, third unit available, installed, low hours
Used three LM 2500 gas turbines, engine only, no generator, liquid fuel, 5700 hours, immediate availability
Used four Mitsubishi Westinghouse 701 D gas turbines, 146 MW, dual fuel, 50 Hz, 130,000 hours
Used three Allison 501 KB5 gas turbines, 3575 kW, 60 Hz, 4160 volt, natural gas
Used two Kawasaki GP1500 gas turbines, 1500 kW, 50 Hz, 6600 volt, LP gas, 1993
Used frame 5 N gas turbine, 50 Hz, 24 MW, dual fuel, 4000 lifetime hours, complete
Diesel Sets
Used four Sulzer 15ZAV40S generators, HFO/LDO and gas mixture, can run on straight diesel or HFO, 10.56 MW, 50 Hz, complete plant, 35,000 hours
New three Caterpillar MAK diesel generators, 2.4 MW, HFO compatible, 50 Hz, model 9CM25
New three sets of 9.6 MW, each set consisting of four Daihatsu 8DK-28 diesel 2400 kW gensets, 60 Hz and can be converted to 50 Hz, can run on HFO, immediate
New three Caterpillar MAK diesel generators, 5.7 MW, HFO compatible, 60 Hz, model 12VM32C, three more available at higher price
Heavy Fuel Plants
Used two Wartsila 16V32, 5.3 MW, 60 Hz, 1997, 41,000 hours