Ammann, AE 1615 AT, 1995, 180-240 t/h Capacity, 10 Aggregate Bunkers, Benninghoven Drying Drum

Description

  1. Overview
    1. Ammann 180-240 tons asphalt batching plant
    2. Production capacity: 180-240 tons/hour
    3. Year: 1995
  2. Aggregate Feeding and Drying
    1. 10 aggregate bunkers each 10.0 m³ including conveyor belts
    2. Drying drum Benninghoven, length 12,000 mm, diameter 2,600 mm
    3. Combi burner oil/gas Benninghoven 20,000 kW
  3. Dust Collection
    1. Dust collector system Dantherm 68,000 Nm³/h, year 2004, including exhauster and chimney
  4. Hot Elevator and Mixing Tower
    1. Hot elevator Rex 250 t/h, new overhauled in 2003
    2. Mixing tower Ammann AE 1615 AT including 6x screening deck Haver and Boecker, approximately 60 t hot mineral silo, mineral scale, filler scale, and bitumen dosing system
    3. Double twin shaft mixer 4.0 t, year 1995; wear parts 80% good
  5. Ready Mix Storage and Loading
    1. Ready mix silo 2 x 80 t with direct loading system under the mixing tower
  6. Control System
    1. New Teltronik electric system completely new in 2006
    2. Teltronik automatic computer system new in year 2006
  7. Bitumen Storage
    1. 2 bitumen tanks each 60,000 liter