Complete Production Unit of Bath Mats and Artificial Carpets, 3000 Pcs/Day, with Back Coating

Description

  1. Overview
    1. Production capacity of approximately 3000 pieces per day
  2. Yarn Twisting And Doubling
    1. Savio TDS
  3. Weaving
    1. Equipped with Pickering and Cobble tufting looms
  4. Pile Weaving
    1. Somet Thema 11 looms
    2. Vamatex SP looms
  5. Warping And Warp Tying
    1. Complete Magetron line
  6. Back Coating
    1. Installed with a dryer
  7. Washing
    1. Washing machines with dryer are available